AN INVESTIGATION INTO THE EXTENT OF USE OF DISPUTE RESOLUTION TECHNIQUES IN CONSTRUCTION PROJECTS

ABSTRACT

Construction projects are increasingly becoming complex, resulting in complex contract documents. Complex construction can likewise result in complex disputes. Disputes are inevitable in construction projects which predominantly arise from complexity and magnitude of works, multiple prime contracting parties, poorly prepared and/ or executed contract documents, inadequate planning, financial issues and communication problems. Depending on the nature of the relationship between the parties involved in the disputes and the circumstances under which the dispute is evolved, different methods of dispute resolution techniques may be preferable. The objective of this study is to identify the cause of dispute, to identify the existing practice of dispute resolution techniques in construction projects, to evaluate the prevailing dispute handling methods and recommend the most appropriate method. The method adopted for the study was through questionnaire survey where the target respondents were clients, consultants and contractors. Based on the analysed data, there are disputes caused by the clients, consultants and contractors which are capable of resulting to loss of reputation and sour relationship between the stakeholders and also loss of profit and business viability. Negotiation was observed as the most appropriate method of dispute resolution in construction projects in Nigeria as it non time consuming, cost effective and restores business relationship. From the findings it can be concluded that construction disputes are a cause of concern in every project and the solution to this problem is to avoid and cautiously manage them for smooth running of construction process.

TABLE OF CONTENTS

TITLE PAGE ................................................................................................................                      i

DECLARATION .........................................................................................................                       ii

CERTIFICATION .......................................................................................................                        iii

DEDICATION .............................................................................................................                       iv

ACKONOWLEDMENT...............................................................................................                        v-vi

ABSTRACT ..................................................................................................................                      vii

TABLE OF CONTENTS ...............................................................................................                      viii-xi

LIST OF TABLES .........................................................................................................                      xii

CHAPTER ONE: 

1.1       BACKGROUND TO THE STUDY..................................................................                        1-3

1.2       STATEMENT OF THE RESEARCH PROBLEM ............................................                        3

1.3       JUSTIFICATION FOR THE STUDY...............................................................                        4

1.4       AIM AND OBJECTIVES ................................................................................                        4

1.5       SCOPE AND LIMITATION ...........................................................................                        4

CHAPTER TWO: 

2.1       THE CONSTRUCTION PROCESS .................................................................                        5-6

2.2       DISPUTES IN THE CONSTRUCTION INDUSTRY ........................................                       6

2.2.1    Introduction     .....................................................................................                       6-7

2.3       DEFINITION OF DISPUTE ...........................................................................             7-8

2.4       CAUSES OF DISPUTE IN THE INDUSTRY .................................................             8-12

            2.4.1 The Contract Conditions  ........................................................................                       12-15

            2.4.2 The Design Deficiency ............................................................................                      15-18

            2.4.3 The Construction Process  .......................................................................                      19

            2.4.4 The Consumer Reaction  ..........................................................................                     20-21

            2.4.5 Time ..........................................................................................................                    22

2.5     THE IMPACT OF CONSTRUCTION DISPUTES ON THE PROJECT............              22-23

2.6       CONSTRUCTION DISPUTES RESOLUTION TECHNIQUES ......................                        23

2.6.1    INTRODUCTION ..............................................................................             23-25

2.6.2    LITIGATION ......................................................................................                        25-27

            2.6.3    ARBITRATION ..................................................................................                        27-28

2.6.3.1 Arbitration Rules under the ACA ............................................                        28-29

            2.6.3.2 Composition of Arbitral Tribunal ............................................                       29-30

            2.6.3.3 Jurisdiction of an Arbitral Tribunal ..........................................                       30

            2.6.3.4 Challenge to the Jurisdiction of an Arbitral Tribunal ..............                        31

            2.6.3.5 Grounds for Setting Aside an Arbitral Award .........................                        31-33

2.6.4    CONCILIATION .................................................................................                       33-35

            2.6.4.1 Commencement .........................................................................                     35

            2.6.4.2 Conciliators ................................................................................                    35

            2.6.4.3 Institutional Assistance .............................................................                      35-36

            2.6.4.4 Stages in Conciliation ................................................................                     36-37

            2.6.4.5 Legal Effect and Role of the Parties ........................................                      37

            2.6.4.6 Conciliator's Procedure ..............................................................                     37

            2.6.4.7 Disclosure and Confidentiality ..................................................                     37-38

            2.6.4.8 Conciliation and the Limitation Period .....................................                       38-39

2.6.5    MEDIATION ........................................................................................                      39-40

            2.6.5.1 Phases of a mediation  ...............................................................                     40-41

                        2.6.5.2 Mediator's tasks .........................................................................                     41-42

2.6.6    NEGOTIATION .......................................................................................                 42-44

                  2.6.6.1 Steps (Techniques) in Negotiating .............................................                      44-45

2.6.7    MINI-TRIAL .........................................................................................                     45-46

                  2.6.7.1 Commencement ..........................................................................                    46-47

                  2.6.7.2 Characteristics of a Mini-Trial ...................................................                    47-48

2.6.8    EXPERT DETERMINATION ...............................................................                      48-49

2.6.9    ADJUDICATION ...............................................................................                        50-51

            2.6.10  DISPUTE REVIEW BOARD ..............................................................                        52-54

            2.6.11  EARLY NEUTRAL EVALUATION (ENE) ........................................                        54-55

            2.6.12  RENT - A- JUDGE .............................................................................                        55

CHAPTER THREE: 

3.1       INTRODUCTION ...........................................................................................                        56

3.2       DATA COLLECTION............................................................................................                 56

3.3       SURVEY METHOD........................................................................................                        56-58

3.4       SAMPLE FRAME ...........................................................................................                        58

CHAPTER FOUR: 

DATA ANALYSIS:     PRESENTATION AND INTERPRETATION

4.0       INTRODUCTION ...........................................................................................                        59

4.1       DEMOGRAPHIC VARIABLES ANALYSIS ..................................................                        59-64

4.2       ANALYSIS AND DISCUSSIONS ..................................................................                        65

4.2.1    Causes of Construction Disputes........................................................             65-66

4.2.2 The Most Appropriate Technique of resolving Construction Disputes....                        66

CHAPTER FIVE: 

CONCLUSIONS AND RECOMMENDATIONS

5.1       INTRODUCTION .........................................................................................             67

5.2       CONCLUSIONS  ...........................................................................................             67-68

5.3       RECOMMENDATIONS ................................................................................             68-69

REFERENCES ...........................................................................................................             70-72

APPENDIX .................................................................................................................                        73-76

LIST OF TABLES AND FIGURES

Fig.2.1            

Definition of Project dispute resolution satisfaction ....................                   25 Table 1:          

Causes of construction disputes ...............................................                       57 Table 2:          

Respondents Type of Job .........................................................                      59 Table 3:          

Years of Experience .................................................................                      59 Table 4:          

Type of Organisation ...............................................................                       60 Table 5:          

Number of Contracts ever handled ..........................................                       60 Table 6:          

Have you been involved in Construction Dispute......................                      61 Table 7:          

If yes who was responsible ...............................................      .............                       61 Table 8:         

If no, the technique used in preventing dispute ..............................                      62 Table 9:          

Causes of Construction Disputes ..............................................                      63 Table 10:        

Dispute Resolution Techniques in use ......................................                      64

CHAPTER ONE

INTRODUCTION

1.1       BACKGROUND TO THE STUDY: 

Construction is plagued, perhaps more than any other industry, with disputes due to the inherent conflict of interest between the buyers of construction services (i.e. the owner or employer) and the sellers of the services (i.e. the contractor). The buyer wants to receive the most value for its construction finance whereas the seller wants to spend the least amount of money while meeting its contractual obligations. Unfortunately, these obligations are seldom, if ever, stated in clear enough language to preclude misunderstandings. Over the years, the industry has learned to rely on the design engineer or the architect, who formulates the construction documents, i.e. the most likely author of the misunderstanding, to clarify it and to decide on the corresponding responsibilities of the parties (Steve Revay, 1995).

Construction projects are among the most complicated of human enterprises. High levels of art and craft are required to translate an owner’s vision into plans and specifications, then into real structures, one that fits the needs of the individuals and the public. In addition to technical skills, the ability to coordinate the diverse efforts of many individuals is crucial to success.

The parties of a construction contract, the owner and contractor, are a society with a complex set of interrelated relationships requiring cooperation and collaboration to coordinate time, resources, and communication. The main goal of the parties involved in a project’s construction is to have a successful project. This is defined as a project that has been constructed in accordance with the plans and specifications, within the time and cost originally anticipated. The success of a project depends on a number of variables, not the least of which is how the organisations approach problems and conflicts (Diekmann et al. 1994)

Construction projects are increasingly complex, resulting in complex contract documents. Complex construction can likewise result in complex disputes. Disputes is inevitable in construction projects which predominantly arise from complexity and magnitude of works, multiple prime contracting parties, poorly prepared and/ or executed contract documents, inadequate planning, financial issues and communication problems. Any of these factors can overturn a project and lead to complicated litigation, arbitration, mediation, time overrun; increased costs and a relationship break down among members of different parties involved (Motsa, 2006).

Construction relationships in the construction industry all over the world have become more increasingly strained as years goes on and on. Working relationships, communications, and contractual commitments are often not carried in good faith. This has led to most developed countries to search for better alternatives on how to manage disputes in the construction industry. Though it has been seen that disputes in the industry is like an un-incurable disease, means are done to fight the problem.

In the United Kingdom, for example the standard form of contract that is internationally used to new engineering contracts has been subject to change; whereas, in the United States of America the Disputes Review Boards ( DRB’s) which comprises of three board members to manage disputes in construction sites was introduced. All this exercises undertaken have proved to be successful.

Disputes in the construction industry often involve the resolution of complex technical and factual issues. The formal processes such as litigation may often not be the best way of dealing with this type of disputes. Traditionally, arbitration has widely been used, being even included in standard contracts as a means of dispute resolution and has been found to be cheaper and less time consuming than litigation.

In today’s complex construction projects, resolving dispute has become an inevitable part of a project manager's work. This includes a wide variety of activities ranging from the selection of a dispute resolution process to the participation in the actual negotiation. An understanding of the various forms of dispute resolution processes and their critical factors will no doubt be invaluable to project managers in handling disputes.

Formalised dispute resolution techniques like arbitration and litigation have been well developed for the resolution of construction disputes. 

However, many disputes have been amicably resolved satisfactorily, sometimes informally, without the need for arbitration or litigation. ADR methods are the responses to shortcomings of the conventional judicial system such as rigidity and limited choice, especially in the modern commercial world (Hibbered and Newman 1999). Therefore, the introduction of ADR methods is to formalize the informality. The new commercial environment appeals to the application of ADR methods with its characteristics of choice. Often, more than one method may be used in the same dispute and parties can then shape the outcome based on the unique circumstances of the dispute. Fenn and Gameson (1992) have advised that ADR does not seek to replace the court processes, nor does the use of ADR imply that litigation and arbitration should not be used at all; they should only be used when other venues have been exhausted.

1.2       STATEMENT OF THE RESEARCH PROBLEM

The construction industry has become very complicated that political and economic trends are increasing the economic pressure resulting in disputes. Construction projects involve diverse participants mainly the user, client, financer, designer, supervisor, executor, etc these combination invites more disputes and conflicts between the parties. Due to the nature of the contract when responsibilities are shared between numbers of stakeholders conflicts and disputes occurrence are considerable.

Complex construction has brought about complex disputes in the industry and this eventually becomes a burden to the industry in terms of production. Disputes and conflicts have gained frequent rise during construction of projects and this needs an involvement of a neutral body to resolve disputes as early as possible.

1.3       JUSTIFICATION FOR THE STUDY: 

Great concern has been expressed in the recent years regarding the dramatic conflicts and disputes in the construction industry in the whole world.

This has led to most developed countries to search for better alternatives on how to manage disputes in the construction industry.

Developing countries are still facing this problem and the research on this topic will be on what to do either to improve or avoid and manage disputes in our local construction industry.

1.4       AIM AND OBJECTIVES OF THE STUDY : 

The aim of this study is to identify the most appropriate dispute resolution technique in construction projects.

The objectives are:

To identify the causes of construction disputes To identify the existing practice of dispute resolution techniques in construction projects, To evaluate the prevailing dispute handling methods, Recommend the most appropriate method.

1.5       SCOPE AND LIMITATION OF THE STUDY : 

This research was undertaken with a careful study on data collected mainly on questionnaire survey exercise. The research was focused on private and government projects in Benue State.

 

.



TYPE IN YOUR TOPIC OR KEYWORD AND CLICK SEARCH:

HOW TO GET THE COMPLETE PROJECT MATERIAL ON AN INVESTIGATION INTO THE EXTENT OF USE OF DISPUTE RESOLUTION TECHNIQUES IN CONSTRUCTION PROJECTS

  • * Click the green DOWNLOAD Button above

    * Select any option to get the complete project material instantly.

    * Chat our 24/7 customer service desk on WhatsApp# (+234) 0803-766-4978 and get your complete project material instantly.

    * All project materials on this website are well researched by professionals with high level of professionalism.


TESTIMONIES FROM OUR CLIENTS

Please feel free to carefully review some written and captured responses from our satisfied clients.


  • Debby Henry George, Massachusetts Institute of Technology (MIT), Cambridge, USA.

    "Exceptionally outstanding. Highly recommend for all who wish to have effective and excellent project defence. Easily Accessable, Affordable, Effective and effective."

  • Hilary Yusuf, United States International University Africa, Nairobi, Kenya.

    "I saw this website on facebook page and I did not even bother since I was in a hurry to complete my project. But I am totally amazed that when I visited the website and saw the topic I was looking for and I decided to give a try and now I have received it within an hour after ordering the material. Am grateful guys!"

  • Debby Henry George, Massachusetts Institute of Technology (MIT), Cambridge, USA.

    "Researchwap.net is a website I recommend to all student and researchers within and outside the country. The web owners are doing great job and I appreciate them for that. Once again, thank you very much "researchwap.net" and God bless you and your business! ."

  • Lamilare Valentine, Kwame Nkrumah University, Kumasi, Ghana.

    "Great User Experience, Nice flows and Superb functionalities.The app is indeed a great tech innovation for greasing the wheels of final year, research and other pedagogical related project works. A trial would definitely convince you."

  • Sampson, University of Nigeria, Nsukka.

    "I love what you guys are doing, your material guided me well through my research. Thank you for helping me achieve academic success."

  • Cynthia, Akwa Ibom State University .

    "researchwap.com is God-sent! I got good grades in my seminar and project with the help of your service, thank you soooooo much."

  • Elizabeth, Obafemi Awolowo University

    "Sorry, it was in my spam folder all along, I should have looked it up properly first. Please keep up the good work, your team is quite commited. Am grateful...I will certainly refer my friends too."

  • Ali Olanrewaju, Lagos State University.

    "Am happy the defense went well, thanks to your articles. I may not be able to express how grateful I am for all your assistance, but on my honour, I owe you guys a good number of referrals. Thank you once again."

  • Willie Ekereobong, University of Port Harcourt.

    "My Dear Researchwap, initially I never believed one can actually do honest business transactions with Nigerians online until i stumbled into your website. You have broken a new legacy of record as far as am concerned. Keep up the good work!"

  • Theressa, Igbinedion University.

    "WOW, SO IT'S TRUE??!! I can't believe I got this quality work for just 5k...I thought it was scam ooo. I wouldn't mind if it goes for over 5k, its worth it. Thank you!"

  • Joseph, Abia state Polytechnic.

    "I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much researchwap.com, infact, I owe my graduating well today to you guys...."

  • Christiana, Landmark University .
    Christiana, Landmark University .

    "My friend told me about ResearchWap website, I doubted her until I saw her receive her full project in less than 15 miniutes, I tried mine too and got it same, right now, am telling everyone in my school about researchwap.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work"

  • Musa, Federal University of Technology Minna

    "I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!."

  • Ali Obafemi, Ibrahim Badamasi Babangida University, Niger State.

    "I was scared at first when I saw your website but I decided to risk my last 5k and surprisingly I got my complete project in my email box instantly. This is so nice!!!."


  • To contribute to our success story, send us a feedback or please kindly call 2348037664978.
    Then your comment and contact will be published here also with your consent.
    Thank you for choosing researchwap.com.

FREQUENTLY ASKED QUESTIONS

  • How can I get the complete project - AN INVESTIGATION INTO THE EXTENT OF USE OF DISPUTE RESOLUTION TECHNIQUES IN CONSTRUCTION PROJECTS

    Simply click on the DOWNLOAD green button above and follow the procedure stated.


    Is it a complete project work or just materials?

    Yes, it's a Complete Research Project material. i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data


    What if I want to change the case study for AN INVESTIGATION INTO THE EXTENT OF USE OF DISPUTE RESOLUTION TECHNIQUES IN CONSTRUCTION PROJECTS, What can i do?

    Chat with Our 24/7 Customer Service Desk Now: WhatsApp# and you will be responded to Instantly


    How long does it take to get the complete project on AN INVESTIGATION INTO THE EXTENT OF USE OF DISPUTE RESOLUTION TECHNIQUES IN CONSTRUCTION PROJECTS?

    Depending on how fast your payment and details is acknowledged by us, you will get the complete project within 30 minutes. However, on a very good day you can still get it within 15 minutes!


    How will I get my complete project?

    The Complete Project Material will be Delivered via your Email Address in an MS Word document format


    Can I get my Complete Project through WhatsApp?

    Yes! We also send your Complete Research Project to your WhatsApp Number


    What if my Project Supervisor made some changes to a topic i picked from your website?

    Call or Chat With Our 24/7 Custumer Care Desk: +234 8037664978 and you will be responded to Instantly


    Do you assist students with Assignment, Term Paper, Seminar and Project Proposal?

    Call or Chat With Our 24/7 Custumer Care Desk: +234 8037664978 and you will be responded to Instantly


    What if i do not have any project topic idea yet?

    Don't Worry! We've Got Your Covered. Chat with us on WhatsApp# (+234) 0803-766-4978 to Get Instant Help.


    Why should I trust this website?

    We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "TOPNOTCH INFOTECH ENTERPRISE". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!


    10. I have a fresh topic that is not on your site. How do I go about it?

    Don't Worry, Chat with us on WhatsApp# (+234) 0803-766-4978 to Get Instant Help.



PROJECT DETAILS

PAGES: 56
FORMAT: MS WORD
Chapters: 1-5
PRICE: ₦ 5,000.00




TYPE TOPIC OR KEYWORD AND CLICK SEARCH: