STAKEHOLDERS’ PERCEPTION OF THE SEVERITY OF THE CAUSES OF DISPUTES IN THE NIGERIAN CONSTRUCTION INDUSTRY


Department Of Quantity Surveying


PAGES: 56
FORMAT: MS WORD
Chapters: 1-5
PRICE: ₦ 5,000.00

STAKEHOLDERS’ PERCEPTION OF THE SEVERITY OF THE CAUSES OF DISPUTES IN THE NIGERIAN CONSTRUCTION INDUSTRY

TABLE OF CONTENTS

Title Page    -    -    -    -    -    -    -    -    -    

Approval Page    -    -    -    -    -    -    -    -    

Declaration    -    -    -    -    -    -    -    -    

Dedication    -    -    -    -    -    -    -    -    -    

Acknowledgement    -    -    -    -    -    -    -    

Abstract    -    -    -    -    -    -    -    -    -    

Table of Contents    -    -    -    -    -    -    -    

CHAPTER ONE – INTRODUCTION

1.1    Background of the Study    -    -    -    -    -    

1.2    Statement of the Problem    -    -    -    -    

1.3    Objectives of the Study    -    -    -    -    -    -    

1.4    Research Questions    -    -    -    -    -    -    

1.5    Research Hypothesis    -    -    -    -    -    -    

1.6    Significance of the Study    -    -    -    -    -    

1.7    Scope of the Study    -    -    -    -    -    -    

1.8    Limitations of the Study    -    -    -    -    -

1.9    Definition of Terms    -    -    -    -    -    -    

CHAPTER TWO – REVIEW OF RELATED LITERATURE

2.1    Introduction    -    -    -    -    -    -    -    

2.2    Theoretical Framework    -    -    -    -    -    

2.3    Conceptual Framework    -    -    -    -    -    

2.4    Empirical Review    -    -    -    -    -    -

CHAPTER THREE – RESEARCH METHODOLOGY

3.1    Introduction    -    -    -    -    -    -    -    

3.2    Research Design    -    -    -    -    -    -    

3.3    Population of Study    -    -    -    -    -    -    

3.4    Sample size and Sampling Techniques    -    -    -    

3.5    Method of Data Collection    -    -    -    -    -    

3.6    Research Instrument

3.7    Validity of the Instrument    -    -    -    -    -    

3.8    Reliability of the Instrument    -    -    -    -    

3.9    Sampling Method    -    -    -    -    -    -    

CHAPTER FOUR – DATA PRESENTATION AND ANALYSIS

4.1    Introduction    -    -    -    -    -    -    -    

4.2    Data Presentation and Analysis    -    -    -    -    

4.3    Testing Hypothesis    -    -    -    -    -    -    

CHAPTER FIVE – SUMMARY, CONCLUSION AND RECOMMENDATION

5.1    Summary    -    -    -    -    -    -    -    -    

5.2    Conclusion    -    -    -    -    -    -    -    -    

5.3    Recommendations    -    -    -    -    -    -    

    References -    -    -    -    -    -    -    -    

Appendix    -    -    -    -    -    -    -    -

CHAPTER ONE

INTRODUCTION

1 .1 BACKGROUND OF THE STUDY: 

Just like any other industry, the construction industry around the world contribute to the economic development (generation of employment and wealth) of countries with Nigeria not being an exception. This sector of the economy is unique in nature that calls into play proper handling of activities in the industry via the instrumentation of reliable dispute resolution techniques.

The existence of an atmosphere of risk is present in every form of construction project and no matter how small this is, it has the ability of becoming a fully blown out dispute if not checked. With a proper perception of dispute even the littlest of matter would not be taken lightly as it can pose a great threat to the construction works with time. Disputes should be seen as difference of opinion of each party. Dispute arises from a continuous injustice by one party or misinterpretation of meaning by the other. Many such disputes need never arise if the original decision causing disagreement had been made with adequate clarity of purpose and definition or recognition of a changing situation had been built into the decision. Any problem no matter how small should always be looked at and controlled so that it does not get out of hand. Only poor management would assume that a problem would disappear if left over a period of time.

The construction industry is a very competitive high risk business. Problems such as little cooperation, lack of trust and ineffective communication result in adversarial relationship. To overcome most threats that come due to the aforementioned reason for disputes project partnering was developed and proposed as a tool that would help. Partnering here refers to a technique used that generates an organizational environment of trust, open communication and parties’ involvement. Partnering in conventional business setting has been seen as a form of business organization accepted and recognized throughout the world. The Koreans in order to overcome hitches that had rocked their construction industry decided to try out partnership. It involves a long term commitment between two parties for the purpose of achieving specific business objectives by maximizing the effectiveness of each participant. This involves changing the traditional relationship to a shared culture without regard to organizational boundaries. The relationship is based on trust, dedication to common goal and an understanding of each individual’s expectation

Disputes have been established as one of the major factor plaguing the construction industry in Nigeria (Adebayo and Babajide, 2009). One of the major disputes that have occurred in the construction industry in Nigeria is the retrenchment of over five thousand workers by Julius Berger Nigeria plc in the late 90’s. Besides this, several disputes continually arises which have negative impact in the project success in terms of cost, time, quality and the atmosphere for continuing business.

With proper understanding, every form of challenges that comes in the form of disputes could be properly addressed.

1.2 STATEMENT OF THE PROBLEM

Disputes have been a common phenomenon in the construction industry and with the surge in numbers of construction projects, the numbers of disputes are expected to increase, It was conceived that a critical weakness lies in the holistic understanding of disputes and the contributing factors. The fundamental starting point should be to firstly understand the nature of the disputes itself within the context of the industry (Hayarti, 2009).

1.3 AIM

The aim of this research is to identify the severity of the factors that causes disputes.

1.4 OBJECTIVES OF THE STUDY: 

Identify the causes and effects of disputes in construction projects Identify ways by which the effects of disputes could be controlled With the use of the severity index, seek the stakeholders’  perception on the causes of disputes Prioritize the various causes of disputes on how much it affect construction

1.5 JUSTIFICATION OF THE STUDY: 

Disputes have been a common phenomenon in the construction industry and with the surge in the numbers of construction projects, the numbers of disputes are expected to increase. To overcome this, the construction industry has introduced various initiatives to encourage the application of more effective ways of preventing and resolving construction disputes but results have been variable. While much has been done, critics are frequent in arguing that the initiatives have not been effective.

 It was conceived that a critical weakness lies in the holistic understanding of disputes and the contributing factors. The fundamental starting point should be to firstly understand the nature of the disputes itself within the context of the industry. This is necessary before appropriate means of dispute resolution can be effectively identified (Haryati et al, 2009).

1.6 SCOPE AND LIMITATION OF THE STUDY: 

This project focuses on consultants, contractors and clients responses as this formed the basis for my data analysis. Contractors, consultants and clients responses around the Federal Capital Territory were considered.

 A major limitation to this work is that stakeholders’ such as relevant government agencies, communities around which projects are situated, financiers of projects etc., were not taken into cognizance.

.



TYPE IN YOUR TOPIC OR KEYWORD AND CLICK SEARCH:

HOW TO GET THE COMPLETE PROJECT MATERIAL ON STAKEHOLDERS’ PERCEPTION OF THE SEVERITY OF THE CAUSES OF DISPUTES IN THE NIGERIAN CONSTRUCTION INDUSTRY

  • * Click the green DOWNLOAD Button above

    * Select any option to get the complete project material instantly.

    * Chat our 24/7 customer service desk on WhatsApp# (+234) 0803-766-4978 and get your complete project material instantly.

    * All project materials on this website are well researched by professionals with high level of professionalism.


TESTIMONIES FROM OUR CLIENTS

Please feel free to carefully review some written and captured responses from our satisfied clients.


  • Debby Henry George, Massachusetts Institute of Technology (MIT), Cambridge, USA.

    "Exceptionally outstanding. Highly recommend for all who wish to have effective and excellent project defence. Easily Accessable, Affordable, Effective and effective."

  • Hilary Yusuf, United States International University Africa, Nairobi, Kenya.

    "I saw this website on facebook page and I did not even bother since I was in a hurry to complete my project. But I am totally amazed that when I visited the website and saw the topic I was looking for and I decided to give a try and now I have received it within an hour after ordering the material. Am grateful guys!"

  • Debby Henry George, Massachusetts Institute of Technology (MIT), Cambridge, USA.

    "Researchwap.net is a website I recommend to all student and researchers within and outside the country. The web owners are doing great job and I appreciate them for that. Once again, thank you very much "researchwap.net" and God bless you and your business! ."

  • Lamilare Valentine, Kwame Nkrumah University, Kumasi, Ghana.

    "Great User Experience, Nice flows and Superb functionalities.The app is indeed a great tech innovation for greasing the wheels of final year, research and other pedagogical related project works. A trial would definitely convince you."

  • Sampson, University of Nigeria, Nsukka.

    "I love what you guys are doing, your material guided me well through my research. Thank you for helping me achieve academic success."

  • Cynthia, Akwa Ibom State University .

    "researchwap.com is God-sent! I got good grades in my seminar and project with the help of your service, thank you soooooo much."

  • Elizabeth, Obafemi Awolowo University

    "Sorry, it was in my spam folder all along, I should have looked it up properly first. Please keep up the good work, your team is quite commited. Am grateful...I will certainly refer my friends too."

  • Ali Olanrewaju, Lagos State University.

    "Am happy the defense went well, thanks to your articles. I may not be able to express how grateful I am for all your assistance, but on my honour, I owe you guys a good number of referrals. Thank you once again."

  • Willie Ekereobong, University of Port Harcourt.

    "My Dear Researchwap, initially I never believed one can actually do honest business transactions with Nigerians online until i stumbled into your website. You have broken a new legacy of record as far as am concerned. Keep up the good work!"

  • Theressa, Igbinedion University.

    "WOW, SO IT'S TRUE??!! I can't believe I got this quality work for just 5k...I thought it was scam ooo. I wouldn't mind if it goes for over 5k, its worth it. Thank you!"

  • Joseph, Abia state Polytechnic.

    "I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much researchwap.com, infact, I owe my graduating well today to you guys...."

  • Christiana, Landmark University .
    Christiana, Landmark University .

    "My friend told me about ResearchWap website, I doubted her until I saw her receive her full project in less than 15 miniutes, I tried mine too and got it same, right now, am telling everyone in my school about researchwap.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work"

  • Musa, Federal University of Technology Minna

    "I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!."

  • Ali Obafemi, Ibrahim Badamasi Babangida University, Niger State.

    "I was scared at first when I saw your website but I decided to risk my last 5k and surprisingly I got my complete project in my email box instantly. This is so nice!!!."


  • To contribute to our success story, send us a feedback or please kindly call 2348037664978.
    Then your comment and contact will be published here also with your consent.
    Thank you for choosing researchwap.com.

FREQUENTLY ASKED QUESTIONS

  • How can I get the complete project - STAKEHOLDERS’ PERCEPTION OF THE SEVERITY OF THE CAUSES OF DISPUTES IN THE NIGERIAN CONSTRUCTION INDUSTRY

    Simply click on the DOWNLOAD green button above and follow the procedure stated.


    Is it a complete project work or just materials?

    Yes, it's a Complete Research Project material. i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data


    What if I want to change the case study for STAKEHOLDERS’ PERCEPTION OF THE SEVERITY OF THE CAUSES OF DISPUTES IN THE NIGERIAN CONSTRUCTION INDUSTRY, What can i do?

    Chat with Our 24/7 Customer Service Desk Now: WhatsApp# and you will be responded to Instantly


    How long does it take to get the complete project on STAKEHOLDERS’ PERCEPTION OF THE SEVERITY OF THE CAUSES OF DISPUTES IN THE NIGERIAN CONSTRUCTION INDUSTRY?

    Depending on how fast your payment and details is acknowledged by us, you will get the complete project within 30 minutes. However, on a very good day you can still get it within 15 minutes!


    How will I get my complete project?

    The Complete Project Material will be Delivered via your Email Address in an MS Word document format


    Can I get my Complete Project through WhatsApp?

    Yes! We also send your Complete Research Project to your WhatsApp Number


    What if my Project Supervisor made some changes to a topic i picked from your website?

    Call or Chat With Our 24/7 Custumer Care Desk: +234 8037664978 and you will be responded to Instantly


    Do you assist students with Assignment, Term Paper, Seminar and Project Proposal?

    Call or Chat With Our 24/7 Custumer Care Desk: +234 8037664978 and you will be responded to Instantly


    What if i do not have any project topic idea yet?

    Don't Worry! We've Got Your Covered. Chat with us on WhatsApp# (+234) 0803-766-4978 to Get Instant Help.


    Why should I trust this website?

    We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "TOPNOTCH INFOTECH ENTERPRISE". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!


    10. I have a fresh topic that is not on your site. How do I go about it?

    Don't Worry, Chat with us on WhatsApp# (+234) 0803-766-4978 to Get Instant Help.



PROJECT DETAILS

PAGES: 56
FORMAT: MS WORD
Chapters: 1-5
PRICE: ₦ 5,000.00




TYPE TOPIC OR KEYWORD AND CLICK SEARCH: