PROJECT COST CONTROL IN THE NIGERIAN CONSTRUCTION INDUSTRY (A CASE STUDY OF EL-ALAN CONSTRUCTION COMPANY (NIGERIA) LIMITED)


Department Of Project Management


PAGES: 69
FORMAT: MS WORD
Chapters: 1-5
PRICE: ₦ 5,000.00

PROJECT COST CONTROL IN THE NIGERIAN CONSTRUCTION INDUSTRY (A CASE STUDY OF EL-ALAN CONSTRUCTION COMPANY (NIGERIA) LIMITED)   

TABLE OF CONTENT

Title page………………..i

Certification………….…ii

Dedication………………iii

Acknowledgement……….iv

Table of content……...…v

CHAPTER ONE

Introduction

1.1.    Background of the study

1.2.    Statement of the general problem

1.3.    Aims and objectives of the study

1.4.    Research questions

1.5.    Research hypothesis

1.6.    Significance of the study

1.7.    Scope of the study

1.8.    Limitation of the study

1.9.    Definition of terms

References

CHAPTER TWO

Literature review

2.1 introduction

2.2 cost management and cost control techniques Used in the construction industry

2.2.1 cost value reconciliation

2.2.2 the project budget

2.2.3 cost forecasting

2.2.4 schedule control

2.2.5 earned value analysis

2.2.6 variance analysis

2.3 relationship between construction project Delivery and cost

2.4 factors affecting construction cost and time Performance

2.5 factors causing project cost overruns

2.6 factors causing construction time delays

2.7 empirical literature

References

CHAPTER THREE

Methodology

3.1 research design

3.2 population of the study

3.3 sampling and sampling technique

3.4 instrument/method of data collection

3.5 validity and reliability of the instrument

3.6 method of data analysis

CHAPTER FOUR

Presentation and analysis of results

4.1 demographic information of the respondents

4.2 answers to the research questions

4.3 research hypothesis

CHAPTER FIVE

Summary, conclusion and recommendation

5.1    summary of findings

5.2  Conclusion and recommendation

Questionnaire

CHAPTER ONE

INTRODUCTION

Background of the study: PROJECT COST CONTROL IN THE NIGERIAN CONSTRUCTION INDUSTRY (A CASE STUDY OF EL-ALAN CONSTRUCTION COMPANY (NIGERIA) LIMITED)

Project cost controls in the Nigerian construction sector have always been under studied. On the course of prosecuting a project, controlling the cost of these projects would help in maintaining such projects from being too capital intensive which may lead to the project being abandoned. For every project to be successfully executed, its cost must have been analyzed and the cost from start to finish noted so as to prevent unnecessary contingency spendings which may hamper the complete execution of the project. Cost control includes monitoring cost, task completion, and time. If total cost of a project at a given time is over the cost baseline, cost control measures may be necessary. Such project management actions may range from ensuring that only tasks within the scope of the work are being performed to alerting stakeholders of potential cost overruns. As a project manager, it is important, professional, and ethical to identify and report on these issues as soon as they are identified.

Organizations whether private or government owned must complete projects on budget to achieve financial objectives and save cost. Project managers applying cost control techniques effectively can ensure that projects stay within projected budgets or are allowed to exceed budgets in a controlled way for specific reasons. When an organization implements appropriate project cost controls, it reduces risk and receives the full benefits anticipated from project completion.

Controlling costs means meeting a budget that is based on cost estimates. The two components of such estimates are the scope of the work and the cost of each completed task. The project plan details the requirements for the project, which you have to translate into activities. A typical activity requires labor, materials and equipment. Once you have defined the project scope in terms of activities and divided the activity into its cost components, you can calculate cost estimates using costs from historical sources, bids, industry norms and other projects as a base.

Statement of the general problem

The increase in the number of abandoned, uncompleted and under completed projects by individuals, companies and even government has been a cause for serious concern. This high rate of abandonment has inflicted our infrastructural development negatively and may have dissuadedprospective investors from investing in our economy.

Aims and objectives of the study:

The following will be our aims and objectives for undertaking this study

To examine the level of implementation of project cost control in the Nigerian construction industry. To know if adherence to project cost control increases the profitability of Nigerian construction industry. To know if project cost control improves the Nigerian construction industry. To know if project cost control reduces abandonment and under completion of projects.

Significance of the study:

This study will be of great importance to project managers, government, researchers and captains of industries seeing that it would unravel the implications and benefits of ensuring project cost control in the Nigerian construction industry and the economy of Nigeria at large.

Scope of the study:

This study is restricted to project cost control in the Nigerian construction industry with EL-ALAN Construction Company (Nigeria) Limited as its case study.

Limitation of the study:

Financial constraint- Insufficient fund tends to impede the efficiency of the researcher in sourcing for the relevant materials, literature or information and in the process of data collection (internet, questionnaire and interview).

Time constraint- The researcher will simultaneously engage in this study with other academic work. This consequently will cut down on the time devoted for the research work.

Research Questions

What is the impact of project cost control on the Nigerian construction industry? Does project cost control enhance the quality of constructions in the Nigerian construction industry? What is the impact of project cost control on the infrastructural development of Nigeria? Is there a relationship between project cost control and economic development in Nigeria?

Research Hypothesis

H0: Effective project cost control does not improve the quality of constructions in the Nigerian construction industry

H1: Effective project cost control does not improve the quality of constructions in the Nigerian construction industry

Definition of terms

Project:A planned piece of work that is designed to find information about something, to produce something new, or to improve something.

Cost:the amount of money that you need in other to buy, make or do something.

Construction:the process or method of building or making something, especially roads, building, bridges etc.

    REFERENCES

Aibinu, A.A. and Jagboro, G.O. (2002) The Effects of Construction Delays on Projects delivery in the Nigerian Construction Industry. International Journal of Project Management 20, 593 – 599

Asamoah, J. (2002) Satisfying the Energy Hunger in West Africa: A Progress on West Africa Gas Pipeline. African energy, Brooke Patrick Publications, Johannesburg, http//wwwafricanenergy.co.za

Buhari I.B. (1991) Inflation and the Nigerian economy.The Nigerian Quantity Surveyor.8-9 4.

Cooke, B. and Williams P. (2003) Construction Planning, Programming and Control, 2nd edition. Palgrave, New York.

Elinwa, U., and Buba, S., (1993): Construction Cost Factors in Nigeria. Journal of Construction Engineering and Management. 119, (4) 698-714.

Eyo - Ita – Eyo, (2001) Nigerian Cement Industry is Pathetic. THISDAY People, Leaders and company limited. httpwww.thisdayonline.com

Fisk, E.R. (1997) Construction Project Administration, 5 th Edition. Prentice Hall, New Jersey

Frimpong, Y., Oluwoye, J. and Crawford, L. (2003) Causes of Delays and Cost Overruns in Construction of Ground water Projects in Developing Countries; Ghana as a case study. International journal of project Management 21, 321 – 326

Husseini A.A. (1991) Construction and the National Economy. The Nigerian Quantity Surveyor. 20 – 21

Isiadinso, E.I.; (1988) ‘The needs and Problems of the Building industry in Nigeria – A Quantity Surveyor’s View.Research Institute Seminar, Nigerian Building and Road Research Institute.

Kangari K. (1989): Business failure in Industry. Journal of Construction Engineering and Management. 115 (2) 173 – 187.

Makoju, J. (2000) Challenges of Investing in Nigeria’s Power Sector.THISDAY Online.com, THISDAY People, Leaders and Company Limited. http/ /wwwthisdayonline.com

.



TYPE IN YOUR TOPIC OR KEYWORD AND CLICK SEARCH:

HOW TO GET YOUR COMPLETE PROJECT MATERIAL INSTANTLY

  • * Select 3 free project topics of your choice from your Department

    * Submit the 3 project topics to your Supervisor for his or her Approval

    * Call our 24/7 customer service desk or WhatsApp Chat# (+234) 0803-766-4978 and get your project topics and complete material instantly.

    * You can also send an Email to [email protected]

    * All project materials on this website are well researched by professionals with high level of professionalism.


TESTIMONIES FROM OUR CLIENTS

Please feel free to carefully review some written and captured responses from our satisfied clients.


  • Debby Henry George, Massachusetts Institute of Technology (MIT), Cambridge, USA.

    "Exceptionally outstanding. Highly recommend for all who wish to have effective and excellent project defence. Easily Accessable, Affordable, Effective and effective."

  • Hilary Yusuf, United States International University Africa, Nairobi, Kenya.

    "I saw this website on facebook page and I did not even bother since I was in a hurry to complete my project. But I am totally amazed that when I visited the website and saw the topic I was looking for and I decided to give a try and now I have received it within an hour after ordering the material. Am grateful guys!"

  • Debby Henry George, Massachusetts Institute of Technology (MIT), Cambridge, USA.

    "Researchwap.net is a website I recommend to all student and researchers within and outside the country. The web owners are doing great job and I appreciate them for that. Once again, thank you very much "researchwap.net" and God bless you and your business! ."

  • Lamilare Valentine, Kwame Nkrumah University, Kumasi, Ghana.

    "Great User Experience, Nice flows and Superb functionalities.The app is indeed a great tech innovation for greasing the wheels of final year, research and other pedagogical related project works. A trial would definitely convince you."

  • Sampson, University of Nigeria, Nsukka.

    "I love what you guys are doing, your material guided me well through my research. Thank you for helping me achieve academic success."

  • Cynthia, Akwa Ibom State University .

    "researchwap.com is God-sent! I got good grades in my seminar and project with the help of your service, thank you soooooo much."

  • Elizabeth, Obafemi Awolowo University

    "Sorry, it was in my spam folder all along, I should have looked it up properly first. Please keep up the good work, your team is quite commited. Am grateful...I will certainly refer my friends too."

  • Ali Olanrewaju, Lagos State University.

    "Am happy the defense went well, thanks to your articles. I may not be able to express how grateful I am for all your assistance, but on my honour, I owe you guys a good number of referrals. Thank you once again."

  • Willie Ekereobong, University of Port Harcourt.

    "My Dear Researchwap, initially I never believed one can actually do honest business transactions with Nigerians online until i stumbled into your website. You have broken a new legacy of record as far as am concerned. Keep up the good work!"

  • Theressa, Igbinedion University.

    "WOW, SO IT'S TRUE??!! I can't believe I got this quality work for just 5k...I thought it was scam ooo. I wouldn't mind if it goes for over 5k, its worth it. Thank you!"

  • Joseph, Abia state Polytechnic.

    "I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much researchwap.com, infact, I owe my graduating well today to you guys...."

  • Christiana, Landmark University .
    Christiana, Landmark University .

    "My friend told me about ResearchWap website, I doubted her until I saw her receive her full project in less than 15 miniutes, I tried mine too and got it same, right now, am telling everyone in my school about researchwap.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work"

  • Musa, Federal University of Technology Minna

    "I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!."

  • Ali Obafemi, Ibrahim Badamasi Babangida University, Niger State.

    "I was scared at first when I saw your website but I decided to risk my last 5k and surprisingly I got my complete project in my email box instantly. This is so nice!!!."


  • To contribute to our success story, send us a feedback or please kindly call 2348037664978.
    Then your comment and contact will be published here also with your consent.
    Thank you for choosing researchwap.com.

FREQUENTLY ASKED QUESTIONS

  • 1. How can I get the complete project if I order?

    AFTER FOLLOWING THE PAYMENT PROCEDURES HERE, AND WE RECEIVE YOUR DETAILS AS SMS ON 08037664978 or as mail to [email protected], THE MATERIAL WILL BE ATTACHED AND MAILED TO YOUR EMAIL ADDRESS WITHIN 30 MINUTES, AND A NOTIFICATION OF THE DELIVERY WILL BE SENT TO YOUR PHONE NUMBER.

    2. How will my payment be confirmed?

    FOLLOW THE PAYMENT INSTRUCTIONS FOUND ON THE PAYMENTS PAGE. NOTE: Payment information is required for Payment Confirmation.

    3. One of your topics suites my project, but the case study is different. What step should I take?

    Students are always advised to use our materials as guide. However, if you have a different case study, you may need to consult researchwap.com Depending on similarity of the organization/industry (case study) you may modify to, if you wish.

    4. How long does it take to get the complete project?

    Depending on how fast your payment and details is acknowledged by us, you will get the complete project within 30 minutes. However, on a very good day you can still get it within 15 minutes!

    5. Why should I trust this website?

    We are well aware of fraudulent activities (scam) that have been happening on the internet. It is unfortunate, but hopefully declining. However, we wish to re-assure our esteemed clients that we are genuine and our services is authentic, if not, we would not post our account details, email address, phone number or any personal details that could be traceable. Free chapter 1 is always given on the site to prove to you that we got the material. If you are unable to view the free chapter 1 send an email or SMS containing your name, topic, with the subject head "FREE CHAPTER 1" to [email protected] or 08037664978 plus the topic. You will get the free chapter 1 within an hour.

    6. Do you accept ATM payments and Online Transfers?

    Yes. We accept ATM transfers and online payments. FOLLOW THE PAYMENT INSTRUCTIONS FOUND ON THE PAYMENTS PAGE.

    7. Is it a complete research project or just materials?

    Yes it is a complete research project. We send complete project materials (i.e. chapters 1-5, full references, and questionnaires/secondary data to your email address after payment confirmation.

    8. How can I pay Online with my ATM card?

    1. Visit an ATM

    2. Insert your card

    3. Select Quickteller

    4. Select "Pay bills"

    5. Choose your account type

    6. Select "Others"

    7. Enter 322222 as the payment code

    8. Enter your phone number as "Customer Reference"

    9. Accept the N1.00 amount displayed

    10. Follow prompts to complete the transaction

    9. How will I receive a software?

    A link to download the software will always be on the first page of the material.

    10. I have a fresh topic that is not on your site. How do I go about it?

    We have professional writers in management sciences, computer science and social sciences. If you have a fresh topic, just click this hire a writer link, fill the form, submit the details and one of our writers will contact you shortly.


PROJECT DETAILS

PAGES: 69
FORMAT: MS WORD
Chapters: 1-5
PRICE: ₦ 5,000.00




TYPE TOPIC OR KEYWORD AND CLICK SEARCH: