This research work, accessing the impact of production planning and control on productivity in the manufacturing industry. This study is focused on Nigeria Bottling Company (Coca-Cola), Kaduna. The study covers five chapters, Chapter one introduces the subject matter and spells out the significance of the study. Chapter two make criteria review of the current literature on the subject matter. The third chapter presents the methods of data collections, chapter four shows the presentations and the analysis of the data collected from the respondents. The fifth chapter shows the summary, recommendation and conclusion. The population for this study covers three hundred staff of Cocacola, the researcher randomly selects thirty staff as his sample size. The hypothesis formulated of his study includes: H0: Effective production planning and control do not enhance organizational productivity. H1: Effective production planning and control enhance organizational productivity. Data collected were presented and analyzed in a tabular form using percentage. It was further tested with the use of chi-square and hypothesis was confirmed.

TABLE OF CONTENTS

Content                                        Page

Title page    -    -    -    -    -    -    -    -    -    -    i

Approval    -    -    -    -    -    -    -    -    -    -    ii

Dedication    -    -    -    -    -    -    -    -    -    -    iii

Acknowledgement    -    -    -    -    -    -    -    -    -    iv

Abstract    -    -    -    -    -    -    -    -    -    -    v

CHAPTER ONE: INTRODUCTION

1.1    Background of the Study    -        -        -        -        -        -        1

1.2    Statement of the Problem  -        -        -        -        -        -        3

1.3    Objectives of the Study       -        -        -        -        -        -        4

1.4    Statement of Hypothesis    -        -        -        -        -        -        5

1.5    Significance of the Study    -        -        -        -        -        -        5

1.6    Scope of the Study      -        -        -        -        -        -        -        5

1.7    Limitations of the Study     -        -        -        -        -        -        6

1.8    Historical Background of the Case Study     -        -        -        7

1.9    Definition of Terms    -        -        -        -        -        -        -        8

CHAPTER TWO: LITERATURE REVIEW

2.1    The Meaning of Production         -        -        -        -        -        -        10

2.2    Production Planning  -        -        -        -        -        -        -        12

2.3    Production Control     -        -        -        -        -        -        -        18

2.4    Planning and Control         -        -        -        -        -        -        -        20

2.5    Relationship between Production Planning and Control       -        25

2.6    Production Design and Process Planning    -        -        -        25

2.8    Basic Alternative/Process Selection     -        -        -        -        27

CHAPTER THREE: RESEARCH METHODOLOGY

3.1    Research Design         -        -        -        -        -        -        -        30    

3.2    Research Population -        -        -        -        -        -        -        30

3.3    Sample Size and Sampling Techniques        -        -        -        -        31

3.4    Methods of Gathering Data         -        -        -        -        -        -        31

3.5    Justification of Method Used      -        -        -        -        -        33

3.6    Method of Data Analysis    -        -        -        -        -        -        34

3.7    Justification of Instrument Used         -        -        -        -        -        34

CHAPTER FOUR: DATA PRESENTATION AND ANALYSIS

4.1    Data Presentation      -        -        -        -        -        -        -        35

4.2    Data Analysis    -        -        -        -        -        -        -        -        43

4.3    Test of Hypothesis     -        -        -        -        -        -        -        46

CHAPTER FIVE: SUMMARY, CONCLUSION AND RECOMMENDATIONS

5.1    Summary  -        -        -        -        -        -        -        -        -        49

5.2    Conclusion         -        -        -        -        -        -        -        -        -        49

5.3    Recommendations      -        -        -        -        -        -        -        50

References                   -        -        -        -        -        -        -        -        52

Appendix  -        -        -        -        -        -        -        -        -        54

CHAPTER ONE

1.1    BACKGROUND OF THE STUDY

Production Planning and control are terms that though commonly used have witness a lot of changes both in meaning and scope in the past four years, for example, based on the extended view of production to include the tradition of all of production services both as discipline of study and as a profession can now be practiced in all kind of organization. As in other field of management, planning and control forms the primary function of the production management. It is for this reason that this research has decided to take a critical look at production, planning and control as practiced in beverage industrial sector of the Nigeria economy. This is informed by the variety of major product and beverage produce in industry as exemplified by Nigerian Bottling Company (NBC) Kaduna.

Buffa (2002) defined production as the process by which goods and services are created. Production cab be regarded as the central focus of any manufacturing concern. It is that stage where the real action takes place i.e. the transformation of raw materials (input) into finished products (output). The planning and control operation are necessary because in every manufacturing unit there are people, machine and materials. There is the need to plan all expensive resources required for production in order to make effective use of them and maximize profit making for the organization.

Modern production is complex hence both technologically related operation and administrative activities must therefore be planned carefully to make account of all the possible restructure, constraints and advantages. In planning to meet order at less cost in the object of production planning.

According to Mayer (2002), there is a logic behind the operation of the production process, it sterns from the types of technology as well as in type of production in the particular manufacturing process.

Wild (2002) defined production as a managerial function that tends to design, plan what to produce, when to produce, where to produce and for whom to produce, the quantity, the quality to produce and for whom to produce. These function attempts to define the key decision model involved in production i.e. the long term and the short term planning and as well as identify the procedure and their control in a cost effective way.

Apple (2002) defined it as the activity of transforming raw material or component into finished product” whatever the definition it is clear that production essentially entails the production of goods and services.

Production planning involve not only the types of operation to the used but the order of these operations as well as a time or duration the operation should take how the plan should be laid out.

1.2       STATEMENT OF THE PROBLEM

Most organization production certainties are slow and time given to complete a given task always exceeds the expected given time. This study intends to investigate and know the reasons behind productivity among the employees.

And also a times, the use of quantitative techniques in assigning jobs in an organization, it is properly maintained, they get short of material due to lack of good control of stock. The scope and concept of production management is not fully known in some managers. The problem of production planning and control will be discussed in this work and solution.

Lastly, the study intends to know the problems associated with activities of planning in relation to Cocacola Production and Solution suggested.

1.3       OBJECTIVES OF THE STUDY

The following are the objectives of this study:

i)            To assess the impact of production planning and control on manufacturing industry.

ii)          To determine how effective planning and control enhance organizational productivity.

iii)        To identify the strategy for enhancing the organizational productivity.

iv)         To assess adequacy in controlling materials.

1.4       STATEMENT OF HYPOTHESIS

H0: Effective production planning and control do not enhance organizational productivity.

H1: Effective production planning and control enhance organizational productivity.

1.5       SIGNIFICANCE OF THE STUDY

The significance of this study cannot be overemphasized, because it helps manager and organization to minimize the production time and costs, by telling a production facility when to make with which staffs on which equipment or method to apply at any given situation or circumstances. It will also help the organization to maximize the efficiency of the operation and reduce costs thereby maximizing profit through effective use of plant and machines and by taking corrective measures. The organization will see it own lapses and improve on them so as to meet it own objective; other organization in the organization same time take correction on their production system.

1.6       SCOPE OF THE STUDY

Production Planning and Control being a complex and dynamic concept has a wide area of coverage so it is clear that research of this nature cannot hold without problem. As such this work is limited to the area that are relevant to the problem under investigation that is effective production planning and control on manufacturing industry taken Nigerian Bottling Company as a Case Study.

The major areas covered are the bottling line where the actual production scheduling and programming activities mostly take place. It covers other department in relation to production because they are all interrelated

1.7       LIMITATIONS OF THE STUDY

In the course of writing this work some limitations were encountered. For instance, the high cost of transportation limited the movement of the researcher. Also time constraint or limitation is another factor since the semester is a short one.

Another problem encountered is the respondents attitude while administering the questionnaire some of the employees showed non chalant attitude towards this work. Despite these problems faced, the researchers was lucky to gather enough materials necessary for the successful completion of the project.

1.8       HISTORICAL BACKGROUND OF THE CASE STUDY

Coca – Cola is the world – leading manufacturer of soft drinks sold in more than 145 countries. A total of 250 million bottles are consumed daily in all parts of the globe from Canada in North to Argentina and New Zealand in the South, from Alaska to China, from Mexico down to Nigeria. Coca – Cola first came to Nigeria in 1953 when Nigerian Bottling Company set up its first plant in Lagos. AJ Leventis brought Coca – Cola to Nigeria and is the owner of Nigerian Bottling Company (NBC).

The first plant was built in Apapa, Lagos. The Coca – cola company in Kaduna was established in the year 1976 when bottling commenced. It was to be the beginning of an exciting story of growth and development particularly during the last 10 years of the 20th century.

Nigerian Bottling Company is today Nigeria’s No. 1 bottler of s oft drinks, selling more than 6 million bottles a day. This figure made which is still gaining with the continuing expansion of the existing 12 plants and the opening of new plants in various parts of the federation.

The success of the Coca – cola has brought with it the development of a number of many industries, all contributing to the growth of the Nigerian economy, the Delta Glass Company, Ugheli which supplies millions of bottles requires to keep a large bottling company in operation in operation and the crown product factory in Ijebu – Ode and Kano which manufacture the metal crown used to seal the bottle. The Benin Plastic Company makes plastic crates for carrying the bottles. In addition, the trucks which are familiar in many parts of the country delivering soft drinks to more than sixty thousand dealers are assembled in Nigeria. Nigerian Bottling Company employs over 6,00 Nigerians in all fields of operation.

1.9       DEFINITION OF TERMS

i)            Production Schedule: This master production schedule comes next in sequence of events to produce products and services. It is proceeded by demand forecast and production plan.

ii)          Process Layout: This is characterized by situation in which similar machines and services are located together.

iii)        Line Layout: This is a production in which the products moves down a line, pass successive work situation where one operation is done after another.

iv)         Intermittent Production: This is where physical facilities must be flexible enough to handle a wide variety and size. The basis nature of activities impose change of the design.

v)           Inventory: This is keeping track of stock of materials needed for work at any point in time for the smooth operation of the business.

vi)         Materials: These are items used directly as part of the product being produced.

vii)       Production: Process of producing and manufactured goods.

viii)     Planning: Is an act of selecting from relevant set of options.

ix)         Control: This is a process of unifying the effort of selection and department in an organization of each section.

.



TYPE IN YOUR TOPIC OR KEYWORD AND CLICK SEARCH:

HOW TO GET YOUR COMPLETE PROJECT MATERIAL INSTANTLY

  • * Select 3 free project topics of your choice from your Department

    * Submit the 3 project topics to your Supervisor for his or her Approval

    * Call our 24/7 customer service desk or WhatsApp Chat# (+234) 0803-766-4978 and get your project topics and complete material instantly.

    * You can also send an Email to [email protected]

    * All project materials on this website are well researched by professionals with high level of professionalism.


TESTIMONIES FROM OUR CLIENTS

Please feel free to carefully review some written and captured responses from our satisfied clients.


  • Debby Henry George, Massachusetts Institute of Technology (MIT), Cambridge, USA.

    "Exceptionally outstanding. Highly recommend for all who wish to have effective and excellent project defence. Easily Accessable, Affordable, Effective and effective."

  • Hilary Yusuf, United States International University Africa, Nairobi, Kenya.

    "I saw this website on facebook page and I did not even bother since I was in a hurry to complete my project. But I am totally amazed that when I visited the website and saw the topic I was looking for and I decided to give a try and now I have received it within an hour after ordering the material. Am grateful guys!"

  • Debby Henry George, Massachusetts Institute of Technology (MIT), Cambridge, USA.

    "Researchwap.net is a website I recommend to all student and researchers within and outside the country. The web owners are doing great job and I appreciate them for that. Once again, thank you very much "researchwap.net" and God bless you and your business! ."

  • Lamilare Valentine, Kwame Nkrumah University, Kumasi, Ghana.

    "Great User Experience, Nice flows and Superb functionalities.The app is indeed a great tech innovation for greasing the wheels of final year, research and other pedagogical related project works. A trial would definitely convince you."

  • Sampson, University of Nigeria, Nsukka.

    "I love what you guys are doing, your material guided me well through my research. Thank you for helping me achieve academic success."

  • Cynthia, Akwa Ibom State University .

    "researchwap.com is God-sent! I got good grades in my seminar and project with the help of your service, thank you soooooo much."

  • Elizabeth, Obafemi Awolowo University

    "Sorry, it was in my spam folder all along, I should have looked it up properly first. Please keep up the good work, your team is quite commited. Am grateful...I will certainly refer my friends too."

  • Ali Olanrewaju, Lagos State University.

    "Am happy the defense went well, thanks to your articles. I may not be able to express how grateful I am for all your assistance, but on my honour, I owe you guys a good number of referrals. Thank you once again."

  • Willie Ekereobong, University of Port Harcourt.

    "My Dear Researchwap, initially I never believed one can actually do honest business transactions with Nigerians online until i stumbled into your website. You have broken a new legacy of record as far as am concerned. Keep up the good work!"

  • Theressa, Igbinedion University.

    "WOW, SO IT'S TRUE??!! I can't believe I got this quality work for just 5k...I thought it was scam ooo. I wouldn't mind if it goes for over 5k, its worth it. Thank you!"

  • Joseph, Abia state Polytechnic.

    "I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much researchwap.com, infact, I owe my graduating well today to you guys...."

  • Christiana, Landmark University .
    Christiana, Landmark University .

    "My friend told me about ResearchWap website, I doubted her until I saw her receive her full project in less than 15 miniutes, I tried mine too and got it same, right now, am telling everyone in my school about researchwap.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work"

  • Musa, Federal University of Technology Minna

    "I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!."

  • Ali Obafemi, Ibrahim Badamasi Babangida University, Niger State.

    "I was scared at first when I saw your website but I decided to risk my last 5k and surprisingly I got my complete project in my email box instantly. This is so nice!!!."


  • To contribute to our success story, send us a feedback or please kindly call 2348037664978.
    Then your comment and contact will be published here also with your consent.
    Thank you for choosing researchwap.com.

FREQUENTLY ASKED QUESTIONS

  • 1. How can I get the complete project if I order?

    AFTER FOLLOWING THE PAYMENT PROCEDURES HERE, AND WE RECEIVE YOUR DETAILS AS SMS ON 08037664978 or as mail to [email protected], THE MATERIAL WILL BE ATTACHED AND MAILED TO YOUR EMAIL ADDRESS WITHIN 30 MINUTES, AND A NOTIFICATION OF THE DELIVERY WILL BE SENT TO YOUR PHONE NUMBER.

    2. How will my payment be confirmed?

    FOLLOW THE PAYMENT INSTRUCTIONS FOUND ON THE PAYMENTS PAGE. NOTE: Payment information is required for Payment Confirmation.

    3. One of your topics suites my project, but the case study is different. What step should I take?

    Students are always advised to use our materials as guide. However, if you have a different case study, you may need to consult researchwap.com Depending on similarity of the organization/industry (case study) you may modify to, if you wish.

    4. How long does it take to get the complete project?

    Depending on how fast your payment and details is acknowledged by us, you will get the complete project within 30 minutes. However, on a very good day you can still get it within 15 minutes!

    5. Why should I trust this website?

    We are well aware of fraudulent activities (scam) that have been happening on the internet. It is unfortunate, but hopefully declining. However, we wish to re-assure our esteemed clients that we are genuine and our services is authentic, if not, we would not post our account details, email address, phone number or any personal details that could be traceable. Free chapter 1 is always given on the site to prove to you that we got the material. If you are unable to view the free chapter 1 send an email or SMS containing your name, topic, with the subject head "FREE CHAPTER 1" to [email protected] or 08037664978 plus the topic. You will get the free chapter 1 within an hour.

    6. Do you accept ATM payments and Online Transfers?

    Yes. We accept ATM transfers and online payments. FOLLOW THE PAYMENT INSTRUCTIONS FOUND ON THE PAYMENTS PAGE.

    7. Is it a complete research project or just materials?

    Yes it is a complete research project. We send complete project materials (i.e. chapters 1-5, full references, and questionnaires/secondary data to your email address after payment confirmation.

    8. How can I pay Online with my ATM card?

    1. Visit an ATM

    2. Insert your card

    3. Select Quickteller

    4. Select "Pay bills"

    5. Choose your account type

    6. Select "Others"

    7. Enter 322222 as the payment code

    8. Enter your phone number as "Customer Reference"

    9. Accept the N1.00 amount displayed

    10. Follow prompts to complete the transaction

    9. How will I receive a software?

    A link to download the software will always be on the first page of the material.

    10. I have a fresh topic that is not on your site. How do I go about it?

    We have professional writers in management sciences, computer science and social sciences. If you have a fresh topic, just click this hire a writer link, fill the form, submit the details and one of our writers will contact you shortly.


PROJECT DETAILS

PAGES: 75
FORMAT: MS WORD
Chapters: 1-5
PRICE: ₦ 5,000.00




TYPE TOPIC OR KEYWORD AND CLICK SEARCH: