CONSTRUCTION OF DIGITAL WATER LEVEL CONTROLLER


CONSTRUCTION OF DIGITAL WATER LEVEL CONTROLLER

ABSTRACT

Technological advancement has cut across all aspects of human activities. However, it is on this platform that the need to minimize or check water wastage arises. Water is a free gift of nature but due to its indispensability to human existence; it should be conserved for the purpose of constant availability or sufficiency. Moreover, in order to take good care of this problem of wastage, there is a need for the construction of a water level controller this will guide against unnecessary wastage of water, for it will make a reasonable quantity of water to be used any time. In this project, the effort has been made to construct a water controller that is capable of controlling the electric water pumping motor operation in regard o switching “ON” or “OFF” at a predetermined level of water in the storage tanks or reservoirs. This project also gives the clarity of advantage of using an automatic method of controlling water level over human or manual control method.

TABLE OF CONTENT

Title page                                                                                                        Certification                                                                                                    Dedication                                                                                                      Acknowledgement                                                                                          Abstract                                                                                                          Table of content                                                                                              i

CHAPTER ONE 1.0       Introduction                                                                                        1.1       Motivation                                                                                             1.2       Layout of reports                                                                               

CHAPTER TWO 2.0       Literature review                                                                                 2.1       Digital concept, logic gate symbol and truth table                             2.2       The complementary metal oxide silicon   integrated circuits (CMOSIC)                                                           

Resistor, capacitor, and transistors                                                Relay                                                                                         

CHAPTER THREE 3.0       Units design calculation                                                                      3.1       The power supply unit                                                                        3.2       The rectifier stage                                                                               3.3       Power supply regulation and sensing/control unit                              3.4       Switching circuit design calculation                                                   3.5       Mode of operation                                                                             

CHAPTER FOUR 4.0       Performance text and analysis                                                            4.1       Casing and its diagram                                                                       4.2       Block diagram                                                                                    

CHAPTER FIVE 5.0       Conclusion and recommendation                                                       5.1       Bill of engineering measurements and evaluation (BEME)                5.2       References                                                                                         

CHAPTER ONE

1.0       INTRODUCTION Water is one of the most important natural resources that need to be conserved, but the rate at which water is being wasted in both domestic and industrial activities is quite learning, however, in a bid to reduce this kind of wastage in some industries, the effort has been made towards the design of a “recirculation system” in which water that has been used is made to recycle and be used again for the production processes. In some homes is the make use of the overhead reservoirs, there s the need to make use of electric motors for the purpose of pumping water by the electric motor into these reservoirs stop usually depends on the capacity of the reservoirs (that is the time at which water fills the reservoirs to the brim) this, however, usually brings about “forced leakages” through the month of the overhead tanks or reservoirs and hence, the whole environment or surroundings will become flooded with waters. This is, of course, an abnormal condition. Moreover, for this reason, and others that will be mentioned later, there arises the need to develop an efficient and effective means of controlling the level at which water will be pumped in the reservoirs in house and industries in order to reduce wastage of water, loading at the environments and host of other. This a water level controller that will be a supervisory system for monitoring the level of water, which a particular reservoir can contain, needs to be designed and constructed, such that when the water reaches the level at which the probe detectors of the controller are set in the tanks, the motor automatically stopped and alarm to indicate that the volume of the water pumped is enough has to be incorporated.

1.1       MOTIVATION Of all the existing methods of water conservation ranging from private manual control to the use of “float” to control the pumping action of the electric motors, there has not been a completely electronic method of control. In the manual control, bring compelled to climb up to a reservoir in which water is being pumped by an electric motor, in order to determine the level of the required water and for which the motor should be stopped, be not the best way of using qualified manpower. Besides, this offers a very tedious working condition to the working personnel’s on the whole. However; an improper way of controlling the water level in the overhead tanks or reservoirs is contributing to the problem of water wastage and environmental flooding which can lead to inconvenience for the people around, damage of the property, and other valuable materials in homes and industries.        Hence, the real motivation in having this supervisory unit equipment is based on its advantages of the ability to detect the presence of water at a predetermined level and then control of the pumping operation is basically completed electronic mode, the advantage which reduces the problems associated with age which reduces the problems associated with improper way of water level centered. 

1.2       LAYOUT OF REPORT The report layout all the procedures involved in the project from chapter one to chapter five.

Chapter one discusses the introduction, which covers the motivation. Chapter two deals with the literature review and the general knowledge of the entire system. Chapter three is on the system design, calculation, and mode of operation. Chapter four describes the construction testing and problems encountered as well as the courses of the project.

Chapter five presents the conclusion and the recommendation.  

 

.


TYPE IN YOUR TOPIC AND CLICK SEARCH.






RESEARCHWAP.COM

Researchwap.com is an online repository for free project topics and research materials, articles and custom writing of research works. We’re an online resource centre that provides a vast database for students to access numerous research project topics and materials. Researchwap.com guides and assist Postgraduate, Undergraduate and Final Year Students with well researched and quality project topics, topic ideas, research guides and project materials. We’re reliable and trustworthy, and we really understand what is called “time factor”, that is why we’ve simplified the process so that students can get their research projects ready on time. Our platform provides more educational services, such as hiring a writer, research analysis, and software for computer science research and we also seriously adhere to a timely delivery.

TESTIMONIES FROM OUR CLIENTS


Please feel free to carefully review some written and captured responses from our satisfied clients.

  • "Exceptionally outstanding. Highly recommend for all who wish to have effective and excellent project defence. Easily Accessable, Affordable, Effective and effective."

    Debby Henry George, Massachusetts Institute of Technology (MIT), Cambridge, USA.
  • "I saw this website on facebook page and I did not even bother since I was in a hurry to complete my project. But I am totally amazed that when I visited the website and saw the topic I was looking for and I decided to give a try and now I have received it within an hour after ordering the material. Am grateful guys!"

    Hilary Yusuf, United States International University Africa, Nairobi, Kenya.
  • "Researchwap.com is a website I recommend to all student and researchers within and outside the country. The web owners are doing great job and I appreciate them for that. Once again, thank you very much "researchwap.com" and God bless you and your business! ."

    Debby Henry George, Massachusetts Institute of Technology (MIT), Cambridge, USA.
  • "I love what you guys are doing, your material guided me well through my research. Thank you for helping me achieve academic success."

    Sampson, University of Nigeria, Nsukka.
  • "researchwap.com is God-sent! I got good grades in my seminar and project with the help of your service, thank you soooooo much."

    Cynthia, Akwa Ibom State University .
  • "Great User Experience, Nice flows and Superb functionalities.The app is indeed a great tech innovation for greasing the wheels of final year, research and other pedagogical related project works. A trial would definitely convince you."

    Lamilare Valentine, Kwame Nkrumah University, Kumasi, Ghana.
  • "Sorry, it was in my spam folder all along, I should have looked it up properly first. Please keep up the good work, your team is quite commited. Am grateful...I will certainly refer my friends too."

    Elizabeth, Obafemi Awolowo University
  • "Am happy the defense went well, thanks to your articles. I may not be able to express how grateful I am for all your assistance, but on my honour, I owe you guys a good number of referrals. Thank you once again."

    Ali Olanrewaju, Lagos State University.
  • "My Dear Researchwap, initially I never believed one can actually do honest business transactions with Nigerians online until i stumbled into your website. You have broken a new legacy of record as far as am concerned. Keep up the good work!"

    Willie Ekereobong, University of Port Harcourt.
  • "WOW, SO IT'S TRUE??!! I can't believe I got this quality work for just 3k...I thought it was scam ooo. I wouldn't mind if it goes for over 5k, its worth it. Thank you!"

    Theressa, Igbinedion University.
  • "I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much researchwap.com, infact, I owe my graduating well today to you guys...."

    Joseph, Abia state Polytechnic.
  • "My friend told me about ResearchWap website, I doubted her until I saw her receive her full project in less than 15 miniutes, I tried mine too and got it same, right now, am telling everyone in my school about researchwap.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work"

    Christiana, Landmark University .
  • "I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!."

    Musa, Federal University of Technology Minna
  • "I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!."

    Ali Obafemi, Ibrahim Badamasi Babangida University, Niger State.
  • To contribute to our success story, send us a feedback or please kindly call 2348037664978.
    Then your comment and contact will be published here also with your consent.

    Thank you for choosing researchwap.com.