THE EFFECT OF TECHNOLOGY IN THE FIELD OF QUANTITY SURVEYING AND HOW IT AFFECT COST, LABOUR AND TIME


Department Of Quantity Surveying


PAGES: 47
FORMAT: MS WORD
Chapters: 1-5
PRICE: ₦ 5,000.00

THE EFFECT OF TECHNOLOGY IN THE FIELD OF QUANTITY SURVEYING AND HOW IT AFFECT COST, LABOUR AND TIME  

TABLE OF CONTENT

Title page………………..i

Certification………….…ii

Dedication………………iii

Acknowledgement……….iv

Table of content……...…v

CHAPTER ONE:  INTRODUCTION

1.1    background to the study

1.2    statement of the problem

1.3    objectives of the study

1.4    research questions

1.6    significance of the study

1.7    scope/limitations of the study

Limitation of study

References

CHAPTER TWO: LITERATURE REVIEW

2.1 introduction

2.2 conceptual review

Empirical review

References

CHAPTER THREE: RESEARCH METHODOLOGY

3.1 introduction

3.2 research design

3.3 area of the study

3.4 population of the study

3.5 sample size and sampling techniques

3.6 research instrument

3.7 validity of the instrument

3.8 reliability of the instrument

3.9 method of data collection

3.10 method of data analysis

Decision rule

CHAPTER FOUR: DATA ANALYSIS AND INTERPRETATION

Bio data of respondents

Tables based on research questions

Research hypothesis

CHAPTER FIVE: FINDINGS, CONCLUSION AND RECOMMENDATIONS

CONCLUSION

Questionnaire administration

CHAPTER ONE

INTRODUCTION

1.1    BACKGROUND TO THE STUDY

The construction industry has recently witnessed a paradigm shift from traditional paper-based method of service delivery to electronic information exchange using Information Technology (IT), at least in the western world like UK. It is now evident that the adoption of Information Technology can enhance construction productivity and improve communications for effective decision-making and coordination among construction participants. The ability of the industry to avail itself of technology depends on the level of usage by construction participants including the Quantity Surveyor (QS) who plays a major role in the management of project success determinants, such as cost, time and quality.

It is apparent that we live in a dynamic world characterized by incessant technology change. The explosive growth of information and communication technology (ICT) otherwise shortened as information technology (IT) has had unquantifiable impact on business systems and processes (Rivard et al., 2004). Advancement in information technology has made possible fundamental changes in the method of practice in all businesses and industries although at different levels (Li, 2000). The global acceptance and widespread adoption has accelerated the dimensions of competition not only among organizations globally but among professions locally (Hampson and Tatum, 1994).

The construction industry with the aim of leveling their colleagues in other industries have embraced the use of information technology such as internet, computing, telephoning, satellite communication and electronic mailing to perform most, if not all of their activities (Ibidapo, 2000). The quantity surveyors’ ability to avail themselves of these emerging opportunities provided by the advent of information technology depends on the adoption of newtechnologies (Castle, 2002). There is quite a lot of development in all areas of computer application to the industry. Of note are the expert systems, artificial intelligence, knowledge-base systems (KBS), artificial neural networking (ANN), robotics and computer aided design (Arif and Karam, 2001). Rivard et al.(2004) opined that the evolution of information technology will have a profound impact on how organizations in the architectural, engineering and construction industry operate in the way other industries such as manufacturing and banking have adopted and benefited from long ago. He noted that this is already the case in many of the developed countries around the world. In lieu of this, Honey (1998) reported that the turn of the last century has seen a reduction in paper-based operation in quantity surveying (QS) offices in UK while electronic led-processes are leading to less dependence on taking-off sheets and other ancillary stationery. The quantity surveying profession in Nigeria has experienced significant changes over the past decade in terms of the scope and type of services provided within the construction industry (Oladapo, 2006). These changes have occurred primarily in response to changing industry/client demands, information technology developments, increased levels of competition for services and the vital role of the quantity surveying in achieving improved service delivery. Moreover, given the increasingly global nature of construction industry obstinate by extremely high levels of domestic competition and resultant low profit margin levels, there is no doubt that the construction industry has to improve its information flow and project delivery mechanism (Wager, 1998). Thus, as information flow increasingly become electronic, quantity surveying computing facilities, software and databases will need to develop in a compatible manner. Nigerian quantity surveyors will need to adapt to changes in work patterns to improve their efficiency and develop new markets to maintain competitive advantage and enhance profitability through the adoption of IT. In summary, the Nigeria construction industry in general and the quantity surveying profession in particular are facing the challenges of effectively utilizingthe rapid expanding technological environment in which it operates to its full advantage (Oyediran and Odusami, 2004).

1.2    STATEMENT OF THE PROBLEM

It is a known fact that advancement in technology and evolution of information technology as dramatically change the way business is conducted by various professionals. It has reduced the cost of services, reduces labour and saves time. The quantity surveying profession are not left behind, they have also embraced the use of this advanced form of technology in delivering their services. The researcher is therefore examining the effect of this technology in the field of quantity surveying and how it affect cost, labour and time.

1.3    OBJECTIVES OF THE STUDY

The following are the objectives of this study:

1.    To examine the effect of technology in the field of quantity surveying.

2.    To examine how technology affects cost, labour and time in the field of quantity surveying.

3.    To examine the factors limiting the use of technology in the field of quantity surveying

1.4    RESEARCH QUESTIONS

1.    What is the effect of technology in the field of quantity surveying?

2.    How does technology affects cost, labour and time in the field of quantity surveying?

3.    What are the factors limiting the use of technology in the field of quantity surveying?

1.6    SIGNIFICANCE OF THE STUDY

The following are the significance of this study:

1.    The outcome of this study will educate the stakeholders in the quantity surveying profession on the effect of technology in the field of quantity surveying with particular focus on how it affects cost, labour and time.

2.    This research will be a contribution to the body of literature in the area of the effect of personality trait on student’s academic performance, thereby constituting the empirical literature for future research in the subject area.

1.7    SCOPE/LIMITATIONS OF THE STUDY

This study will cover the effect of technology use in the field of quantity surveying

LIMITATION OF STUDY

Financial constraint- Insufficient fund tends to impede the efficiency of the researcher in sourcing for the relevant materials, literature or information and in the process of data collection (internet, questionnaire and interview).

Time constraint- The researcher will simultaneously engage in this study with other academic work. This consequently will cut down on the time devoted for the research work

REFERENCES

Arif, A.A. and Karam, A.H. (2001), “Architectural practices and their use of IT in the Western Cape Province, South Africa”,Journal of Info. Tech. in Construction, 6, 17-34.

Castle, G. (2002), New technology: opportunity or threat? In: D. (ed.)New aspects of quantity surveying Practice, Butterworth Heinemann, Oxford, UK, 189-220.

Hampson, K.D. and Tatum, C.B. (1994), “Strategies for appropriate technology and competitive performance in infrastructure construction”, Proceedings of the National Construction Management Conference, Sydney, Australia,  267-268.

Honey, R. (1998), “Make IT a fundamental part of our business”, Chartered Surveyor, 57.

Ibidapo, O.O. (2000), Appraisal of the impact of information technology in quantity surveying practice in Nigeria, B.Tech thesis, Department of Quantity Surveying, Federal University of Technology, Akure, Nigeria.

Li, H. (2000), “The IT performance evaluation in the construction industry”, Proceedings of the 33rd Hawaii International Conference on System Sciences, Hong Kong.

Oladapo, A.A. (2006), “The impact of ICT on professional practice in the Nigerian construction industry”, The Electronic J. of Info.Sys.in Developing Countries, XXIV(II), 1-19

Oyediran, O.S. and Odusami, K.T. (2004), “Whiter the Nigerian quantity surveyors in the information technology age”, An International Journal of Information and Communication Technology (ICT), 1(1&2), 1-16.

Rivard, H., Froese, T., Waugh, L.M., El-Diraby, T., Mora, R., Torres, H., Gill, S.M. and O’Reilly, T. (2004), “Case studies on the use of information technology in the Canadian construction Industry”,J. of Information Technology in Construction Industry, 9, 9-34.

Wager, D.M. (1998), “Construction management computing: yesterday, today and tomorrow”, in Lansley, P.R. and Harlow, P.A. (Eds), Managing Construction Worldwide: System for managing Construction, 1, 620-630.

.



TYPE IN YOUR TOPIC OR KEYWORD AND CLICK SEARCH:

HOW TO GET THE COMPLETE PROJECT MATERIAL ON THE EFFECT OF TECHNOLOGY IN THE FIELD OF QUANTITY SURVEYING AND HOW IT AFFECT COST, LABOUR AND TIME

  • * Click the green DOWNLOAD Button above

    * Select any option to get the complete project material instantly.

    * Chat our 24/7 customer service desk on WhatsApp# (+234) 0803-766-4978 and get your complete project material instantly.

    * All project materials on this website are well researched by professionals with high level of professionalism.


TESTIMONIES FROM OUR CLIENTS

Please feel free to carefully review some written and captured responses from our satisfied clients.


  • Debby Henry George, Massachusetts Institute of Technology (MIT), Cambridge, USA.

    "Exceptionally outstanding. Highly recommend for all who wish to have effective and excellent project defence. Easily Accessable, Affordable, Effective and effective."

  • Hilary Yusuf, United States International University Africa, Nairobi, Kenya.

    "I saw this website on facebook page and I did not even bother since I was in a hurry to complete my project. But I am totally amazed that when I visited the website and saw the topic I was looking for and I decided to give a try and now I have received it within an hour after ordering the material. Am grateful guys!"

  • Debby Henry George, Massachusetts Institute of Technology (MIT), Cambridge, USA.

    "Researchwap.net is a website I recommend to all student and researchers within and outside the country. The web owners are doing great job and I appreciate them for that. Once again, thank you very much "researchwap.net" and God bless you and your business! ."

  • Lamilare Valentine, Kwame Nkrumah University, Kumasi, Ghana.

    "Great User Experience, Nice flows and Superb functionalities.The app is indeed a great tech innovation for greasing the wheels of final year, research and other pedagogical related project works. A trial would definitely convince you."

  • Sampson, University of Nigeria, Nsukka.

    "I love what you guys are doing, your material guided me well through my research. Thank you for helping me achieve academic success."

  • Cynthia, Akwa Ibom State University .

    "researchwap.com is God-sent! I got good grades in my seminar and project with the help of your service, thank you soooooo much."

  • Elizabeth, Obafemi Awolowo University

    "Sorry, it was in my spam folder all along, I should have looked it up properly first. Please keep up the good work, your team is quite commited. Am grateful...I will certainly refer my friends too."

  • Ali Olanrewaju, Lagos State University.

    "Am happy the defense went well, thanks to your articles. I may not be able to express how grateful I am for all your assistance, but on my honour, I owe you guys a good number of referrals. Thank you once again."

  • Willie Ekereobong, University of Port Harcourt.

    "My Dear Researchwap, initially I never believed one can actually do honest business transactions with Nigerians online until i stumbled into your website. You have broken a new legacy of record as far as am concerned. Keep up the good work!"

  • Theressa, Igbinedion University.

    "WOW, SO IT'S TRUE??!! I can't believe I got this quality work for just 5k...I thought it was scam ooo. I wouldn't mind if it goes for over 5k, its worth it. Thank you!"

  • Joseph, Abia state Polytechnic.

    "I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much researchwap.com, infact, I owe my graduating well today to you guys...."

  • Christiana, Landmark University .
    Christiana, Landmark University .

    "My friend told me about ResearchWap website, I doubted her until I saw her receive her full project in less than 15 miniutes, I tried mine too and got it same, right now, am telling everyone in my school about researchwap.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work"

  • Musa, Federal University of Technology Minna

    "I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!."

  • Ali Obafemi, Ibrahim Badamasi Babangida University, Niger State.

    "I was scared at first when I saw your website but I decided to risk my last 5k and surprisingly I got my complete project in my email box instantly. This is so nice!!!."


  • To contribute to our success story, send us a feedback or please kindly call 2348037664978.
    Then your comment and contact will be published here also with your consent.
    Thank you for choosing researchwap.com.

FREQUENTLY ASKED QUESTIONS

  • How can I get the complete project - THE EFFECT OF TECHNOLOGY IN THE FIELD OF QUANTITY SURVEYING AND HOW IT AFFECT COST, LABOUR AND TIME

    Simply click on the DOWNLOAD green button above and follow the procedure stated.


    Is it a complete project work or just materials?

    Yes, it's a Complete Research Project material. i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data


    What if I want to change the case study for THE EFFECT OF TECHNOLOGY IN THE FIELD OF QUANTITY SURVEYING AND HOW IT AFFECT COST, LABOUR AND TIME, What can i do?

    Chat with Our 24/7 Customer Service Desk Now: WhatsApp# and you will be responded to Instantly


    How long does it take to get the complete project on THE EFFECT OF TECHNOLOGY IN THE FIELD OF QUANTITY SURVEYING AND HOW IT AFFECT COST, LABOUR AND TIME?

    Depending on how fast your payment and details is acknowledged by us, you will get the complete project within 30 minutes. However, on a very good day you can still get it within 15 minutes!


    How will I get my complete project?

    The Complete Project Material will be Delivered via your Email Address in an MS Word document format


    Can I get my Complete Project through WhatsApp?

    Yes! We also send your Complete Research Project to your WhatsApp Number


    What if my Project Supervisor made some changes to a topic i picked from your website?

    Call or Chat With Our 24/7 Custumer Care Desk: +234 8037664978 and you will be responded to Instantly


    Do you assist students with Assignment, Term Paper, Seminar and Project Proposal?

    Call or Chat With Our 24/7 Custumer Care Desk: +234 8037664978 and you will be responded to Instantly


    What if i do not have any project topic idea yet?

    Don't Worry! We've Got Your Covered. Chat with us on WhatsApp# (+234) 0803-766-4978 to Get Instant Help.


    Why should I trust this website?

    We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "TOPNOTCH INFOTECH ENTERPRISE". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!


    10. I have a fresh topic that is not on your site. How do I go about it?

    Don't Worry, Chat with us on WhatsApp# (+234) 0803-766-4978 to Get Instant Help.



PROJECT DETAILS

PAGES: 47
FORMAT: MS WORD
Chapters: 1-5
PRICE: ₦ 5,000.00




TYPE TOPIC OR KEYWORD AND CLICK SEARCH: