ABSTRACT

Management has a great effect on the job-site performance of construction skilled workers. This paper discusses "An assessment of the impact of work environment on the construction skilled workers in Imo State, Nigeria. It was carried out with the aim of assessing the efficiency and productivity of skilled workers on construction environment. The questionnaires and field approach was the method of study used. Data for the study were collected through secondary and primary sources and were analyzed by means of simple percentage, severity Index (likert scale) and productivity formula. The study found that certain groups of skilled workers are more productive on public construction work environment while others are more productive on private construction work environment. The study also found out that the percentage agreement between public and private skilled workers in the ranking of productivity improvement factors on construction work environment is very low (16.67%). The study equally identifies and documented productivity improvement factor of skilled workers on building construction site. The study concluded that skilled workers on building construction site environment are productive and recommended good motivation/incentives scheme, quality professional management, inspection/supervisions and adequate supply of tools/materials as criteria factor for improvement of productivity on construction work environment.

              TABLE OF CONTENTS

Content                                            Page

Title page    -    -    -    -    -    -    -    -    -    -    i

Approval    -    -    -    -    -    -    -    -    -    -    ii

Dedication    -    -    -    -    -    -    -    -    -    -    iii

Acknowledgement    -    -    -    -    -    -    -    -    -    iv

Abstract    -    -    -    -    -    -    -    -    -    -    v

CHAPTER ONE

1.0          introduction

1.1background of study

1.2    statement of the problem

1.3        aim and objectives

1.4      research question

1.5  significance of study

       Scope of the study

1.6   the limitation of study

1.7    definition of terms

CHAPTER TWO

2.0       review of related literature

2.1     review of labour productivity studies

2.2.      Historical background of craft.

2.2.1      concept of craft/skilled workers

2.2.2      importance relevance, coherence and attributes Of these craftsmen and their guides thus.

2.2.3.      Example of tradesmen / craftsmen

2.2.4.   Classification of construction craft.

2.3.            Productivity

2.3.1.         Motivation as it affects workers productivity.

2.3.2.         Positive motivation

2.3.3.         Negative motivation

2.3.4.         Factors affecting the productivity

2.3.5.         The definition concept of production

2.3.6.         Artisans and craftsmen

2.3.7     craft and skills acquisition and their Important in the construction industry

2.4.        Importance of skilled worker in the construction Industry

2.5 labour productivity

2.5.1        productivity at the job site

2.5.2    productivity in the construction industry

2.5.3 factors affecting job-site productivity

CHAPTER THREE: RESEARCH METHODOLOGY

3.1.     Introduction

3.2.     Research design

3.3.      Population of study

3.4.     Sample techniques and size

3.5.     Types of data collection

3.5.1.     Secondary data

3.5.2.     Primary data

3.6.     Method of data collection

3.7.     Instrument used for data collection

3.8     method of data analysis Severity index analysis

CHAPTER FOUR

4.0. Data presentation and findings

4.1.         Introduction

4.2      data of response

Observations

4.3.         Documented productivity improvement    Factors of skilled workers on construction sites.

4.4.     Discussion of significant productivity factors

4.4.1.     Good motivation/incentives

4.4.2.         Quality-professional management

4.4.3.         Adequate supply of tools and materials

4.4.4.         Health/energetic workforce

4.4.5.         Clement weather

4.4.6.         Ease of production/technology

CHAPTER FIVE

5.0.     Findings, conclusions and recommendations

5.1.     Summary of findings

5.2.     Conclusion

5.3.          Recommendation

5.4.         Recommendation for further study.

Reference

Appendix 1

Appendix 11

Block layer

Plasterer

Concreter

Carpenter

Painter

Plumber

Electrician

Questionnaire                    

LIST OF TABLE

TABLE 4.1   Percentage representations of the questionnaires.

Table 4.2.     Nature of construction site

Table 4.3.      Nature of trade/craft

Table. 4.4      Respondents level of experience

Table. 4.5.    Ages of respondents

Table. 4.6.    of the level of education

Table. 4.7.    Respondents training/qualification

Table. 4.8     Respondent average gang/daily output

Table. 4.9.      Respondents of average month/daily rate

Table. 4.10.    Ranking of skilled workers productivity factors on construction site

CHAPTER ONE

1.0          INTRODUCTION

1.1BACKGROUND OF STUDY

Productivity has become the buzzword of the time as it is generally agreed that the more productivity the better.  However, productivity in construction industry is discouragingly low. The effect of this cannot be overemphasized.

    Aboyade (1966) believed a country's development process depends on the capacity of the country's construction industry, which accounts for half of the country's fixed capital accumulation. Horneir (1987) confirmed the importance of construction industry by asserting that 10% increase in construction labour productivity will represent an enormous annual saving.

    Productivity reflects a variety of factors acting together to increase the value of output faster than the cost of input. McBeath (1974), Nwaroh (1987) and Kendrick (1977) found Mali's (1978) definition of productivity acceptable. Mali (1978) defines productivity as "the measure of how well resources are brought together in organization and utilized for accomplishing a set of results" that is productivity is reaching the highest level of performance with least expenditure of resources. Riggs and Felix (1983) and Bain (1982) said as much when they stated that productivity Is not a measure of output produced; rather it is a measure of how well resources are combined and utilized to accomplish desirable results. It is, therefore, apparent that construction industry in Nigeria is a major contributor to the gross national product (GNP)

    Nwachukwu (2002) classified this industry under four main segments

(i)    The building segment

(ii)      The civil segment

(iii)     The mechanical/electrical segment

(iv)      Industrial/heavy Engineering segment

According to him, Nwachukwu (2002), the building industry segment in Nigeria constitute about 67% of the total construction activities in the country. Unfortunately, building construction site in Nigeria are currently passing through gloomy and difficult time as oppose to what used to be the boom situation in the early seventies, many factors such as high dependant of foreign building material and technology, lack of adequate finance, unfavorable government policies etc, have been identify as some of the problem of lack of productivity in construction work environment which has resulted to project abandonment, project failure, project delay.

Another major problem that has recently attracted the attention of building stakeholders in the industry is the issue of "UNSKILLED" in the construction environment which has resulted to low productivity on building environment. This state of affairs does not represent a good image for the industry, hence the need to ask question "What can be done" it is against this background that this research an assessment of the impact of work environment on the productivity of construction skilled worker. A case study of Imo state Nigeria was conserved.

1.2    STATEMENT OF THE PROBLEM

        Most construction project site in Nigeria is being managed by unqualified person who lacks the requisite capacity to identify test of work environment. Investigation have shown that there is serious declined in the number of young men and women taken up vocation or apprenticeship in specialized construction place. This has created a situation where most men and women (unskilled construction workers) who don't have proper and adequate training on the construction work environment and its procedures, such scenario constitute a serious problem to the building process not only in term of poor quality work, delay or abandonments of project but also term of low productivity which hinder national development.

  Many factors are internally generated this controllable by management, some factor are however beyond management control (e.g. nutrition type of workers, change in climatic condition etc) and their impact are beyond the scope of the present discourse.

1.3        AIM AND OBJECTIVES

  The aim of this study is to assess the efficiency and productivity of construction skilled workers in Nigeria with Imo state as a case study.

The objectives of the study are as follows

1.  To identify productivity factor in the construction work environment.

2.  To what extent can skilled workers contribute to the productivity and successful  

project delivery?

3.  To determine whether construction skilled workers are productive or not.

1.4      RESEARCH QUESTION

       The study would consider the following question.

1.   What are the major factors that contribute to productivity on the construction

environment?

2.   What strategies can be adopted for measuring productivity and performance on

site?

3.  To what extent can skilled workers contribute to the productivity and successful

project delivery?

4.  How does this factor contribute to achievement or non achievement of project

target on site?

5.  To what extent can unskilled workers contribute to waste of resources, failure

or unsuccessful project delivery?

6.  How effective are these factors when applied

This study would attempt to provide answer to the above question.   1.5  SIGNIFICANCE OF STUDY

    Productivity has a great significance in construction labour productivity constitute a significant part of production input for construction project. In the construction industry, many external and internal factors are never constant and are difficult to anticipate. This factor leads to continuous variation in labour productivity. It is necessary to make sure that a reduction in productivity does not affect the plan and schedule of the work and does not cause delay. The  consequences of these delays could result in serious money losses. Further, considerable cost can be saved if productivity is improved because the same work can be done with less manpower, thus reducing overall labour

        SCOPE OF THE STUDY

   The study would be of immense value to all the construction skilled workers in the construction work environment in Nigeria. It hopes to suggest way for improvement of performance, permit efficient utilization of resources as well as to promote knowledge and research general issue of productivity on construction industry in Nigeria. Above all the study would contribute to the growth of construction industry in Nigeria and then strengthen the nation economy.

1.6   THE LIMITATION OF STUDY

  Although the focus of the study is Nigeria, the study is limited to southeast Nigeria. It is believed that construction skilled workers are not illiterates and have the same character nationwide. Therefore the situation/workforce behaviors are the same. Productivity assessment for the purpose of this study is only limited to construction and work environment. It is hoped that the study would achieve the intended aim and objectives.

1.7    DEFINITION OF TERMS

 PRODUCTIVITY: it is the relationship between goods produced or a service provided and the resource consume in doing it (TOFFIAR 1981)

ASSESSMENT: the value or amount at which something is calculated; it is the judgment or opinion of something.

SKILLED WORKER: it is also known as tradesmen, these are any worker who has some special skills, knowledge or ability in their work especially in the construction industry.

CONSTRUTION SITE: Pieces of ground were building construction or construction works/activities takes place.

ENVIRONMENT: This the sum total of all internal and external influences and condition affecting construction in developing activities.

.



TYPE IN YOUR TOPIC OR KEYWORD AND CLICK SEARCH:

HOW TO GET THE COMPLETE PROJECT MATERIAL ON ASSESSMENT OF THE IMPACT OF WORK ENVIRONMENT ON THE PRODUCTIVITY OF CONSTRUCTION SKILLED WORKERS IN IMO STATE, NIGERIA

  • * Click the green DOWNLOAD Button above

    * Select any option to get the complete project material instantly.

    * Chat our 24/7 customer service desk on WhatsApp# (+234) 0803-766-4978 and get your complete project material instantly.

    * All project materials on this website are well researched by professionals with high level of professionalism.


TESTIMONIES FROM OUR CLIENTS

Please feel free to carefully review some written and captured responses from our satisfied clients.


  • Debby Henry George, Massachusetts Institute of Technology (MIT), Cambridge, USA.

    "Exceptionally outstanding. Highly recommend for all who wish to have effective and excellent project defence. Easily Accessable, Affordable, Effective and effective."

  • Hilary Yusuf, United States International University Africa, Nairobi, Kenya.

    "I saw this website on facebook page and I did not even bother since I was in a hurry to complete my project. But I am totally amazed that when I visited the website and saw the topic I was looking for and I decided to give a try and now I have received it within an hour after ordering the material. Am grateful guys!"

  • Debby Henry George, Massachusetts Institute of Technology (MIT), Cambridge, USA.

    "Researchwap.net is a website I recommend to all student and researchers within and outside the country. The web owners are doing great job and I appreciate them for that. Once again, thank you very much "researchwap.net" and God bless you and your business! ."

  • Lamilare Valentine, Kwame Nkrumah University, Kumasi, Ghana.

    "Great User Experience, Nice flows and Superb functionalities.The app is indeed a great tech innovation for greasing the wheels of final year, research and other pedagogical related project works. A trial would definitely convince you."

  • Sampson, University of Nigeria, Nsukka.

    "I love what you guys are doing, your material guided me well through my research. Thank you for helping me achieve academic success."

  • Cynthia, Akwa Ibom State University .

    "researchwap.com is God-sent! I got good grades in my seminar and project with the help of your service, thank you soooooo much."

  • Elizabeth, Obafemi Awolowo University

    "Sorry, it was in my spam folder all along, I should have looked it up properly first. Please keep up the good work, your team is quite commited. Am grateful...I will certainly refer my friends too."

  • Ali Olanrewaju, Lagos State University.

    "Am happy the defense went well, thanks to your articles. I may not be able to express how grateful I am for all your assistance, but on my honour, I owe you guys a good number of referrals. Thank you once again."

  • Willie Ekereobong, University of Port Harcourt.

    "My Dear Researchwap, initially I never believed one can actually do honest business transactions with Nigerians online until i stumbled into your website. You have broken a new legacy of record as far as am concerned. Keep up the good work!"

  • Theressa, Igbinedion University.

    "WOW, SO IT'S TRUE??!! I can't believe I got this quality work for just 5k...I thought it was scam ooo. I wouldn't mind if it goes for over 5k, its worth it. Thank you!"

  • Joseph, Abia state Polytechnic.

    "I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much researchwap.com, infact, I owe my graduating well today to you guys...."

  • Christiana, Landmark University .
    Christiana, Landmark University .

    "My friend told me about ResearchWap website, I doubted her until I saw her receive her full project in less than 15 miniutes, I tried mine too and got it same, right now, am telling everyone in my school about researchwap.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work"

  • Musa, Federal University of Technology Minna

    "I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!."

  • Ali Obafemi, Ibrahim Badamasi Babangida University, Niger State.

    "I was scared at first when I saw your website but I decided to risk my last 5k and surprisingly I got my complete project in my email box instantly. This is so nice!!!."


  • To contribute to our success story, send us a feedback or please kindly call 2348037664978.
    Then your comment and contact will be published here also with your consent.
    Thank you for choosing researchwap.com.

FREQUENTLY ASKED QUESTIONS

  • How can I get the complete project - ASSESSMENT OF THE IMPACT OF WORK ENVIRONMENT ON THE PRODUCTIVITY OF CONSTRUCTION SKILLED WORKERS IN IMO STATE, NIGERIA

    Simply click on the DOWNLOAD green button above and follow the procedure stated.


    Is it a complete project work or just materials?

    Yes, it's a Complete Research Project material. i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data


    What if I want to change the case study for ASSESSMENT OF THE IMPACT OF WORK ENVIRONMENT ON THE PRODUCTIVITY OF CONSTRUCTION SKILLED WORKERS IN IMO STATE, NIGERIA , What can i do?

    Chat with Our 24/7 Customer Service Desk Now: WhatsApp# and you will be responded to Instantly


    How long does it take to get the complete project on ASSESSMENT OF THE IMPACT OF WORK ENVIRONMENT ON THE PRODUCTIVITY OF CONSTRUCTION SKILLED WORKERS IN IMO STATE, NIGERIA ?

    Depending on how fast your payment and details is acknowledged by us, you will get the complete project within 30 minutes. However, on a very good day you can still get it within 15 minutes!


    How will I get my complete project?

    The Complete Project Material will be Delivered via your Email Address in an MS Word document format


    Can I get my Complete Project through WhatsApp?

    Yes! We also send your Complete Research Project to your WhatsApp Number


    What if my Project Supervisor made some changes to a topic i picked from your website?

    Call or Chat With Our 24/7 Custumer Care Desk: +234 8037664978 and you will be responded to Instantly


    Do you assist students with Assignment, Term Paper, Seminar and Project Proposal?

    Call or Chat With Our 24/7 Custumer Care Desk: +234 8037664978 and you will be responded to Instantly


    What if i do not have any project topic idea yet?

    Don't Worry! We've Got Your Covered. Chat with us on WhatsApp# (+234) 0803-766-4978 to Get Instant Help.


    Why should I trust this website?

    We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "TOPNOTCH INFOTECH ENTERPRISE". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!


    10. I have a fresh topic that is not on your site. How do I go about it?

    Don't Worry, Chat with us on WhatsApp# (+234) 0803-766-4978 to Get Instant Help.



PROJECT DETAILS

PAGES: 81
FORMAT: MS WORD
Chapters: 1-5
PRICE: ₦ 5,000.00




TYPE TOPIC OR KEYWORD AND CLICK SEARCH: