A QUALITY CONTROL ANALYSIS OF CEMENT IN DANGOTE CEMENT PLC (A CASE STUDY OF IBESE CEMENT PLANT LAGOS)


Department Of Maths And Statistics


PAGES: 60
FORMAT: MS WORD
Chapters: 1-5
PRICE: ₦ 5,000.00

A QUALITY CONTROL ANALYSIS OF CEMENT IN DANGOTE CEMENT PLC (A CASE STUDY OF IBESE CEMENT PLANT LAGOS)

TABLE OF CONTENTS

Title Page    -    -    -    -    -    -    -    -    -   

Approval Page    -    -    -    -    -    -    -    -   

Declaration    -    -    -    -    -    -    -    -   

Dedication    -    -    -    -    -    -    -    -    -   

Acknowledgement    -    -    -    -    -    -    -   

Abstract    -    -    -    -    -    -    -    -    -   

Table of Contents    -    -    -    -    -    -    -   

CHAPTER ONE – INTRODUCTION

1.1    Background of the Study    -    -    -    -    -   

1.2    Statement of the Problem    -    -    -    -   

1.3    Objectives of the Study    -    -    -    -    -    -   

1.4    Research Questions    -    -    -    -    -    -   

1.5    Research Hypothesis    -    -    -    -    -    -   

1.6    Significance of the Study    -    -    -    -    -   

1.7    Scope of the Study    -    -    -    -    -    -   

1.8    Limitations of the Study    -    -    -    -    -

1.9    Definition of Terms    -    -    -    -    -    -   

CHAPTER TWO – REVIEW OF RELATED LITERATURE

2.1    Introduction    -    -    -    -    -    -    -   

2.2    Theoretical Framework    -    -    -    -    -   

2.3    Conceptual Framework    -    -    -    -    -   

2.4    Empirical Review    -    -    -    -    -    -

CHAPTER THREE – RESEARCH METHODOLOGY

3.1    Introduction    -    -    -    -    -    -    -   

3.2    Research Design    -    -    -    -    -    -   

3.3    Population of Study    -    -    -    -    -    -   

3.4    Sample size and Sampling Techniques    -    -    -   

3.5    Method of Data Collection    -    -    -    -    -   

3.6    Research Instrument

3.7    Validity of the Instrument    -    -    -    -    -   

3.8    Reliability of the Instrument    -    -    -    -   

3.9    Sampling Method    -    -    -    -    -    -   

CHAPTER FOUR – DATA PRESENTATION AND ANALYSIS

4.1    Introduction    -    -    -    -    -    -    -   

4.2    Data Presentation and Analysis    -    -    -    -   

4.3    Testing Hypothesis    -    -    -    -    -    -   

CHAPTER FIVE – SUMMARY, CONCLUSION AND RECOMMENDATION

5.1    Summary    -    -    -    -    -    -    -    -   

5.2    Conclusion    -    -    -    -    -    -    -    -   

5.3    Recommendations    -    -    -    -    -    -   

    References -    -    -    -    -    -    -    -   

Appendix    -    -    -    -    -    -    -    -

CHAPTER ONE

INTRODUCTION

1.1.    BACKGROUND OF THE STUDY

The history of cement production in Nigeria can be traced back to 1957. From the onset, about three cement plants were commissioned by the Northern, Eastern and Mid-Western regional governments. Later, other companies such as Ashaka Cement, Benue Cement Company (BCC), West African Portland Cement Company (WAPCO) and Cement Company of Northern Nigeria (CCNN) and a host of others were established. But today, there are many cement manufacturing companies/plants in Nigeria with plants located across country. Some of the notable companies include:  West African Portland Cement Company Plc (WAPCO); Ashaka Cement Company Plc;  Benue Cement Company Plc (BCC);  Cement Company of Northern Nigeria Plc (CCNN); Dangote Industries plc;  Nigerian Cement Company Limited;  Edo Cement Company Limited; and  a host of others. One major characteristic of the cement industry in Nigeria is the problem of demand vs. supply inequality and lack of quality which specifically has led to the collapse of several buildings resulting to loss of lives and properties (Adetokun 2010). Since inception, available supply has not been able to meet the ever growing demand for cement. Even in the 1980s, during the economic recession which witnessed a decline in the demand for cement, these supply gaps were still very much evident. The modest but continuous growth in the Nigerian economy is a prospect for cement plants to increase local production. The rise in the demand of cement has led to a significance decrease in the quality of cement produced today in other to meet up with this growing demand. Recent collapse of buildings in Nigeria maybe as a result of the incompetency of the contractors but can be majorly as a result of the quality of cement and other building materials used in the construction of these buildings. The rate of collapse of buildings in Nigeria has geometrically increased overtime leading to the loss of lives and valuables.

1.2.    STATEMENT OF THE PROBLEM

The alarming rate of collapse of buildings and the lack of durable roads and bridges in Nigeria has been a major concern which has led us to basically discover the real cause behind this malady. Due to the ever increasing demand for cement in Nigeria, a lot has been said about the quality of cement in Nigeria, this is another major concern for this survey. Cement production companies need to be adequately monitored and advised on when to service their plants and the right quality level of cement production to forestall further disheartening events in Nigeria.

1.3.    OBJECTIVES OF THE STUDY

⦁    To ascertain the quality of cement produced in dangote cement plc.

⦁    To know if the recent collapse of buildings is as a result of the quality of cement and other building materials used or as a result of the incompetency of contractors.

⦁    To know if recent improvement can be made on the already existing cement quality.

⦁    To know if the cement plant is in good working condition or not.

1.4.    SIGNIFICANCE OF THE STUDY

A major significance of this study is to ascertain the causes of collapse of buildings and by extension proffer solutions to minimize its further occurrence which in turn protects the generality of Nigerians.

Another major significance of this survey is to determine the quality of cement produced by checking the working ability of cement plants with a view to advising cement production companies on the right time to service their plants to maintain a satisfactory quality level of cement produced.

1.5.    SCOPE/LIMITATION OF THE STUDY

The scope of this survey is centered on the quality control analysis of cements in the ibese cement plant Lagos state.

A major limitation to this work is the inability in gaining access to the cement production plant at the ibese plant in Lagos state.

Another limitation is getting the answers of respondents in Lagos and workers in ibese cement plant Lagos on the causes of collapse of buildings in Nigeria.

1.6.    DEFINITION OF TERMS

⦁    Cement: a grey powder made by burning clay and lime that sets hard when it is mixed with water.

⦁    Power Plant:an engine or other apparatus which provides power for a machine, building, etc.

REFERENCES

Ali, M. S., Khan, I. A. and Hossain, M. I., (2008). Chemical Analysis of Ordinary Portland Cement of Bangladesh. Chemical Engineering Research Bulletin, 12, 7-10.

Banks S. and Edward M., (2007). Keeping Control.Scantech, Australia. Available at: http//wwwScantech.com. Retrieved on: March 6, 2011.European Standard EN 197-1 2000. Cement - Part 1: Composition, specifications and conformity criteria for common cements prepared by Technical Committee CEN/TC 51.

Falah F. B. H., (2011). Chemical Analysis of Ordinary Portland Cement of Jordan. Ass. Univ. Bull. Environ. Res. 14(1), 1-9.

Faleye F. J., Ogunnubi S. and Olaofe O., (2009).Chemical and Physical Analysis of Selected cement samples in Nigerian market. Bangladesh Journal of Scientific and Industrial Research, 44(1), 41-50.

Hawkins P., Tennis P. and Detwiler R., (2003). The Use of Limestone in Portland Cement: A State-ofthe-Art Review EB227.

Portland Cement Association, Skokie, Illinois, USA. Jason Kruger, (1997). A technical report on Cement Mill Test Reports: What producers should know? A Technical Service Engineer for Holnam Inc.

Burnsville, Minn. Nasir S. and Eletr H., (1996).The Mineralogy and Chemistry of Cement and Raw materials in the United Arab Emirates.Department of Geology, Ain Shams University, Cairo, Egypt.

 Natalya G. Shanahan, 2003. Influence of C3S Content of Cement on Concrete Sulfate Durability. A thesis submitted to college of Engineering, University of South Florida.

Noor-ul-Amin and Khurshid Ali, (2010). Chemical Analysis and Comparison of Ordinary Portland Cement of Khyber PakhtoonKhwa, Pakistan. Chemical Engineering Research Bulletin, 14, 45-49.

Pandey G. and Shukla S., (1980).A Text Book of Chemical Technology.Vikas Publishing House, New Delhi, India.Vol. 1.

Tamas K. S., (2010). Study Aid 1.2- Construction/Building Materials I for Bsc (Civil and Architect Engineering).YblMiklós College of Technology, Department of Building Materials and Quality Control, Hungary.

.



TYPE IN YOUR TOPIC OR KEYWORD AND CLICK SEARCH:

HOW TO GET THE COMPLETE PROJECT MATERIAL ON A QUALITY CONTROL ANALYSIS OF CEMENT IN DANGOTE CEMENT PLC (A CASE STUDY OF IBESE CEMENT PLANT LAGOS)

  • * Click the green DOWNLOAD Button above

    * Select any option to get the complete project material instantly.

    * Chat our 24/7 customer service desk on WhatsApp# (+234) 0803-766-4978 and get your complete project material instantly.

    * All project materials on this website are well researched by professionals with high level of professionalism.


TESTIMONIES FROM OUR CLIENTS

Please feel free to carefully review some written and captured responses from our satisfied clients.


  • Debby Henry George, Massachusetts Institute of Technology (MIT), Cambridge, USA.

    "Exceptionally outstanding. Highly recommend for all who wish to have effective and excellent project defence. Easily Accessable, Affordable, Effective and effective."


  • Hilary Yusuf, United States International University Africa, Nairobi, Kenya.

    "I saw this website on facebook page and I did not even bother since I was in a hurry to complete my project. But I am totally amazed that when I visited the website and saw the topic I was looking for and I decided to give a try and now I have received it within an hour after ordering the material. Am grateful guys!"


  • Debby Henry George, Massachusetts Institute of Technology (MIT), Cambridge, USA.

    "Researchwap.net is a website I recommend to all student and researchers within and outside the country. The web owners are doing great job and I appreciate them for that. Once again, thank you very much "researchwap.net" and God bless you and your business! ."


  • Lamilare Valentine, Kwame Nkrumah University, Kumasi, Ghana.

    "Great User Experience, Nice flows and Superb functionalities.The app is indeed a great tech innovation for greasing the wheels of final year, research and other pedagogical related project works. A trial would definitely convince you."


  • Sampson, University of Nigeria, Nsukka.

    "I love what you guys are doing, your material guided me well through my research. Thank you for helping me achieve academic success."


  • Cynthia, Akwa Ibom State University .

    "researchwap.com is God-sent! I got good grades in my seminar and project with the help of your service, thank you soooooo much."


  • Elizabeth, Obafemi Awolowo University

    "Sorry, it was in my spam folder all along, I should have looked it up properly first. Please keep up the good work, your team is quite commited. Am grateful...I will certainly refer my friends too."


  • Ali Olanrewaju, Lagos State University.

    "Am happy the defense went well, thanks to your articles. I may not be able to express how grateful I am for all your assistance, but on my honour, I owe you guys a good number of referrals. Thank you once again."


  • Willie Ekereobong, University of Port Harcourt.

    "My Dear Researchwap, initially I never believed one can actually do honest business transactions with Nigerians online until i stumbled into your website. You have broken a new legacy of record as far as am concerned. Keep up the good work!"


  • Theressa, Igbinedion University.

    "WOW, SO IT'S TRUE??!! I can't believe I got this quality work for just 5k...I thought it was scam ooo. I wouldn't mind if it goes for over 5k, its worth it. Thank you!"


  • Joseph, Abia state Polytechnic.

    "I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much researchwap.com, infact, I owe my graduating well today to you guys...."


  • Christiana, Landmark University .

    "My friend told me about ResearchWap website, I doubted her until I saw her receive her full project in less than 15 miniutes, I tried mine too and got it same, right now, am telling everyone in my school about researchwap.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work"


  • Musa, Federal University of Technology Minna

    "I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!."


  • Ali Obafemi, Ibrahim Badamasi Babangida University, Niger State.

    "I was scared at first when I saw your website but I decided to risk my last 5k and surprisingly I got my complete project in my email box instantly. This is so nice!!!."


  • To contribute to our success story, send us a feedback or please kindly call 2348037664978.
    Then your comment and contact will be published here also with your consent.
    Thank you for choosing researchwap.com.

FREQUENTLY ASKED QUESTIONS

  • How can I get the complete project - A QUALITY CONTROL ANALYSIS OF CEMENT IN DANGOTE CEMENT PLC (A CASE STUDY OF IBESE CEMENT PLANT LAGOS)

    Simply click on the DOWNLOAD green button above and follow the procedure stated.


    Is it a complete project work or just materials?

    Yes, it's a Complete Research Project material. i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data


    What if I want to change the case study for A QUALITY CONTROL ANALYSIS OF CEMENT IN DANGOTE CEMENT PLC (A CASE STUDY OF IBESE CEMENT PLANT LAGOS), What can i do?

    Chat with Our 24/7 Customer Service Desk Now: WhatsApp# and you will be responded to Instantly


    How long does it take to get the complete project on A QUALITY CONTROL ANALYSIS OF CEMENT IN DANGOTE CEMENT PLC (A CASE STUDY OF IBESE CEMENT PLANT LAGOS)?

    Depending on how fast your payment and details is acknowledged by us, you will get the complete project within 30 minutes. However, on a very good day you can still get it within 15 minutes!


    How will I get my complete project?

    The Complete Project Material will be Delivered via your Email Address in an MS Word document format


    Can I get my Complete Project through WhatsApp?

    Yes! We also send your Complete Research Project to your WhatsApp Number


    What if my Project Supervisor made some changes to a topic i picked from your website?

    Call or Chat With Our 24/7 Custumer Care Desk: +2348037664978 and you will be responded to Instantly


    Do you assist students with Assignment, Term Paper, Seminar and Project Proposal?

    Call or Chat With Our 24/7 Custumer Care Desk: +2348037664978 and you will be responded to Instantly


    What if i do not have any project topic idea yet?

    Don't Worry! We've Got Your Covered. Chat with us on WhatsApp# (+234) 0803-766-4978 to Get Instant Help.


    Why should I trust this website?

    We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "TOPNOTCH INFOTECH ENTERPRISE". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!


    I have a fresh topic that is not on your site. How do I go about it?

    Don't Worry, Chat with us on WhatsApp# (+234) 0803-766-4978 to Get Instant Help.



PROJECT DETAILS

PAGES: 60
FORMAT: MS WORD
Chapters: 1-5
PRICE: ₦ 5,000.00




TYPE TOPIC OR KEYWORD AND CLICK SEARCH: