This research project will be based on the impact of materials handling equipment on store activities a case study of Doyin investment limited Ilorin. Handling equipment is device for effecting inventory movement within and outside the store. The research work will consist of five chapters. Chapter one will discuss the introduction historical background of the study, statement of the general problem the objective of the study, the significance of the study, research, scope of the study, limitation of the study, hypothesis formulation, definition of the terms. Chapter two contain the literature review, chapter three will focus in research methodology, research design, source of data, research instrument used, research instrument used, research population and sample size sampling procedure employed and method of data analysis. Chapter four will be data presentation, analysis and test of hypothesis. While chapter five will detail out the summary of finding, conclusions, recommendations, references and appendix.             

TABLE OF CONTENT

Certification i

Dedication ii

Acknowledgement iii

Proposal v

Table of content vi

CHAPTER ONE

1.0 Introduction 1

1.1Historical Background of the Study2

1.2 Statement Of The  General Problem 7

1.3The objective of the study8

1.4 Significance of the study 9 

1.5 The scope of the study 9

1.6 Limitation of the study 9

1.9 Definition Of Terms 11

CHAPTER TWO

2.0 Literature Review 13

2.1 Various types of materials suitable for stockyard storage 22

2.2 Materials handling system 23

2.3 Types of equipment 30

CHAPTER THREE

3.0 Methodology 36

3.1 Research Approaches 36

3.2 Sources of Data 36

3.3 Research Instruments used 37

3.4  Questionnaire 38 

3.5 Research population and sample size 38

3.6 Sampling procedure employed 38

3.7 Method of data Analysis 39

CHAPTER FOUR

4.0 Data Presentation and Analysis 40

4.1 Test of Hypothesis 57

CHAPTER FIVE

5.0 Summary of Findings 59

5.1 Conclusion 61

5.2 Recommendations 62

References 66

Appendix 68

 CHAPTER ONE

1.0 INTRODUCTION

Most organizations whether in manufacturing service or extractive field of operating make use of materials handling equipments in their daily operations.

Handling of materials, which is the main activity in store house and stockyards are costly operations and therefore, the methods and equipments employed in handling should be efficient

As in many other aspects of store function, the approaches depend on the nature of the business, the kind of stock carried and the size of the accommodation.

In a large stores house responsible for a wide range of a goods with weekly output measured in hundred of tons it will b e necessary to provide some manual handling equipment and mechanical handling for moving the heavy materials. In this case, it’s not unusual to find overhead cranes, fork lift trucks and conveyor all in operations. With mobile and crane and dumpers in the stockyards.

The impacts of materials handling equipments on the store function of an organization cannot be over emphasize for effective service, organization should be able to transport materials, equipments, spares from one point to another as effectively as possible.

As a result material handling equipments, only few workers are needed for its operation and this tends to save the company huge amount of money, time and reduction in work of the labour. The position of materials handling remains a subject of concern to most business organization.

It’s on this vital issue that research work will focus by examining the role o purchasing and store departments. In regard to material handling operation manufacturing organization. Although, these functions spend a significant Portion of organization income.

1.1 HISTORICAL BACKGROUND DOYIN INVESTMENT COMPANY

Doyin investment Nigeria Limited was sited along Asa Dam Road Kwara State. The company specialized in product of Flash. Hi-Cleans, Vogues, Dento Clean and Wash rite.

The company was incorporated in October 1984 by the Federal Government of Nigeria under the Commerce and Industry Act 1985 all the installation started immediately.

The Head Office is at Lagos State. Doyin is from Kwara State. He decided to site the industries in the state capital for the purpose of reducing the problem of unemployment within and outside the state.

The materials used in production are imported materials but now some materials are being produced locally. Some of the materials were specially made for Doyin investment Nigeria Limited from oversea e.g. Blank Corp. Sodium Syndicate etc.

The organizational chart showing department and staff position. The General Manager is the Head of the industry.

The sole responsibilities of the whole operations rest on him. He is the only person that gives order on any important issues. When there is a need to Purchase capital equipment or purchase large quality of raw materials involving millions naira.

After the General Manager are the Technical Manager, Production Manager and Quality Control Manager.

The technical manager wherever there is any needs to purchase costly equipment. The Product Manager has under him the raw materials store, central stores and warehouses where they keeps the finished products.

The raw materials that always kept in the store for production include:

i. Flash Cartons for packing the detergent.

ii. Inner case in which the soap and the detergent itself are being packed.

iii. Polly products (Wash Right Bags) are used to pack the detergent that was no in cartons. It is weighted in kilograms (500kg).

2. The components at the raw materials store:

i. STPP (Sodio Tripolifapato)

ii. Sodium Syndicate

iii. Glue

iv. Blank Corp

v. Blue Due

vi. perfume 

vii. Caustic Soda

viii. Sulphuric Acid.

All the raw materials are kept for production process in the raw materials store until they come to request for them from the production shop floor. The STPP (Sodium Triphotasopato) is in separate tank with the provision of taps so that as they are being dissolved by water, some are passes to the next machine where the operation starts.

The sodium syndicate is used to neutralize the acid of the detergent during the production. Glue, Blank Corp and Caustic Soda are also parts of the raw materials used for production for the detergent and during this period it is in white colour. The blue due will be supplied so that it will change the white colour to blue colour, It depends on the colour of the detergent they want to produce, perfume is then supplied at the final stage, so that the detergent will give passive smell, this will normally be on the cloth. The quality control manager in collaboration with design and engineering department work on how much chemical should be used, the design packing and packages, what types of colour will attract the customer, the dimension for the cartons hardness so it does not just get spoiled anyhow. The amount of raw materials to be used in forecast by the quality control department. At it’s always happening in cost -organization the store department will supply all document connected with the purchase of raw material arid stationeries to the account department so that tie necessary funds is given to them to buy from outside organization. The entire document are not given to the account department only to issue money for purchasing the materials alone, but the account department use it for the organization annual budget.

In every department there is a supervisor monitoring the affairs of the clerks and other cleaners, so that the information will be flowing upward from the cleaner to supervisor and to different heads of department.

Most of the decision taken in the organization is such the decision flow down warding.

1.2 STATEMENT OF THE GENERAL PROBLEMS

Most organizations in this country do not know the impact of the materials handling equipments on store function in most cases many organization encounter problem in the application of and operation of handling equipment.

Materials handling equipments cost a lot of money, the less handling equipments involved in the stores operations, the better it is in terms of cost reduction and consequently better profit.

In facts, the use of materials handling equipments saves the money and time and make work to be effectively and efficiently done.

 The financial commitment in procuring materials handling equipment as well as its introduction is a problems for most firms instances, operational problems is another obstacle that is normally encountered in the application of materials handling equipment an organization since there is the need for trained manpower to handle the machines, driven machine in the organization  

Introduction to materials handling equipment in the store house requires a careful study of the existing store house. It was observe that most store houses need to be modified before particular handling equipment can be introduced

1 3 THE OBJECTIVES OF THE STUDY

1. The primary objective for the research work is satisfy one of the pre-requisite for the award of Higher National Diploma (HND) Certificate in Purchasing and Supply awarded by Department of Purchasing and Supply, Institute Finance and Management Studies. Kwara State Polytechnic, Ilorin.

2. To determine the extent to which effective materials handling equipments can lead to the attainment of organization objectives.

1.4 SIGNIFICANCE OF THE STUDY

It is hoped that Doyin Investment company Limited Ilorin Kwara State being that entity on which the study is centered upon will certainly find this projects more beneficial in the sense that, it would expose the company’s lapses and possible ways of rectifying the lapses.

This study is significant because it will serve as a reference source for future researcher writing on similar topic.

The research study will broaden the knowledge out for the researcher in the subject molted 

1.6 THE SCOPE OF THE STUDY

This study will cover only the impact of materials handling equipment on the store function of an organization.

The research work will be limited in scope to Doyin investment company Ilorin. 

1.7 LIMITATIONS OF THE STUDY

The successful conduct of this research work has not by any means been an easy task. The researcher faced a lot, of problems which almost threaten the success of the study.

Firstly in view limited time for the submission of this research work, the researcher was forced to restore the scope of the study to doyin investment company limited ilorin.   

Also, lack of enough and adequate financial resources made it quite impossible for the researcher to visit all the similar companies spread across the country.

 Another problem faced by the researcher was the lack of access to required facts and figures relating to the subject matter the company’s official in charge of such facts and figures this did not allow the researcher access to them.

HYPOTHESIS FORMULATION

Hypothesis is a tentative answer to research questions. It is often stated in form of relationship between a dependent and independent variables.

The following hypothesis will be employed in this research work.

H0: Null hypothesis, materials handling equipment has no impact on store function of an organization.

H1: Alternative hypothesis, materials handling equipment has positive impacts on the store function of an organization.

1.9 DEFINITION OF TERMS

(1) RESEARCH: The act of investigation to obtain fact about something from varieties of sources. 

(2) RESEARCHER: The individual who undertake to carry-out investigation to discover facts about something from many sources. 4

(3) STOCK: This is an item that are held in the store house,

4) STORE HOUSE: This is a place where goods are kept for immediate and future consumption.

(5 OVERHEAD CRANES: It is used to load and unload heavy object from loading vehicle and railway wagon.

(6) MATERIALS HANDLING: These are the equipments employed in moving material (moving) from one place to another.

(7) MANUAL HANDUNG: This is a natural ways of handling items which are not too heavy. This is the use of hands without any equipment.

(8) RACK: This is the name given to any kind of storage fixtures that cannot be grouped as schedule or bin.

.



TYPE IN YOUR TOPIC OR KEYWORD AND CLICK SEARCH:

HOW TO GET THE COMPLETE PROJECT MATERIAL ON THE IMPACT OF MATERIAL HANDLING EQUIPMENT ON STORE ACTIVITIES (A CASE STUDY OF DOYIN INVESTMENT LIMITED COMPANY)

  • * Click the green DOWNLOAD Button above

    * Select any option to get the complete project material instantly.

    * Chat our 24/7 customer service desk on WhatsApp# (+234) 0803-766-4978 and get your complete project material instantly.

    * All project materials on this website are well researched by professionals with high level of professionalism.


TESTIMONIES FROM OUR CLIENTS

Please feel free to carefully review some written and captured responses from our satisfied clients.


  • Debby Henry George, Massachusetts Institute of Technology (MIT), Cambridge, USA.

    "Exceptionally outstanding. Highly recommend for all who wish to have effective and excellent project defence. Easily Accessable, Affordable, Effective and effective."


  • Hilary Yusuf, United States International University Africa, Nairobi, Kenya.

    "I saw this website on facebook page and I did not even bother since I was in a hurry to complete my project. But I am totally amazed that when I visited the website and saw the topic I was looking for and I decided to give a try and now I have received it within an hour after ordering the material. Am grateful guys!"


  • Debby Henry George, Massachusetts Institute of Technology (MIT), Cambridge, USA.

    "Researchwap.net is a website I recommend to all student and researchers within and outside the country. The web owners are doing great job and I appreciate them for that. Once again, thank you very much "researchwap.net" and God bless you and your business! ."


  • Lamilare Valentine, Kwame Nkrumah University, Kumasi, Ghana.

    "Great User Experience, Nice flows and Superb functionalities.The app is indeed a great tech innovation for greasing the wheels of final year, research and other pedagogical related project works. A trial would definitely convince you."


  • Sampson, University of Nigeria, Nsukka.

    "I love what you guys are doing, your material guided me well through my research. Thank you for helping me achieve academic success."


  • Cynthia, Akwa Ibom State University .

    "researchwap.com is God-sent! I got good grades in my seminar and project with the help of your service, thank you soooooo much."


  • Elizabeth, Obafemi Awolowo University

    "Sorry, it was in my spam folder all along, I should have looked it up properly first. Please keep up the good work, your team is quite commited. Am grateful...I will certainly refer my friends too."


  • Ali Olanrewaju, Lagos State University.

    "Am happy the defense went well, thanks to your articles. I may not be able to express how grateful I am for all your assistance, but on my honour, I owe you guys a good number of referrals. Thank you once again."


  • Willie Ekereobong, University of Port Harcourt.

    "My Dear Researchwap, initially I never believed one can actually do honest business transactions with Nigerians online until i stumbled into your website. You have broken a new legacy of record as far as am concerned. Keep up the good work!"


  • Theressa, Igbinedion University.

    "WOW, SO IT'S TRUE??!! I can't believe I got this quality work for just 5k...I thought it was scam ooo. I wouldn't mind if it goes for over 5k, its worth it. Thank you!"


  • Joseph, Abia state Polytechnic.

    "I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much researchwap.com, infact, I owe my graduating well today to you guys...."


  • Christiana, Landmark University .

    "My friend told me about ResearchWap website, I doubted her until I saw her receive her full project in less than 15 miniutes, I tried mine too and got it same, right now, am telling everyone in my school about researchwap.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work"


  • Musa, Federal University of Technology Minna

    "I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!."


  • Ali Obafemi, Ibrahim Badamasi Babangida University, Niger State.

    "I was scared at first when I saw your website but I decided to risk my last 5k and surprisingly I got my complete project in my email box instantly. This is so nice!!!."


  • To contribute to our success story, send us a feedback or please kindly call 2348037664978.
    Then your comment and contact will be published here also with your consent.
    Thank you for choosing researchwap.com.

FREQUENTLY ASKED QUESTIONS

  • How can I get the complete project - THE IMPACT OF MATERIAL HANDLING EQUIPMENT ON STORE ACTIVITIES (A CASE STUDY OF DOYIN INVESTMENT LIMITED COMPANY)

    Simply click on the DOWNLOAD green button above and follow the procedure stated.


    Is it a complete project work or just materials?

    Yes, it's a Complete Research Project material. i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data


    What if I want to change the case study for THE IMPACT OF MATERIAL HANDLING EQUIPMENT ON STORE ACTIVITIES (A CASE STUDY OF DOYIN INVESTMENT LIMITED COMPANY), What can i do?

    Chat with Our 24/7 Customer Service Desk Now: WhatsApp# and you will be responded to Instantly


    How long does it take to get the complete project on THE IMPACT OF MATERIAL HANDLING EQUIPMENT ON STORE ACTIVITIES (A CASE STUDY OF DOYIN INVESTMENT LIMITED COMPANY)?

    Depending on how fast your payment and details is acknowledged by us, you will get the complete project within 30 minutes. However, on a very good day you can still get it within 15 minutes!


    How will I get my complete project?

    The Complete Project Material will be Delivered via your Email Address in an MS Word document format


    Can I get my Complete Project through WhatsApp?

    Yes! We also send your Complete Research Project to your WhatsApp Number


    What if my Project Supervisor made some changes to a topic i picked from your website?

    Call or Chat With Our 24/7 Custumer Care Desk: +2348037664978 and you will be responded to Instantly


    Do you assist students with Assignment, Term Paper, Seminar and Project Proposal?

    Call or Chat With Our 24/7 Custumer Care Desk: +2348037664978 and you will be responded to Instantly


    What if i do not have any project topic idea yet?

    Don't Worry! We've Got Your Covered. Chat with us on WhatsApp# (+234) 0803-766-4978 to Get Instant Help.


    Why should I trust this website?

    We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "TOPNOTCH INFOTECH ENTERPRISE". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!


    I have a fresh topic that is not on your site. How do I go about it?

    Don't Worry, Chat with us on WhatsApp# (+234) 0803-766-4978 to Get Instant Help.



PROJECT DETAILS

PAGES: 55
FORMAT: MS WORD
Chapters: 1-5
PRICE: ₦ 5,000.00




TYPE TOPIC OR KEYWORD AND CLICK SEARCH: