ASSESSMENT OF CONSTRUCTION MANAGEMENT TECHNIQUES IN NIGERIA CONSTRUCTION INDUSTRY (A CASE STUDY OF IBADAN IN OYO STATE)


Department Of Project Management


PAGES: 70
FORMAT: MS WORD
Chapters: 1-5
PRICE: ₦ 5,000.00

ASSESSMENT OF CONSTRUCTION MANAGEMENT TECHNIQUES IN NIGERIA CONSTRUCTION INDUSTRY (A CASE STUDY OF IBADAN IN OYO STATE)

TABLE OF CONTENT

Title page………………..i

Certification………….…ii

Dedication………………iii

Acknowledgement……….iv

Table of content……...…v

CHAPTER ONE

Introduction

1.1    Background of the study

1.2  statement of research problem

1.3 significance of the study

1.4  research questions    

1.5   objectives of the study

1.6    research hypotheses

1.7    scope of the study

1.8   limitation of the essay

1.9    definition of terms

CHAPTER TWO

Literature review

2.0 introduction

2.1 constructionproject management

2.1.1 construction project integration management

2.1.2 construction project scope management

2.1.3 construction project time management

2.1.4 construction project cost management

2.1.5 construction project quality management: as commented by pinto

2.1.6construction project human resource management

2.1.7construction project communications management

2.1.8construction project risk management

2.1.9construction project procurement management

2.2 functions of construction project management

2.3 the role of construction project managers

2.4 construction management techniques and tools

2.4.1 work breakdown structure (wbs)

2.4.2 gantt chart

2.4.3 the line of balance (lob)

2.4.4 network analysismethods

2.4.5 prince 2which

2.4.6 project sensitivity analysis

2.4.7 cost benefit analysis (cba)is

2.4.8 graphical evaluation and review technique (gert)

2.4.9programmne evaluation and review technique (pert)

2.4.9.1 steps in the pert planning process

2.4.9.2 benefits of pert

2.4.9.3 limitations of pert

2.4.10 lean construction management technique:

2.4.11 just in time method(jit)

2.4.12 monte carlo technique

2.4.13. Critical path method (cpm):-

2.4.13.1cpm limitations

2.5construction project management phases

2.6    critical barriers / problems of implementing effective 

Construction management:

CHAPTER THREE

Research methodology

3.0 introduction

3.1 research strategy

3.2 research design

3.3 research population

3.4 sample frame

3.5 sample size

3.6 sampling technique

3.7 data collection instrument

3.8 approach / procedure for data collection

3.9 method of data analysis

CHAPTER FOUR

Analysis of data and presentationof results

4.0 introduction

4.1 levels of measurement

4.2 analysis and presentation of results

4.2.1: type of business

4.2.2 years of experience of the firm / organization

4.2.3 respondent designation

4.2.4 respondent highest academic qualification

4.2.5 respondent professional qualification

4.2.6 type of project handled by respondents   

4.2.7: assessment of construction management technique in the nigeria construction industry.

4.2.8 impact of construction management tech. On construction cost,

4.2.9 factors affecting construction management techniques in the nigeria construction industry

CHAPTER FIVE

Summary, conclusion and recommendation

5.1 summary

5.2 conclusion

5.3 recommendation

References

CHAPTER ONE

INTRODUCTION

1.1    BACKGROUND OF THE STUDY

A major concern of stakeholders (clients, consultants, contractors, e.t.c) in Nigerian construction industry is how to improve service delivery. Mitullah and Wachira (2003) havereported that the development of an efficient construction industry is an objective of policy in most countries.

The construction industry is the pivot of any economy and a belief held in both the developed and developing countries (Nubi. 2003). Adam (1992) emphasized that through its contribution v to National Gross Domestic Product (GDP), labour, employment and gross fixed capital formation (GFCF) construction industry’s importance in the overall economy cannot be underestimated. The industry provides the infrastructure, buildings, roads, bridges, dams, ports and other construction products that are required for economic development.

Construction is a $ 1.7 trillion industry worldwide (Bray, 2005). Global construction is said to have contribution amounting to between 5 and 7 percent of GDP in most countries and accounts for a significant part of global cross capital formation- a little under one third ( Brays, 2005). The United Nations Environment programme(UNEP) has noted that about one-tenth of the global economy is dedicated to construction and operating homes and offices (UNEP, 1996). Mitullah and Wichira (2003) also stated that construction activiuty plays a vital role in the process of economic growth and development, both through its products (infrastructure, buildings) and through the employment created in the process of construction itself.

The construction industry in Nigeria is of paramount importance for employment and economic growth (Ogunsemi and Jagboro, 2006). Presently, the construction industry in Nigeria contributes about 3 percent to the nation’s Gross Domestic Product(GDP) (Aganga, 2010). This is far below between 5 and 7 percent of GDP in most countries. Therefore, effort gears towards improving the efficiency of the construction industry in Nigeria in terms of improving on construction management techniques is worthwhile and will contribute to better performance of the industry. This study therefore examines the construction management techniques among contracting firms in Ibadan, Oyo State.

A project is made up of a group of interrelated work activities constrained by a specific scope, budget, and schedule to deliver capital assets needed to achieve the strategic goals of an Agency (Idoro and Patunola – Ajayi, 2009). All projects must have a beginning and an end. The management of construction projects requires knowledge of modern management as well as an understanding of the design and construction process. Construction projects have a specific set of objectives and constraints such as a required time frame for completion. While the relevant technology, institutional arrangements or processes will differ, the management of such projects has much in common with the management of similar types of projects in other specialty or technology domains such as aerospace, pharmaceutical and energy developments (Muller and Turner, 2007).Construction Project management is the art of directing and coordinating human and material resources throughout the life of a construction project by using modern construction management techniques to achieve predetermined objectives of scope, cost, time, quality and participation satisfaction (Idoro and Patunola – Ajayi, 2009).  By contrast, the general management of business and industrial corporations assumes a broader outlook with greater continuity of operations. Nevertheless, there are sufficient similarities as well as differences between the two so that modern management techniques developed for general management may be adapted for project management. (Arnaboldi et.al, 2004)

A working knowledge of general management and familiarity with the special knowledge domain related to the project are indispensable. Supporting disciplines such as computer science and decision science may also play an important role. In fact, modern management practices and various special knowledge domains have absorbed various techniques or tools which were once identified only with the supporting disciplines.(Arnaboldi et.al, 2004). For example, computer- based information systems and decision support systems are now common-place tools for general management. Similarly, many operations research techniques such as linear programming and network analysis are now widely used in many knowledge or application domains.

Construction project management encompasses a set of objectives which may be accomplished by implementing a series of operations subject to resource constraints. There are potential conflicts between the stated objectives with regard to scope, cost, time and quality, and the constraints imposed on human material and financial resources. (Idoro and Patunola – Ajayi, 2009) These conflicts should be resolved at the onset of a project by making the necessary tradeoffs or creating new alternatives.

1.2  STATEMENT OF RESEARCH PROBLEM

The construction business in Nigeria is a multi-billion dollar industry with hardly any year falling short of expected windfalls befalling successful contractors who bid for construction projects, the last 5 years has witnessed increasing patronage and profit formost construction companies in Nigeria (Business Day Nigeria, 2010). This is especially seen with some publicly quoted companies like Julius Berger Plc. Costain West Africa and G. Cappa Plc which have recorded steadily rising profits with the last two just recovering from years ofconsistent loses. Many others which are not publicly quoted are rapidly expanding their operationsto meet up with greater challenges such as PW limited, Lekki Concession  Company and Hitech all of which are handling major infrastructural projects like roads and drainage reconstruction / expansion and Land reclamation ( from the Lagos Lagoon) projects ( Business Day Nigeria, 2010).

Recently a number of development projects by government and private sector companies have created opportunities for construction companies to reap massive revenues. For instance, in recent times in most states of Nigeria infrastructural projects like road reconstruction, housing projects, bridge building, construction of drainage,dams rural electrification, city expansion and beautification projects among others have been on the increase especiallyin Lagos, Rivers and AkwaIbom states where massive amounts of money runninginto tens of billions of dollars have been voted for capital projects. Against this background, with more capital investment in the construction industry in Nigeria because the nation is at the developing stage, there is  a need to investigate construction management techniques in use among  contracting firms or organization in Ibadan, Oyo State.

1.3 SIGNIFICANCE OF THE STUDY

Nigeria has large expanse of undeveloped land requiring road construction to link many part of the country with other parts and construction of low cost housing to accommodate many of its city dwellers. Also that many state governments are coming to terms with the importance of sticking to master plans and town planning laws means that in coming years many large scale construction projects will be embarked upon. Major infrastructures like good road networks, that will support development are lacking and hence is major cause of inadequate foreign investments (Business Day Nigeria, 2010).

This has prompted governments at both state and federal levels to embark on long term infrastructure projects. State and Federal governments are looking for alternative sources of revenue (non-oil based sources) like taxation which depends largely on available infrastructure. Of recent, crude oil deposits have been found in some parts of Nigeria implying that very soon infrastructural work would begin in surrounding areas. However, this is also dependent on security as the Niger delta is highly notorious for security threats from militants. Therefore, good management techniques will definitely determine the kind of output of the industry and measure the efficiency of the industry in Nigeria with Ibadan in Oyo State as a case study.

1.4  RESEARCH QUESTIONS    

From the above information, the research question generated which this study provides answers to are:

i.    What are the construction management techniques in the construction industry in Ibadan, Oyo state?

ii.    What are the factors affecting the construction management techniques in Ibadan, Oyo state?

iii.    What are the impact of construction management techniques on construction cost, time and overall performance in Ibadan, Oyo State?

1.5   OBJECTIVES OF THE STUDY

The aim of this study is to evaluate tools / techniquesfor managing construction project with a view to improving project delivery process in Ibadan, Oyo State.The study specific objectives are to:

a)identify and assess construction management techniques in the construction industry in Ibadan,OyoState,

b)identify and assess factors affecting the construction management techniques in Oyostate, and

c)examine the impact of  construction management techniques on construction cost, time and quality in Ibadan, Oyo state.

1.6    RESEARCH HYPOTHESES

Ho: There are no construction management techniques in the construction industry in Ibadan, Oyo state.

Hi:There are construction management techniques in the construction industry in Ibadan, Oyo state.

Ho: There are no factors affecting the construction management techniques in Ibadan, Oyo state.

Hi: There arefactors affecting the construction management techniques in Ibadan, Oyo state.

Ho: There is no significant impact of construction management techniques on construction cost, time and quality in Ibadan, Oyo state.

Hi: There is significant impact of construction management techniques on construction cost, time and quality in Ibadan, Oyo state.

1.7    SCOPE OF THE STUDY

The management of construction project is a tool forachieving an efficient construction industry. The scope of construction projects ranging from buildings (institutional, commercial, public buildings e.t.c), civil engineering (roads, culverts, bridges e.t.c) among others. The scope of this study is limited tosome Construction Industries some Construction Industries in Oyo State in Oyo State.

1.8   LIMITATION OF THE ESSAY

This research covers the Assessment of Construction Management Techniques in the Nigeria Construction Industry taking Ibadan, Oyo State as     the case study area.

The essay is however limited to the following:

⦁    Financial constraints

⦁    Time constraints and

⦁    Lack of access to some information needed for the project work.

1.9    DEFINITION OF TERMS

Construction:The action of building something, typically a large structure.

Management Techniques:Effective methods of managing that help to develop a productive workplace.

Construction Industry: The branch of manufacture and trade based on building, maintaining and repairing structures.

.



TYPE IN YOUR TOPIC OR KEYWORD AND CLICK SEARCH:

HOW TO GET YOUR COMPLETE PROJECT MATERIAL INSTANTLY

  • * Select 3 free project topics of your choice from your Department

    * Submit the 3 project topics to your Supervisor for his or her Approval

    * Call our 24/7 customer service desk or WhatsApp Chat# (+234) 0803-766-4978 and get your project topics and complete material instantly.

    * You can also send an Email to [email protected]

    * All project materials on this website are well researched by professionals with high level of professionalism.


TESTIMONIES FROM OUR CLIENTS

Please feel free to carefully review some written and captured responses from our satisfied clients.


  • Debby Henry George, Massachusetts Institute of Technology (MIT), Cambridge, USA.

    "Exceptionally outstanding. Highly recommend for all who wish to have effective and excellent project defence. Easily Accessable, Affordable, Effective and effective."

  • Hilary Yusuf, United States International University Africa, Nairobi, Kenya.

    "I saw this website on facebook page and I did not even bother since I was in a hurry to complete my project. But I am totally amazed that when I visited the website and saw the topic I was looking for and I decided to give a try and now I have received it within an hour after ordering the material. Am grateful guys!"

  • Debby Henry George, Massachusetts Institute of Technology (MIT), Cambridge, USA.

    "Researchwap.net is a website I recommend to all student and researchers within and outside the country. The web owners are doing great job and I appreciate them for that. Once again, thank you very much "researchwap.net" and God bless you and your business! ."

  • Lamilare Valentine, Kwame Nkrumah University, Kumasi, Ghana.

    "Great User Experience, Nice flows and Superb functionalities.The app is indeed a great tech innovation for greasing the wheels of final year, research and other pedagogical related project works. A trial would definitely convince you."

  • Sampson, University of Nigeria, Nsukka.

    "I love what you guys are doing, your material guided me well through my research. Thank you for helping me achieve academic success."

  • Cynthia, Akwa Ibom State University .

    "researchwap.com is God-sent! I got good grades in my seminar and project with the help of your service, thank you soooooo much."

  • Elizabeth, Obafemi Awolowo University

    "Sorry, it was in my spam folder all along, I should have looked it up properly first. Please keep up the good work, your team is quite commited. Am grateful...I will certainly refer my friends too."

  • Ali Olanrewaju, Lagos State University.

    "Am happy the defense went well, thanks to your articles. I may not be able to express how grateful I am for all your assistance, but on my honour, I owe you guys a good number of referrals. Thank you once again."

  • Willie Ekereobong, University of Port Harcourt.

    "My Dear Researchwap, initially I never believed one can actually do honest business transactions with Nigerians online until i stumbled into your website. You have broken a new legacy of record as far as am concerned. Keep up the good work!"

  • Theressa, Igbinedion University.

    "WOW, SO IT'S TRUE??!! I can't believe I got this quality work for just 5k...I thought it was scam ooo. I wouldn't mind if it goes for over 5k, its worth it. Thank you!"

  • Joseph, Abia state Polytechnic.

    "I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much researchwap.com, infact, I owe my graduating well today to you guys...."

  • Christiana, Landmark University .
    Christiana, Landmark University .

    "My friend told me about ResearchWap website, I doubted her until I saw her receive her full project in less than 15 miniutes, I tried mine too and got it same, right now, am telling everyone in my school about researchwap.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work"

  • Musa, Federal University of Technology Minna

    "I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!."

  • Ali Obafemi, Ibrahim Badamasi Babangida University, Niger State.

    "I was scared at first when I saw your website but I decided to risk my last 5k and surprisingly I got my complete project in my email box instantly. This is so nice!!!."


  • To contribute to our success story, send us a feedback or please kindly call 2348037664978.
    Then your comment and contact will be published here also with your consent.
    Thank you for choosing researchwap.com.

FREQUENTLY ASKED QUESTIONS

  • 1. How can I get the complete project if I order?

    AFTER FOLLOWING THE PAYMENT PROCEDURES HERE, AND WE RECEIVE YOUR DETAILS AS SMS ON 08037664978 or as mail to [email protected], THE MATERIAL WILL BE ATTACHED AND MAILED TO YOUR EMAIL ADDRESS WITHIN 30 MINUTES, AND A NOTIFICATION OF THE DELIVERY WILL BE SENT TO YOUR PHONE NUMBER.

    2. How will my payment be confirmed?

    FOLLOW THE PAYMENT INSTRUCTIONS FOUND ON THE PAYMENTS PAGE. NOTE: Payment information is required for Payment Confirmation.

    3. One of your topics suites my project, but the case study is different. What step should I take?

    Students are always advised to use our materials as guide. However, if you have a different case study, you may need to consult researchwap.com Depending on similarity of the organization/industry (case study) you may modify to, if you wish.

    4. How long does it take to get the complete project?

    Depending on how fast your payment and details is acknowledged by us, you will get the complete project within 30 minutes. However, on a very good day you can still get it within 15 minutes!

    5. Why should I trust this website?

    We are well aware of fraudulent activities (scam) that have been happening on the internet. It is unfortunate, but hopefully declining. However, we wish to re-assure our esteemed clients that we are genuine and our services is authentic, if not, we would not post our account details, email address, phone number or any personal details that could be traceable. Free chapter 1 is always given on the site to prove to you that we got the material. If you are unable to view the free chapter 1 send an email or SMS containing your name, topic, with the subject head "FREE CHAPTER 1" to [email protected] or 08037664978 plus the topic. You will get the free chapter 1 within an hour.

    6. Do you accept ATM payments and Online Transfers?

    Yes. We accept ATM transfers and online payments. FOLLOW THE PAYMENT INSTRUCTIONS FOUND ON THE PAYMENTS PAGE.

    7. Is it a complete research project or just materials?

    Yes it is a complete research project. We send complete project materials (i.e. chapters 1-5, full references, and questionnaires/secondary data to your email address after payment confirmation.

    8. How can I pay Online with my ATM card?

    1. Visit an ATM

    2. Insert your card

    3. Select Quickteller

    4. Select "Pay bills"

    5. Choose your account type

    6. Select "Others"

    7. Enter 322222 as the payment code

    8. Enter your phone number as "Customer Reference"

    9. Accept the N1.00 amount displayed

    10. Follow prompts to complete the transaction

    9. How will I receive a software?

    A link to download the software will always be on the first page of the material.

    10. I have a fresh topic that is not on your site. How do I go about it?

    We have professional writers in management sciences, computer science and social sciences. If you have a fresh topic, just click this hire a writer link, fill the form, submit the details and one of our writers will contact you shortly.


PROJECT DETAILS

PAGES: 70
FORMAT: MS WORD
Chapters: 1-5
PRICE: ₦ 5,000.00




TYPE TOPIC OR KEYWORD AND CLICK SEARCH: