ABSTRACT

This research work examined the appraisal of inventory control in a manufacturing company of a case study m seven­-bottling company PLC, Lagos.

The finding after the questionnaire were administered to the staff of seven up- bottling company PLC specifically accounts and warehousing department, showed that effective inventory control would not minimize total inventory costs in a manufacturing company and high inventory costs would not lead to a reduction in the profit of a manufacturing company.

However, solution and recommendations were proffered to the above identified problems to ensure a proper appraisal of inventory control in a manufacturing company in seven up-bottling company PLC, Lagos.

TABLE OF CONTENTS

CHAPTER ONE

1.0    Introduction 

1.1    Background to the Study 

1.2    Statement of Problem 

1.3    Objectives of the Study 

1.4    Research Questions 

1.5   Statement of Research Hypothesis 

1.6    Significance of the Study 

1.7    Scope of the Limitations of the study 

1.8    Historical Background of Seven-up Bottling Company

1.9    Definition of Key Terms

CHAPTER TWO - Literature Review

2.0    Introduction 

2.1    Meaning of Inventory Management 

2.1    Control 

2.2    Inventory Record Keeping Procedures 

2.2.1 Bin Card

2.2.2 Materials Requisition Note

2.2.3 Materials Returned Note

2.2.4 Materials Transfer Note

2.3    Inventory Control Method

2.3.1 Perpetual Inventory Method

2.3.2 Periodic Inventory Method

2.3.3 Physical Inspection Inventory

2.3.4 Just-In-Time (JIT)

2.4    Inventory Costs

2.4.1 Holding Costs

2.4.2 Ordering Costs

2.4.3 Stock-Out Cost

2.4.4 Purchase Costs

2.5 Control of Stocks Levels

2.5.1 Maximum Stock Level

2.6.2 Minimum Stock Level

2.6.3 Re-order Level

2.6 Control Models

2.7.1.1 Economic Order Quantity (EOQ)

2.7    Economic Order Quantity

2.8    Analysis of Inventory Control System in Seven-up Bottling Company PLC.

2.8.1 Ordering Procedure

2.8.2 Receipt Procedure

2.8.3 Recording Procedure

2.8.4 Material Issues

2.8.5 Materials Returns

2.8.6 Stock Taking 

CHAPTER THREE - Research Methodology

3.0    Introduction 

3.1    Research Approach 

3.2    Research Design 

3.3    Restatement of Research Questions 

3.4    Statement of Research Hypothesis 

3.5    Population of Study 

3.6    Sampling Techniques 

3.7    Sample Size 

3.8    Method of Data Collection 

3.8.1 Question Design

3.9    Data Analysis Techniques 

3.9.1 Chi-Square 

3.9.2 Sample Percentage 

3.10 Limitation of Methodology

CHAPTER FOUR - DATA PRESENTATION AND ANALYSIS

4.0    Introduction  

4.1    Presentation and Analysis of Data 

4.1.2 Table 

4.1.3 Table 

4.2    Inventory Cost Reduction 

4.2.1 Table

4.2.3 Table

4.2.4 Table

4.3.1 Table

4.3.2 Table

4.4    Testing of Hypothesis

4.4.1 Chi-Square (x2) Method

4.4.1.1 Hypotheses Indicating Relevant Question in Questionnaire

4.5    Contingency Co-efficient

4.6    Research Finding

CHAPTER FIVE

SUMMARY, CONCLUSION AND RECOMMENDATIONS

5.1   Summary

5.2   Conclusion

5.2   Recommendations

5.2   Bibliography

5.2   Questionnaire

CHAPTER ONE

INTRODUCTION

1.1     BACKGROUND OF THE STUDY: 

In the real sense of economic development, the efficiency and effectiveness of a nation's economy rests viably on its ability to meet with the demands of the populace of such an economy.

In order words, the effectiveness of an economic is vested on the manufacturing sector. This is because, the indices by which the development and progress of an economy is measured is predicated on the goods and services so produced by the out fits in such a sector which could either be consumed locally or be exported for exchange of foreign currency.

Furthermore, the distinguishing factor between productive and unproductive economies lies in the production capacity in relation to the importation capacity which directly affects the economy. However, the afore-mentioned positive outcomes/results are based on the" effective management of the manufacturing industry in terms of its capital (Financial resources) ,inventory, labour (Human resources) among other things, so as not to bring about negative results such as costs resulting from overstocking, loss resulting from capital tied down and loss goodwill as a result of stock outages.

1.2     STATEMENT OF THE PROBLEM

Inventory plays an essential role in any organization. The larger the inventory size, the easier it is to reduce costs of purchasing, manufacturing and shipping as well as provide prompts customer's service. However, a larger inventory stock requires a higher investment of money, higher carrying cost such as storage handling risk of obsolescence and data processing. These costs must be balanced off against any advantages in holding inventory.

The study tends to look at certain problematic issues in manufacturing companies as Seven- Up Bottling Plc it relates to inventory management. Such issues are:

Stock are managed, that the level of stock held are neither more than nor less than requirement for a given season. Most companies fail to appreciate the role inventory management plays in the survival of their business. Accurate information on the cost of stock is necessary for management control of working capital requirement.

1.3     OBJECTIVES OF THE STUDY: 

The main objective of this study is to conduct appraisal of inventory control in a manufacturing company.

Specifically, the study intends to:

Present inventory control system in the selected company. Examine the checks and balances in the inventory control system. Determine the effects of the organization's inventory control system on the operating expenses and profit levels of the organization. Ascertain the effectiveness and efficiency of the organization's inventory control system. Make suggestions for improvement to bring about further enhancement of efficiency in the company's inventory so as to improve the overall performance.

1.4            RESEARCH QUESTIONS

Will effective inventory control minimize total inventory cost in a manufacturing company? Will high inventory control lead to reduction in the profit of manufacturing company? Will effective inventory control prevent frequent stock out in a manufacturing company? What are the sources and quality of raw materials that are available to seven up Bottling Company PIc? How long does it take to procure the raw materials?

vi. What storage techniques do the organizations use in storing their raw materials?

vii. Identify the inventory management practices and policies that are being used by the organization?

viii. What are the inventory management problems of the organization?

1.5     STATEMENT OF RESEARCH HYPOTHESIS

For the purpose of this study, the hypotheses available are as follows;

Ho: Effective inventory control would not minimize total inventory cost in a manufacturing company.

Hi: Effective inventory control would minimize total inventory cost in a manufacturing company.

ii.     Ho: High inventory cost would not lead to a reduction in the profit of a manufacturing company.

Hi: High inventory cost would lead to a reduction in the profit of a manufacturing company.

1.6     SIGNIFICANCE OF THE STUDY: 

Inventory is an essential tool in any manufacturing organization. It constitutes a large proportion of the total operating cost and has direct effect on operational smoothness and profit level of an organization.

It is hoped that, this study would provide useful information that will enhance management ability to carry adequate inventory at a minimized cost.

Also, it will serve as a reference point for future researchers who wish to probe further into efficient management of inventory in the manufacturing sector of the economy.

1.7     SCOPE AND THE LIMITATIONS OF THE STUDY:

This research intends to cover various processes involved in controlling and managing inventory in Seven-Up Bottling Company.

1.8     HISTORICAL BACKGROUND OF SEVEN-UP BOTTING COMPANY NIG. PLC

Seven-Up Bottling Company Nig. Plc was incorporated as a private limited liability company on the 25th day of June, 1959 the company was until 1979 wholly owned by the El-khail family. It was converted to a public limited liability company on the 27th of December, 1978 and listed on the main board of the Nigerian Stock Exchange in 1985.

The El-Khail was franchise for Nigeria by Seven-Up International Plc, under which it is entitled to bottle and market Seven-Up (7-up), the world's leading lime and lemon soft drink. In its attempts to widen its product range, the company obtained franchise for Nigeria in 1966 from crush international (USA) Inc; under which it is entitled to bottle and market all "crush" flavor predominantly "orange crush". The franchise was however sold to Nigerian Breweries PIc in 1995.

In its bid to achieve a "Mega Bottler" status the company further acquired three franchise for Nigeria in 1989 from Pepsi-Cola International under which it is entitled to bottle and market Pepsi (Cola flavor), Mirinda (Orange flavor) and Teem (Lemonade flavor).

The company was launched in 1st of October, 1960, the day Nigeria obtained her independence. The first bottle of 7 -up was rolled out at Ijora the same day.

In order to ensure availability of its product throughout the nation, six additional plants were established at Ibadan in 1980, Kano in 1985, Kaduna in 1988, Aba in 1989, Ilorin in 1989 and Benin in 1993.

Ijora plant was however relocated to Ikeja in 1981 because of the down turn in the economy arising from political and economic crisis, the Ilorin and Benin plants were closed down in 1994. Benin plant was later re-opened in 1986. Apart from the plants, a large network of depot was spread all over the country to ensure constant supply of brands all over the country. At present, the company has thirty two depots.

The company under the management of Faysal El-Khalil in an attempt to increase sales eliminated wasteful expenditure and turned losses into profit. . He also introduced many thrilling promotion packages such as money shower in 1987, 7-up express in 1992 and 7-up Hi-life in 1994. This marketing strategy was part of the short-term plan to reward customers and attract them to 7 -up products. The strategy yield huge returns to company at a very high cost.

However, consumers who built great expectation and did not win became frustrated and began to challenge the credibility of the company. This was largely due to the inability of consumers to estimate the probabilities of winning. As they become more educated on the realities, the exaggerated view of what was possible to win sometime turn into exasperation.

It also woke up the sleeping giant-Nigerian Bottling Company Plc, bottler of Coke from a deep slumber.

The management of company has since then adopted various strategies that can stand the test of time in order to ensure that the success of the aggressive sales promotion which has made the company's product a household to name would not be lost.

Some of the strategies currently put in place are repositioning its products, rationalization exercise and cost reduction techniques (including effective inventory control).

1.9 DEFINITION OF KEY TERMS

Carrying or Holding Cost: This 1S the cost of keeping, carrying or maintaining inventory. It is usually expressed as a percentage of naira value of inventory per unit of time. The major components are insurance cost, interest charges, property tax and storage cost and cost of deterioration, obsolescence, spoilage, pilferage and depreciation.

Economic Order Quantity (EOQ): The economic order quantity is the amount of a product, which should be purchased or manufactured at one time in order to minimize the total cost involved.

Lead Time: The time lag between placing an order and the delivery of the order. It may be constant or variable.

Inventory Catalogue: A book that identifies all materials of inventory carried by name, manufacturer's part number, cross indexed by user's identification number if necessary and classified for indexing purpose.

Maximum Inventory: That level of inventory beyond which inventory must not rise. It is the sum total of the re-order end order quantity less the minimum anticipated usage during the lead time.

Minimum Inventory: That level of inventory below which inventory must not fall. It is the difference between the re­order and the average for the average usage for the average lead time.

Ordering Cost: The cost of generating and processing and order and its related paper work, It may include the cost of telephone calls, postages, stationeries etc.

Over Stock Cost: The cost of carrying more than the required inventory that is the cost of over stocking.

Re-order Level: The inventory level at which an order for replenishment is placed.

Re-Order Quantity: The quantity ordered each time a replenishment order is placed.

Set-Up Cost: The out of pocket costs associated with machine set-up that would increase with the number of set­up.

Stock-out Cost: The marginal profit lost on each items demanded but not immediately available in stocks or costs resulting from failures to have sufficient goods on hand to fill or satisfy orders.

Inventory Policy: It is a set of rules which determine how and when certain decisions concerning the holding of stock should be made.

.



TYPE IN YOUR TOPIC OR KEYWORD AND CLICK SEARCH:

HOW TO GET YOUR COMPLETE PROJECT MATERIAL INSTANTLY

  • * Select 3 free project topics of your choice from your Department

    * Submit the 3 project topics to your Supervisor for his or her Approval

    * Call our 24/7 customer service desk or WhatsApp Chat# (+234) 0803-766-4978 and get your project topics and complete material instantly.

    * You can also send an Email to [email protected]

    * All project materials on this website are well researched by professionals with high level of professionalism.


TESTIMONIES FROM OUR CLIENTS

Please feel free to carefully review some written and captured responses from our satisfied clients.


  • Debby Henry George, Massachusetts Institute of Technology (MIT), Cambridge, USA.

    "Exceptionally outstanding. Highly recommend for all who wish to have effective and excellent project defence. Easily Accessable, Affordable, Effective and effective."

  • Hilary Yusuf, United States International University Africa, Nairobi, Kenya.

    "I saw this website on facebook page and I did not even bother since I was in a hurry to complete my project. But I am totally amazed that when I visited the website and saw the topic I was looking for and I decided to give a try and now I have received it within an hour after ordering the material. Am grateful guys!"

  • Debby Henry George, Massachusetts Institute of Technology (MIT), Cambridge, USA.

    "Researchwap.net is a website I recommend to all student and researchers within and outside the country. The web owners are doing great job and I appreciate them for that. Once again, thank you very much "researchwap.net" and God bless you and your business! ."

  • Lamilare Valentine, Kwame Nkrumah University, Kumasi, Ghana.

    "Great User Experience, Nice flows and Superb functionalities.The app is indeed a great tech innovation for greasing the wheels of final year, research and other pedagogical related project works. A trial would definitely convince you."

  • Sampson, University of Nigeria, Nsukka.

    "I love what you guys are doing, your material guided me well through my research. Thank you for helping me achieve academic success."

  • Cynthia, Akwa Ibom State University .

    "researchwap.com is God-sent! I got good grades in my seminar and project with the help of your service, thank you soooooo much."

  • Elizabeth, Obafemi Awolowo University

    "Sorry, it was in my spam folder all along, I should have looked it up properly first. Please keep up the good work, your team is quite commited. Am grateful...I will certainly refer my friends too."

  • Ali Olanrewaju, Lagos State University.

    "Am happy the defense went well, thanks to your articles. I may not be able to express how grateful I am for all your assistance, but on my honour, I owe you guys a good number of referrals. Thank you once again."

  • Willie Ekereobong, University of Port Harcourt.

    "My Dear Researchwap, initially I never believed one can actually do honest business transactions with Nigerians online until i stumbled into your website. You have broken a new legacy of record as far as am concerned. Keep up the good work!"

  • Theressa, Igbinedion University.

    "WOW, SO IT'S TRUE??!! I can't believe I got this quality work for just 5k...I thought it was scam ooo. I wouldn't mind if it goes for over 5k, its worth it. Thank you!"

  • Joseph, Abia state Polytechnic.

    "I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much researchwap.com, infact, I owe my graduating well today to you guys...."

  • Christiana, Landmark University .
    Christiana, Landmark University .

    "My friend told me about ResearchWap website, I doubted her until I saw her receive her full project in less than 15 miniutes, I tried mine too and got it same, right now, am telling everyone in my school about researchwap.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work"

  • Musa, Federal University of Technology Minna

    "I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!."

  • Ali Obafemi, Ibrahim Badamasi Babangida University, Niger State.

    "I was scared at first when I saw your website but I decided to risk my last 5k and surprisingly I got my complete project in my email box instantly. This is so nice!!!."


  • To contribute to our success story, send us a feedback or please kindly call 2348037664978.
    Then your comment and contact will be published here also with your consent.
    Thank you for choosing researchwap.com.

FREQUENTLY ASKED QUESTIONS

  • 1. How can I get the complete project if I order?

    AFTER FOLLOWING THE PAYMENT PROCEDURES HERE, AND WE RECEIVE YOUR DETAILS AS SMS ON 08037664978 or as mail to [email protected], THE MATERIAL WILL BE ATTACHED AND MAILED TO YOUR EMAIL ADDRESS WITHIN 30 MINUTES, AND A NOTIFICATION OF THE DELIVERY WILL BE SENT TO YOUR PHONE NUMBER.

    2. How will my payment be confirmed?

    FOLLOW THE PAYMENT INSTRUCTIONS FOUND ON THE PAYMENTS PAGE. NOTE: Payment information is required for Payment Confirmation.

    3. One of your topics suites my project, but the case study is different. What step should I take?

    Students are always advised to use our materials as guide. However, if you have a different case study, you may need to consult researchwap.com Depending on similarity of the organization/industry (case study) you may modify to, if you wish.

    4. How long does it take to get the complete project?

    Depending on how fast your payment and details is acknowledged by us, you will get the complete project within 30 minutes. However, on a very good day you can still get it within 15 minutes!

    5. Why should I trust this website?

    We are well aware of fraudulent activities (scam) that have been happening on the internet. It is unfortunate, but hopefully declining. However, we wish to re-assure our esteemed clients that we are genuine and our services is authentic, if not, we would not post our account details, email address, phone number or any personal details that could be traceable. Free chapter 1 is always given on the site to prove to you that we got the material. If you are unable to view the free chapter 1 send an email or SMS containing your name, topic, with the subject head "FREE CHAPTER 1" to [email protected] or 08037664978 plus the topic. You will get the free chapter 1 within an hour.

    6. Do you accept ATM payments and Online Transfers?

    Yes. We accept ATM transfers and online payments. FOLLOW THE PAYMENT INSTRUCTIONS FOUND ON THE PAYMENTS PAGE.

    7. Is it a complete research project or just materials?

    Yes it is a complete research project. We send complete project materials (i.e. chapters 1-5, full references, and questionnaires/secondary data to your email address after payment confirmation.

    8. How can I pay Online with my ATM card?

    1. Visit an ATM

    2. Insert your card

    3. Select Quickteller

    4. Select "Pay bills"

    5. Choose your account type

    6. Select "Others"

    7. Enter 322222 as the payment code

    8. Enter your phone number as "Customer Reference"

    9. Accept the N1.00 amount displayed

    10. Follow prompts to complete the transaction

    9. How will I receive a software?

    A link to download the software will always be on the first page of the material.

    10. I have a fresh topic that is not on your site. How do I go about it?

    We have professional writers in management sciences, computer science and social sciences. If you have a fresh topic, just click this hire a writer link, fill the form, submit the details and one of our writers will contact you shortly.


PROJECT DETAILS

PAGES: 56
FORMAT: MS WORD
Chapters: 1-5
PRICE: ₦ 5,000.00




TYPE TOPIC OR KEYWORD AND CLICK SEARCH: