TIME SERIES ANALYSIS ON CONSUMPTION OF ELECTRICITY IN KWARA STATE (A CASE STUDY OFFA NEPA DISTRICT OFFICE FROM 2001-2015)  

TABLE OF CONTENT

COVER PAGE 

APPROVAL PAGE 

DEDICATION 

ACKNOWLEDGEMENT

TABLE OF CONTENT

1.1 INTRODUCTION

1.2 BACKGROUND AND ITS OPERATION 

1.3 SIGNIFICANCE

1.4 SCOPE OF STUDY

1.5 AIMS AND OBJECTIVE 

1.6 PROBLEMS AND LIMITATION OF STUDY 

1.7 DEFINITION OF TERMS 

1.8 ABBREVIATION USED

CHAPTER TWO 

2.0 LITERATURE REVIEW

2.1 METHOD OF DATA ANALYSIS 

2.2 TIME SERIES ANALYSIS 

2.3 IMPORTANCE OF TIME SERIES 

2.4 NATURE OF TIME SERIES 

2.5 CHARACTERISTICS OF TIME SERIES 

2.6 TIME SERIES MODELS 

2.7 OTHER COMPONENT OF THE TIME SERIES MODEL 

2.8 AUTO REGRESSIVE MODEL

2.8.1 FIRST ORDER AND SECOND ORDER OF REGRESSIVE MODEL

2.8.2 COMPUTATION OF ESTIMATE 

2.8.3 YULE PROCESS AR(2) PARAMETER PROCESS 

2.8.4 AUTO CORRELATION FUNCTION FOR AR(2)

2.8.5 FOURIER ANALYSIS 

2.8.6 SPECTRUM OF A TIME SERIES 

2.8.7. PERIODIOGRAM

2.8.8 CORRELATIONS

2.8.9 IMPORTANCE OF CORRELATION 

CHAPTER THREE 

METHODOLOGY 

3.0 THEMED OF ESTIMATING TREND 

3.1 LEAST SQUARE METHOD 

3.2 MOVING AVERAGE METHOD 

3.3 SEMI-MOVING AVERAGE METHOD 

3.4 FREE HAND METHOD

3.5 ESTIMATION OF SEASONAL VARIATION

3.6 SIMPLE AVERAGE METHOD

3.7 PERCENTAGE TREND METHOD

3.8 RATIO TO MOVING AVERAGE 

3.9 FORECASTING 

3.9.0 SHORT TERM FORECASTING 

3.9.1 INTERMEDIATE FORECASTING     

3.9.2. LONG TERM FORECASTING 

3.9.4 GENERALIZED TEST OF HYPOTHESIS 

CHAPTER FOUR 

4.1 ANALYSIS OF DATA 

CHAPTER FIVE 

5.1 SUMMARY OF FINDING 

5.2 CONCLUSION 

5.3 RECOMMENDATION 

5.4 BIBLIOGRAPHY

CHAPTER ONE

1.0 INTRODUCTION 

The primary aim of National Electrical Power Authority (NEPA) is in cardinal point which is to generate, transmission, distribution and sales electricity within and outside country. 

National Electric Power Authority NEPA can be regarded as heart beat of the nation economy as the operation of machines use in industries and most household equipment depend on electricity. 

Today National Electric Power Authority (NEPA) meets total maximum energy demand from the total installed capacity of the Authority power station which is 600mw, the terminal power station are strategically located at Egbin, Ijora, Delta Ugheli, Sapele and Afan, while the hydro power station generate are located at Kanji, Jebba and Shoro, the terminal power station generate electricity for exportation into grid system. 

As part of the positive effort of NEPA to ensure the electricity generated reach the appropriate quarters in the next millennium, it has put in place 11,000km of transmission line running across the nation. 

Many researchers had previous carried out research work on NEPA, on some aspect of electricity consumption with related objective. Individual article and study of NEPA, they have put forward many analysis and suggestion basically on consumption, supply and distribution of electricity. 

According to Chief A.O. Osho of AbuleEgba Community in Lagos State, put up a protest on behalf of the community in the daily times of “21st of March 1991” WHY DO WE HAVE INCENSANT POWER FAILURE, Mr. MuyiwaOtunowo (P.R.O) Nepa Lagos South directorable through a booklet title “planning ahead of NEPA” answered the question he said NEPA plans ahead a very much so to meet adequate constant and supply of electricity, the future demand must be known since we can not produce and store electricity. The national electricity as can be done to most of consumer goods or water. 

A journal, “an energy improving generation and distribution” with the dismal state of power supply in the country, it is very necessary that we must continue to explore means to boosting power generation, transmission and distribution, a journal on energy March 25th 1996. Another study is that of Mr. Shuaib I.A. 1985 written on Statistical Analysis on the Consumption of Electricity in Kwara State from 1976 – 1985, he aim in creating a format for planning and forecast future electricity consumption. 

The regression equation showing units of electricity consumption which was consumedImageuse to predict 1986, 1987, though there is an increase in consumption of electricity still the prediction is inconsistent due to lack of variation. 

1.2 NEPA AND ITS OPERATION (BACKGROUND) 

The management of the Nigeria power system is a monopoly vested in the National Electricity Power Authority [NEPA] , its main objective is to generate, transmit and distribute electric power throughout the nation. 

The National Electric Power Authority [NEPA] was established by Decree 24 of April 1972 in an amalgamation of two bodies, the Electricity Co-operation of Nigeria [ECN] and the Niger Dam Authority [NDA] that were healthier to responsible for generating and distributing electricity power, the Nigeria power system consist of total eight (8) power station, five (5) terminal, three (3) hydro with a total installed capacity of 600mw, interconnected over a network of 330kv transmission line. Transmission of bulk power to the major load center are supply with power at 132kv (of which there is a total of 83132kv substation) from where the voltage is still transformed to further low level [33kv, 11kv, 66kv, 3.3kv] for distribution. 

The ECN and NDA later give birth to NEPA, by the virtual of that decree, NEPA was mandated to maintain the efficient co-ordination and economic system of electricity supply for the whole nation. 

The National Electric Power Authority came to Ilorin office was responsible for supply of electricity to the whole of Kwara State. The District office comprises of account department, computer department, marketing department, engineering department, e.t.c. with their respective heads. 

The district office is headed by District Manager and the consumer are classify into three groups, the residential consumer, the commercial consumer, and the industrial consumer. 

1.3 SIGNIFICANCE OF STUDY 

This project is to highlight the uses of statistics and its techniques in analyzing data in respect of electricity, and forecast the future consume two pattern. 

1.4 SCOPE OF THE STUDY 

The study deal with consumption of electricity in Kwara State Ilorin undertaking. The data available is that of units consumed in [KWHX 10] between 1989 – 2003. The data was extracted from account and sales department of NEPA Ilorin Districts office. 

1.5 AIMS AND OBJECTIVE 

i. To identify and fit model for the study and forecast monthly value for it. 

ii. To test the variation with the year 

iii. To test for the average consumption of electricity on monthly basis. 

iv. To analyze time series of monthly power consumption in Kwara State [Ilorin undertaking]. 

1.6 PROBLEM AND LIMITATION OF THE STUDY 

There are many limitation that hinder the extent at which research can carried out one of which is inadequacies of textbook especially relating to the topic. Another problem encountered is the negative attitude of the management of the chosen case study, feeling reluctant to supply accurate record of the authority. 

1.7 DEFINITION OF TERMS 

⦁ Consumer: Any person or corporate body supply with electricity by the NEPA. 

⦁ Residential Domesic Consumer: A consumer who use the premises exclusive as a residence house. 

⦁ Commercial consumer: A consumer who use his premises for any purpose other than exclusively as a residence or as a factory for manufacturing goods. 

⦁ Industrial consumer: A consumer who use it for manufacturing goods e.g. global soap and detergent company. 

1.8 ABBREVIATION USED 

N.E.P.A – National Electricity Power Authority 

E.C.N – Electricity Corporation of Nigeria 

N.D.A – Niger Dam Authority 

M.W. – Mega Watt 

K.V. – Kilo-Volt 

.



TYPE IN YOUR TOPIC OR KEYWORD AND CLICK SEARCH:

HOW TO GET THE COMPLETE PROJECT MATERIAL ON TIME SERIES ANALYSIS ON CONSUMPTION OF ELECTRICITY IN KWARA STATE (A CASE STUDY OFFA NEPA DISTRICT OFFICE FROM 2001-2015)

  • * Click the green DOWNLOAD Button above

    * Select any option to get the complete project material instantly.

    * Chat our 24/7 customer service desk on WhatsApp# (+234) 0803-766-4978 and get your complete project material instantly.

    * All project materials on this website are well researched by professionals with high level of professionalism.


TESTIMONIES FROM OUR CLIENTS

Please feel free to carefully review some written and captured responses from our satisfied clients.


  • Debby Henry George, Massachusetts Institute of Technology (MIT), Cambridge, USA.

    "Exceptionally outstanding. Highly recommend for all who wish to have effective and excellent project defence. Easily Accessable, Affordable, Effective and effective."


  • Hilary Yusuf, United States International University Africa, Nairobi, Kenya.

    "I saw this website on facebook page and I did not even bother since I was in a hurry to complete my project. But I am totally amazed that when I visited the website and saw the topic I was looking for and I decided to give a try and now I have received it within an hour after ordering the material. Am grateful guys!"


  • Debby Henry George, Massachusetts Institute of Technology (MIT), Cambridge, USA.

    "Researchwap.net is a website I recommend to all student and researchers within and outside the country. The web owners are doing great job and I appreciate them for that. Once again, thank you very much "researchwap.net" and God bless you and your business! ."


  • Lamilare Valentine, Kwame Nkrumah University, Kumasi, Ghana.

    "Great User Experience, Nice flows and Superb functionalities.The app is indeed a great tech innovation for greasing the wheels of final year, research and other pedagogical related project works. A trial would definitely convince you."


  • Sampson, University of Nigeria, Nsukka.

    "I love what you guys are doing, your material guided me well through my research. Thank you for helping me achieve academic success."


  • Cynthia, Akwa Ibom State University .

    "researchwap.com is God-sent! I got good grades in my seminar and project with the help of your service, thank you soooooo much."


  • Elizabeth, Obafemi Awolowo University

    "Sorry, it was in my spam folder all along, I should have looked it up properly first. Please keep up the good work, your team is quite commited. Am grateful...I will certainly refer my friends too."


  • Ali Olanrewaju, Lagos State University.

    "Am happy the defense went well, thanks to your articles. I may not be able to express how grateful I am for all your assistance, but on my honour, I owe you guys a good number of referrals. Thank you once again."


  • Willie Ekereobong, University of Port Harcourt.

    "My Dear Researchwap, initially I never believed one can actually do honest business transactions with Nigerians online until i stumbled into your website. You have broken a new legacy of record as far as am concerned. Keep up the good work!"


  • Theressa, Igbinedion University.

    "WOW, SO IT'S TRUE??!! I can't believe I got this quality work for just 5k...I thought it was scam ooo. I wouldn't mind if it goes for over 5k, its worth it. Thank you!"


  • Joseph, Abia state Polytechnic.

    "I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much researchwap.com, infact, I owe my graduating well today to you guys...."


  • Christiana, Landmark University .

    "My friend told me about ResearchWap website, I doubted her until I saw her receive her full project in less than 15 miniutes, I tried mine too and got it same, right now, am telling everyone in my school about researchwap.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work"


  • Musa, Federal University of Technology Minna

    "I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!."


  • Ali Obafemi, Ibrahim Badamasi Babangida University, Niger State.

    "I was scared at first when I saw your website but I decided to risk my last 5k and surprisingly I got my complete project in my email box instantly. This is so nice!!!."


  • To contribute to our success story, send us a feedback or please kindly call 2348037664978.
    Then your comment and contact will be published here also with your consent.
    Thank you for choosing researchwap.com.

FREQUENTLY ASKED QUESTIONS

  • How can I get the complete project - TIME SERIES ANALYSIS ON CONSUMPTION OF ELECTRICITY IN KWARA STATE (A CASE STUDY OFFA NEPA DISTRICT OFFICE FROM 2001-2015)

    Simply click on the DOWNLOAD green button above and follow the procedure stated.


    Is it a complete project work or just materials?

    Yes, it's a Complete Research Project material. i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data


    What if I want to change the case study for TIME SERIES ANALYSIS ON CONSUMPTION OF ELECTRICITY IN KWARA STATE (A CASE STUDY OFFA NEPA DISTRICT OFFICE FROM 2001-2015), What can i do?

    Chat with Our 24/7 Customer Service Desk Now: WhatsApp# and you will be responded to Instantly


    How long does it take to get the complete project on TIME SERIES ANALYSIS ON CONSUMPTION OF ELECTRICITY IN KWARA STATE (A CASE STUDY OFFA NEPA DISTRICT OFFICE FROM 2001-2015)?

    Depending on how fast your payment and details is acknowledged by us, you will get the complete project within 30 minutes. However, on a very good day you can still get it within 15 minutes!


    How will I get my complete project?

    The Complete Project Material will be Delivered via your Email Address in an MS Word document format


    Can I get my Complete Project through WhatsApp?

    Yes! We also send your Complete Research Project to your WhatsApp Number


    What if my Project Supervisor made some changes to a topic i picked from your website?

    Call or Chat With Our 24/7 Custumer Care Desk: +2348037664978 and you will be responded to Instantly


    Do you assist students with Assignment, Term Paper, Seminar and Project Proposal?

    Call or Chat With Our 24/7 Custumer Care Desk: +2348037664978 and you will be responded to Instantly


    What if i do not have any project topic idea yet?

    Don't Worry! We've Got Your Covered. Chat with us on WhatsApp# (+234) 0803-766-4978 to Get Instant Help.


    Why should I trust this website?

    We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "TOPNOTCH INFOTECH ENTERPRISE". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!


    I have a fresh topic that is not on your site. How do I go about it?

    Don't Worry, Chat with us on WhatsApp# (+234) 0803-766-4978 to Get Instant Help.



PROJECT DETAILS

PAGES: 75
FORMAT: MS WORD
Chapters: 1-5
PRICE: ₦ 5,000.00




TYPE TOPIC OR KEYWORD AND CLICK SEARCH: