                                                                      ABSTRACT:   

The paper critically analyses causes of construction project failures and abandonments in Nigeria.The unceasing abandonment and failure of development projects is so shocking in the developing countries such that Nigerian has remained one of the countries in such difficulty. The major objectives of the paper are: To examine the causes of construction project failure and abandonments in Nigeria, To examine the effect of construction project failure and abandonments in Nigeria and To determine the solution to the problem of construction project failure and abandonments in Nigeria.

Concerning methodology, both secondary and primary sources of data was used for the study. A survey research design was used with a sample size of 50 from the population. Data was analyzed using chi-square statistical tool. Key findings from the study showed that with a significance level of 0.05, there is a significant effect of construction project failure and abandonment on the socio economic development of Nigeria. Construction project failure and abandonment does not encourage foreign investments.

Recommendations for the study include; The general public and the experts should be educated the construction projects industry on the causes of construction project failure and abandonments in Nigeria, this will go a long way to proffer solution to the problem.

Before the execution of community development projects, the financial analysis should be considered to reduce the chance of abandoning the project half way.

TABLE OF CONTENTS

Title Page    -    -    -    -    -    -    -    -    -    i

Approval Page    -    -    -    -    -    -    -    -    ii

Declaration    -    -    -    -    -    -    -    -    iii

Dedication    -    -    -    -    -    -    -    -    -    iv

Acknowledgement    -    -    -    -    -    -    -    v

Abstract    -    -    -    -    -    -    -    -    -    vi

Table of Contents    -    -    -    -    -    -    -    vii

CHAPTER ONE – INTRODUCTION

1.1    Background of the Study    -    -    -    -    -   

1.2    Statement of General Problem    -    -    -    -   

1.3    Objective of the Study    -    -    -    -    -    -   

1.4    Research Questions    -    -    -    -    -    -   

1.5    Hypothesis   -      -      -      -      -      -      -        -        -        

1.6    Significance of the Study    -    -    -    -    -   

1.7    Scope of the Study    -    -    -    -    -    -   

1.8    Definition of Terms    -    -    -    -    -    -   

CHAPTER TWO – REVIEW OF RELATED LITERATURE

2.1    Introduction    -    -    -    -    -    -    -    -    -

2.2    Concept of Construction Project Abandonment-    -    -    -

2.3    EFFECTS OF CONSTRUCTION PROJECT ABANDONMENT -    -    -    -    --    -    -    -

2.3.1 Effect on Individuals-    -    -    -    -    -    -    -   

2.3.2. Effect on the community-    -    -    -    -    -    -   

2.3.3    Effect on government-    -    -    -    -    -    -    -

2.4 WAYS TO FORESTALL CONSTRUCTION PROJECT ABANDONMENT-    -    -    -    -    -    -    -    -        -

2.5    CONCEPT OF CONSTRUCTION PROJECTS MAINTENANCE AND MANAGEMENT-    -    -    -    -    -    -    -   

2.6    EMPIRICAL REVIEW-    -    -    -    -    -    -    -   

CHAPTER THREE – RESEARCH METHODOLOGY

3.1    Introduction    -    -    -    -    -    -    -    -    -

3.2    Research Design    -    -    -    -    -    -    -    -

3.3    Area of the Study    -    -    -    -    -    -    -    -

3.4    Population of Study    -    -    -    -    -    -    -    -

3.5    Sample size and Sampling Techniques    -    -    -    -    -

3.6    Instrument for Data Collection    -    -    -    -    -    -

3.7    Validity of the Instrument    -    -    -    -    -    -    -

3.8    Reliability of the Instrument    -    -    -    -    -    -

3.9    Method of Data Collection    -    -    -    -    -    -    -

3.10    Method of Data Analysis    -    -    -    -    -    -    -

CHAPTER FOUR – DATA PRESENTATION AND ANALYSIS

4.0    Introduction    -    -    -    -    -    -    -    -    -

4.1    Data Presentation and Analysis    -    -    -    -    -    -

4.2    Characteristics of the Respondents    -    -    -    -    -

4.3    Data Analysis    -    -    -    -    -    -    -    -    -

4.4    Testing Hypothesis    -    -    -    -    -    -    -    -

4.5    Summary of Findings    -    -    -    -    -    -    -    -

4.6    Discussion of Findings    -    -    -    -    -    -    -

CHAPTER FIVE – SUMMARY, CONCLUSION AND RECOMMENDATION

5.0    Introduction    -    -    -    -    -    -    -    -    -

5.1    Summary    -    -    -    -    -    -    -    -    -    -

5.2    Conclusion    -    -    -    -    -    -    -    -    -    -

5.3    Recommendations    -    -    -    -    -    -    -    -

    References -    -    -    -    -    -    -    -    -    -

Appendix    -    -    -    -    -    -    -    -    -    -

CHAPTER ONE:  

INTRODUCTION;    

1.1    BACKGROUND TO THE STUDY -  

Abandoned projects and construction failure including construction projects and other civil engineering infrastructure development project like houses, churches, schools, roads, bridges, dams, tunnels, air port, sea port etc. litter the whole Nigeria. Osemenan (1987) reported that Nigeria has become the “world’s junk-yard of abandoned and failed projects worth billions of naira and it is greatly unthinkable that Nigeria blessed with so great potentials in the construction projects and construction industry can experience such magnitude of project failure and abandonment. According to another report by Kotangora (1993) there are about 4000 uncompleted or abandoned project belonging to the Federal Government of Nigeria with an estimated cost of above N 300 billion which will take 30 years to complete at the present execution capacity of government, also according to him this issue of abandonment and construction project failure is been left without adequate attention for too long which is now having a multiplier effect on the construction industry in particular and the national economy as a whole.The construction projects and construction industry plays a very dominant role in the economy of any nation. A healthy economy usually experience an increase in construction projects and construction activities, but in a depressed economy, the incidence of project abandonment and construction failures tends to be more prevalent.Akindoyeni (1989) qualitatively reasoned that some of the causes of project abandonment and construction failure in Nigeria are deaths of client, inability of client to attract fund and lack of good planning.

The abandonment of development projects is the act of discontinuing any activities or maintenance works on suchdevelopment project within a time frame of the contract agreement and with no intention of returning back to thedevelopment (Spelman, 1993). Similarly, O’Flaherty (1993) while reflecting on property development projects suggest thatit is when an owner or developer is ceasing to provide the required maintenance management to a developed property. There could also be construction failure due to improper planning.

However, real property development projects being a capital intensive undertaking should be critically analyzed toascertain its feasibility and viability before embarking on it. But, on several occasions and as it had been observed,governments, contractors and agencies have abandoned development projects mid-way into construction and completion.

The causes and effects of these development projects abandonments and construction failure are not just peculiar to a particular reasonrather cut across several reasons (Ayodele and Alabi, 2011), and as well as creating a total dwindling effects on the valuesof developed properties located close and within the vicinity. The expected prominence of any earmarked developmentprojects is to be completed, while at the same time, adding values to the built environment aesthetics. Although,development projects are temporary endeavors undertaken to create a unique product and services with a defined beginningand ending date (Gardner, 2005). The accomplishment of such purposes should be realized at all times otherwise needlessof such development (Gardner, 2005). The development projects specific in the study framework is infrastructural projects(such as; house, electricity, road, schools, and drainage). However, the study purpose is to investigate and assess the causes and effects of development projectsabandonment  and construction failure in Nigeria.

1.2    STATEMENT OF THE PROBLEM

The unceasing abandonment and failure of development projects is so shocking in the developing countries such thatNigerian has remained one of the countries in such difficulty (Ayodele and Alabi, 2011; Kotangora, 1993; Osemenan,1987). Therefore, the significance that the incessant abandonment of projects and construction failure would bring several effects on the aesthetics of the environment, real propertiesand its values and the economy cannot be overemphasized since some of the development projects provide the basicservices that should meet the needs of the people. However, this study will examine the causes of construction project failure and abandonments in Nigeria.

1.3    OBJECTIVES OF THE STUDY

The following are the objectives of this study:

1.    To examine the causes of construction project failure and abandonments in Nigeria.

2.    To examine the effect of construction project failure and abandonments in Nigeria.

3.    To determine the solution to the problem of construction project failure and abandonments in Nigeria.

1.4    RESEARCH QUESTIONS

1.    What are the causes of construction project failure and abandonments in Nigeria?

2.    What is the effect of construction project failure and abandonments in Nigeria?

3.    What is the solution to the problem of construction project failure and abandonments in Nigeria?

1.6    SIGNIFICANCE OF THE STUDY

The following are the significance of this study:

1.    This study will educate the general public and the experts in the construction projects industry on the causes of construction project failure and abandonments in Nigeria with a view of proffering solution to the problem.

2.    This research will also serve as a resource base to other scholars and researchers interested in carrying out further research in this field subsequently, if applied will go to an extent to provide new explanation to the topic.

1.7    SCOPE/LIMITATIONS OF THE STUDY

This study on causes of construction project failure and abandonments in Nigeria will cover the issues of abandoned projects, failed project and all other abandoned infrastructural facilities.

LIMITATION OF STUDY

Financial constraint- Insufficient fund tends to impede the efficiency of the researcher in sourcing for the relevant materials, literature or information and in the process of data collection (internet, questionnaire and interview).

Time constraint- The researcher will simultaneously engage in this study with other academic work. This consequently will cut down on the time devoted for the research work.

.



TYPE IN YOUR TOPIC OR KEYWORD AND CLICK SEARCH:

HOW TO GET YOUR COMPLETE PROJECT MATERIAL INSTANTLY

  • * Select 3 free project topics of your choice from your Department

    * Submit the 3 project topics to your Supervisor for his or her Approval

    * Call our 24/7 customer service desk or WhatsApp Chat# (+234) 0803-766-4978 and get your project topics and complete material instantly.

    * You can also send an Email to [email protected]

    * All project materials on this website are well researched by professionals with high level of professionalism.


TESTIMONIES FROM OUR CLIENTS

Please feel free to carefully review some written and captured responses from our satisfied clients.


  • Debby Henry George, Massachusetts Institute of Technology (MIT), Cambridge, USA.

    "Exceptionally outstanding. Highly recommend for all who wish to have effective and excellent project defence. Easily Accessable, Affordable, Effective and effective."

  • Hilary Yusuf, United States International University Africa, Nairobi, Kenya.

    "I saw this website on facebook page and I did not even bother since I was in a hurry to complete my project. But I am totally amazed that when I visited the website and saw the topic I was looking for and I decided to give a try and now I have received it within an hour after ordering the material. Am grateful guys!"

  • Debby Henry George, Massachusetts Institute of Technology (MIT), Cambridge, USA.

    "Researchwap.net is a website I recommend to all student and researchers within and outside the country. The web owners are doing great job and I appreciate them for that. Once again, thank you very much "researchwap.net" and God bless you and your business! ."

  • Lamilare Valentine, Kwame Nkrumah University, Kumasi, Ghana.

    "Great User Experience, Nice flows and Superb functionalities.The app is indeed a great tech innovation for greasing the wheels of final year, research and other pedagogical related project works. A trial would definitely convince you."

  • Sampson, University of Nigeria, Nsukka.

    "I love what you guys are doing, your material guided me well through my research. Thank you for helping me achieve academic success."

  • Cynthia, Akwa Ibom State University .

    "researchwap.com is God-sent! I got good grades in my seminar and project with the help of your service, thank you soooooo much."

  • Elizabeth, Obafemi Awolowo University

    "Sorry, it was in my spam folder all along, I should have looked it up properly first. Please keep up the good work, your team is quite commited. Am grateful...I will certainly refer my friends too."

  • Ali Olanrewaju, Lagos State University.

    "Am happy the defense went well, thanks to your articles. I may not be able to express how grateful I am for all your assistance, but on my honour, I owe you guys a good number of referrals. Thank you once again."

  • Willie Ekereobong, University of Port Harcourt.

    "My Dear Researchwap, initially I never believed one can actually do honest business transactions with Nigerians online until i stumbled into your website. You have broken a new legacy of record as far as am concerned. Keep up the good work!"

  • Theressa, Igbinedion University.

    "WOW, SO IT'S TRUE??!! I can't believe I got this quality work for just 5k...I thought it was scam ooo. I wouldn't mind if it goes for over 5k, its worth it. Thank you!"

  • Joseph, Abia state Polytechnic.

    "I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much researchwap.com, infact, I owe my graduating well today to you guys...."

  • Christiana, Landmark University .
    Christiana, Landmark University .

    "My friend told me about ResearchWap website, I doubted her until I saw her receive her full project in less than 15 miniutes, I tried mine too and got it same, right now, am telling everyone in my school about researchwap.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work"

  • Musa, Federal University of Technology Minna

    "I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!."

  • Ali Obafemi, Ibrahim Badamasi Babangida University, Niger State.

    "I was scared at first when I saw your website but I decided to risk my last 5k and surprisingly I got my complete project in my email box instantly. This is so nice!!!."


  • To contribute to our success story, send us a feedback or please kindly call 2348037664978.
    Then your comment and contact will be published here also with your consent.
    Thank you for choosing researchwap.com.

FREQUENTLY ASKED QUESTIONS

  • 1. How can I get the complete project if I order?

    AFTER FOLLOWING THE PAYMENT PROCEDURES HERE, AND WE RECEIVE YOUR DETAILS AS SMS ON 08037664978 or as mail to [email protected], THE MATERIAL WILL BE ATTACHED AND MAILED TO YOUR EMAIL ADDRESS WITHIN 30 MINUTES, AND A NOTIFICATION OF THE DELIVERY WILL BE SENT TO YOUR PHONE NUMBER.

    2. How will my payment be confirmed?

    FOLLOW THE PAYMENT INSTRUCTIONS FOUND ON THE PAYMENTS PAGE. NOTE: Payment information is required for Payment Confirmation.

    3. One of your topics suites my project, but the case study is different. What step should I take?

    Students are always advised to use our materials as guide. However, if you have a different case study, you may need to consult researchwap.com Depending on similarity of the organization/industry (case study) you may modify to, if you wish.

    4. How long does it take to get the complete project?

    Depending on how fast your payment and details is acknowledged by us, you will get the complete project within 30 minutes. However, on a very good day you can still get it within 15 minutes!

    5. Why should I trust this website?

    We are well aware of fraudulent activities (scam) that have been happening on the internet. It is unfortunate, but hopefully declining. However, we wish to re-assure our esteemed clients that we are genuine and our services is authentic, if not, we would not post our account details, email address, phone number or any personal details that could be traceable. Free chapter 1 is always given on the site to prove to you that we got the material. If you are unable to view the free chapter 1 send an email or SMS containing your name, topic, with the subject head "FREE CHAPTER 1" to [email protected] or 08037664978 plus the topic. You will get the free chapter 1 within an hour.

    6. Do you accept ATM payments and Online Transfers?

    Yes. We accept ATM transfers and online payments. FOLLOW THE PAYMENT INSTRUCTIONS FOUND ON THE PAYMENTS PAGE.

    7. Is it a complete research project or just materials?

    Yes it is a complete research project. We send complete project materials (i.e. chapters 1-5, full references, and questionnaires/secondary data to your email address after payment confirmation.

    8. How can I pay Online with my ATM card?

    1. Visit an ATM

    2. Insert your card

    3. Select Quickteller

    4. Select "Pay bills"

    5. Choose your account type

    6. Select "Others"

    7. Enter 322222 as the payment code

    8. Enter your phone number as "Customer Reference"

    9. Accept the N1.00 amount displayed

    10. Follow prompts to complete the transaction

    9. How will I receive a software?

    A link to download the software will always be on the first page of the material.

    10. I have a fresh topic that is not on your site. How do I go about it?

    We have professional writers in management sciences, computer science and social sciences. If you have a fresh topic, just click this hire a writer link, fill the form, submit the details and one of our writers will contact you shortly.


PROJECT DETAILS

PAGES: 56
FORMAT: MS WORD
Chapters: 1-5
PRICE: ₦ 5,000.00




TYPE TOPIC OR KEYWORD AND CLICK SEARCH: