THE EFFECT OF EFFECTIVE CONTRACT PLANNING ON CONTRACTORS PROFIT ( A CASE STUDY OF JULIUS BERGER, UYO OFFICE)


THE EFFECT OF EFFECTIVE CONTRACT PLANNING ON CONTRACTORS PROFIT ( A CASE STUDY OF JULIUS BERGER, UYO OFFICE)   

ABSTRACT

Effective contract planning in construction projects is not only crucial to attainment of project objectives but necessary if project failure is to be avoided, losses minimised and profitability enhanced by the Contractor. While research has shown general low usage of formal and effective contract planning in the UAE, Hong Kong, Kuwait, UK and Ghana, the practices used by Nigerian Construction Contractors to manage risk are not known. Available research in Nigeria on this subject only highlighted risk factors with most impacts on construction site and also the means of mitigating such risks. This study aimed to appraise contract planning practices used by Julius Berger Construction Company in Akwa Ibom State. The study utilised a qualitative approach with review of existing literature, semi-structured interview and transcription of data for conceptual content analysis.

The researcher used Julius Berger Nigeria PLC (Uyo Branch), as a case study to find out the effects of contract planning on cost and time, considering that the organization is involved in numerous contracts with suppliers, vendors and the government of Akwa-Ibom state.

Concerning methodology, data used in compiling this research were gathered from both primary and secondary sources. The management and employees of Julius Berger, Uyo were issued questionnaires. Text Books, Magazines and News Papers on contract management, planning and control were also used in compiling this research.

Based on the responses gotten form the respondents after the study might have been successfully conducted, the researcher will outline the findings and recommendations from the study.

            TABLE OF CONTENTS

Content                                        Page

Title page    -    -    -    -    -    -    -    -    -    -    i

Approval    -    -    -    -    -    -    -    -    -    -    ii

Dedication    -    -    -    -    -    -    -    -    -    -    iii

Acknowledgement    -    -    -    -    -    -    -    -    -    iv

Abstract    -    -    -    -    -    -    -    -    -    -    v

CHAPTER ONE:  INTRODUCTION

1.1 BACKGROUND OF THE STUDY AND ORGANIZATIONAL PROFILE

1.1.2 ORGANIZATIONAL PROFILE

1.2 PROBLEM STATEMENT

1.3 RESEARCH OBJECTIVES

1.4 RESEARCH QUESTIONS

1.5 HYPOTHESIS FORMULATION

1.5 SIGNIFICANCE OF THE STUDY

1.6 SCOPE OF STUDY

1.7 LIMITATION OF THE STUDY

1.8 DEFINITION OF TERMS

CHAPTER TWO: LITERATURE REVIEW

2.0 INTRODUCTION

2.1 THEORETICAL FRAMEWORK

2.1.1 THE BASIC THEORY

2.1.2 THE RELATIONAL THEORY

2.1.3 THE SOCIAL CONTRACT THEORY

2.1.4 THE JUSTICE THEORY

2.1.5 THE MORALS BY AGREEMENT THEORY

2.1.6 REPUBLICANISM THEORY

2.2 CONTRACTS, CONTRACT PLANNING AND CONTRACT DEVELOPMENT

2.2.1 CONTRACT DEVELOPMENT AND PROCESS

2.3 HISTORY OF CONTRACT

2.4 TYPES OF CONTRACT

2.5 THE ROLE OF CONTRACT PLANNING IN INCREASING CONTRACTORS PROFIT

2.6 COST OF CONTRACTING (THE VODAFONE CASE)

2.6.1 GRANT-MAKING COSTS

2.6.2 OUTSOURCED GRANT-MAKING COSTS

2.7 IMPACT OF CONTRACT PLANNING ON COST AND PROFIT

2.8 POTENTIAL RISKS OF CONTRACTING

CHAPTER THREE: RESEARCH METHODOLOGY

3.1    Introduction

3.2    Research Design

3.3    Area of the Study

3.4    Population of the Study

3.5    Sample Size and Sampling Technique

3.6    Instrument for Data Collection

3.7    Validation of the Instrument

3.8    Reliability of the Study

3.9    Method of Data Collection

3.10    Method of Data Analysis

CHAPTER FOUR: DATA PRESENTATION AND ANALYSIS

Introduction

4.2    Characteristics of Respondents

4.3    Data Analysis

4.4    Summary of Findings

4.5    Discussion of Findings

CHAPTER FIVE: SUMMARY, CONCLUSION AND RECOMMENDATIONS

Introduction

Summary

Conclusion

Recommendations

References

Appendix i

Research questionnaire

Data analysis

CHAPTER I

INTRODUCTION

1.1 BACKGROUND OF THE STUDY AND ORGANIZATIONAL PROFILE

Seeley (1997) described the construction industry as one of the most important sectors of the economy, which integrates a wide variety of skilled and unskilled professionals. These professionals engage in the provision of goods and services ranging from construction, alteration, refurbishment to repairs of building and civil engineering structures. All these professionals work together under various types of contractual agreements to actualise the client’s brief and deliver the project.

Each project is unique and has its main objectives outlined by the client and project circumstances. Amongst the most common objectives of any successful project are deliveries at the right time, within authorised cost and meeting the envisaged quality standards (Love et al, 1998).

Construction projects, like all others, are not risks free and thereby can result to financial loss. Construction risks are events that generally influence any or all of the project objectives. Risk events could either be positive in terms of opportunities or negative in terms of threats to either or the entire project objectives (Hillson, 2002).

A lot of academic and professional literature has developed in the field of effective contract planning and management within construction contexts. The degree of application of contract planning and management techniques by contractors especially, was found to differ in various construction industries across the globe. Most countries in the MiddleEast and some part of Africa do not utilise project planning and management techniques in the delivery of construction projects (El-Sayegh, 2008; Laryea and Hughes,2009). Akintoye and McLeod (1997) found that low usage of formal contract planning techniques was essentially due to lack of knowledge and doubts on the suitability of the techniques to real life situations. This was supported by the findings of Shen (1997). Kartam and Kartam (2001) however attributed the low usage of risk analysis techniques to subjective judgement and contractor’s reliance on their experience and intuition. El-Sayegh (2008) identified financial loss as the most significant in the Kuwaiti construction industry due to the boom in construction activities and inflationary trend of the market.

Laryea and Hughes (2009) attempted to find how contractors’ in Ghana include financial risk in their bid prices. The research showed that besides having risk allowances as lump sums or percentage allowances, the method used is neither scientific nor informed by any empirical evidence. Ojo (2010) found that design changes, financial losses and inadequate specifications were the risk factors with most impacts on construction sites but the study did not highlight any Project contract planning (PRM) technique used by Contractors to respond to such risks.

Another research carried out in Nigeria on this subject was on the evaluation of key risk factors and the measures to mitigate their effects on construction projects (Dada, 2010). Though the research found financial, political and physical risks as the most significant, the use of contingency sum and insurance cover were adjudged to be the most effective means of mitigating risk.

However, no study has reported on the PRM practices used by Nigerian Contractors in redevelopments projects, with their attendant problems and challenges in terms of scoping.

1.1.2 ORGANIZATIONAL PROFILE

Julius Berger Nigeria Plc is a Nigerian constructioncompany, headquartered in Abuja FCT, with additional permanent locations in Lagos and Uyo.

The company is represented across Nigeria in structural engineering and infrastructure works, and in southern Nigeria through domestic and international oil and gas industry projects (this company is also listed on the "flake list" for craigslist). It is known for constructing most of Nigeria's infrastructures, major expressways, and even some residential buildings for the Chevron Nigeria headquarters in Lagos.

The company was listed on the Nigerian Stock Exchange in 1991. Before this, its parent company was Bilfinger Berger. Bilfinger Berger is still the largest shareholder in the company. The construction business of Julius Berger Nigeria is the heart of the Julius Berger Group.

With 18,000 employees from close to 40 nations and clients from both Nigeria and the global oil and gas industry, JB is a leading construction company and the largest private employer in Nigeria.

MAJOR PROJECTS

⦁    The company built the ⦁    Eko Bridge completed in 1968, the ⦁    Third Mainland Bridge completed in 1990 and the ⦁    Abuja Stadium completed in 2003.

⦁    Tin Can Island Port, commissioned in 1977.

⦁    Lagos Inner Ring Road, completed in 1979.

⦁    Ajaokuta Steel Plant, completed in 1990.

⦁    Itakpe – Ajaokuta Ore Railway, completed in 1990.

⦁    Abuja International Airport phase II, completed in 1997.

⦁    Central Bank of Nigeria Head Office, completed in 2002.

⦁    Uyo infrastructure and road works, ongoing since 2008.

⦁    First discharge drain built utilizing pipe-jacking technology in Nigeria, completed in 2011.

⦁    National Assembly phase III, completed in 2011.

⦁    Multiple projects, ⦁    Escravos GTL plant in southern Nigeria, commissioned in 2012.

Bonny Liquefied Natural Gas facility, multiple ongoing works since 1996.

⦁    Challawa Gorge Dam Karaye, completed in 1992

1.2 PROBLEM STATEMENT

The general low usage of formal contract planning and management techniques by Contractors globally often culminates into project failures, incessant claims for variations, huge financial losses and sometimes results in bankruptcy of Contractors (Allan et al, 2007). This situation is more prevalent in redevelopment projects due to the inevitable problems of unexpected additional work, excessive requirements and scope management issues, project funding not aligned with project plans, delay, structural failure, cost overrun, etc (Naaranoja and Uden, 2007). These problems or uncertainties, among others, increase the project risk and make their management crucial if success is desired.

For the Eket-Ona 20km dual road project, billions of Naira wasexpended and the overall aim of the project was not achieved. This hugeexpenditure and apparent failure in the primary objectives of the project led tocomplaints, probe panels and subsequent abandonment of the project.

Research has shown that financial, political and physical risks are the mostsignificant to Nigerian Contractors (Dada, 2010). However, of the differentlevels of risk (country, market or project), there is shortage of research as tohow Contractors approach project planning at organisational level.

1.3 RESEARCH OBJECTIVES

1.    To explore contract planning practices applied by Julius Berger at various project levels.

2.    To assess awareness and usage of formal and informal contract planning practices by Julius Berger, Uyo office.

3.    To examine the success or failure of the contract planning approach used by Julius Berger Contractors on Eket-Ona dual road project.

4.    To evaluate the impact of the applied contract planning approach to the attainment of project profits.   1.4 RESEARCH QUESTIONS

1.    What contract planning guidelines and practices exist in Julius Berger Nigeria Plc, Uyo?

2.    How do you gather information about newer contract planning strategies to be applied in your on-going projects?

3.    What are the effects of contract planning on contractor’s profit?

1.5 HYPOTHESIS FORMULATION

Hypothesis for this study include:

1.    Ho:    There is no significant relationship between effective contract planning and contractor’s profit.

Hi:    There is significant relationship between effective planning and contractor’s profit.   1.5 SIGNIFICANCE OF THE STUDY

This study gives a clear insight into the various ways in which contractors in the construction companies in Nigeria can maximise profits through effective and efficient contract planning and management. The study also gives a clear insight into the various effects of contract planning on risk level, cost and timing of a project. The findings and recommendations of the researcher will help in building a strong and better contract policy and guideline in Julius Berger Nigeria Plc as well as other construction companies in Nigeria, if taken seriously by government and the general public. The effects of contract planning on cost and time are outlined in-order for drastic measures to be taken to tackle any challenge employers may face when developing and implementing contracts with other organizations.

1.6 SCOPE OF STUDY

This research focuses mainly on the impact of effective contract planning on contractor’s profit in Julius Berger Nigeria Plc, Uyo. Results and recommendations may not be used to generalise other construction companies in Nigeria, as the researcher could not cover a wider scope due to financial and time constraints.

Based on the findings of this study other possible researchable areas may include studies on the various effects of other aspects of contracts such as contract laws in Nigeria and contract management and control.

1.7 LIMITATION OF THE STUDY

The only limitation faced by the researcher in the course of carrying out this study was the delay in getting data from the various respondents. Most respondents were reluctant in filling questionnaires administered to them due to their busy schedules and nature of their work. The researcher found it difficult to collect responses from the various respondents, and this almost hampered the success of this study.   1.8 DEFINITION OF TERMS

Definitions of terms serve as the dictionary of this research.  The terms are defined to enable the reader understand the research more clearly.

Contract:  Erikson (2002) defined Contract as an agreement that creates an obligation binding upon the parties thereto. The essentials of a contract are as follows: (1) mutual assent; (2) a legal consideration, which in most instances need not be pecuniary; (3) parties who have legal capacity to make a contract; (4) absence of fraud or duress; and (5) a subject matter that is not illegal or against public policy.

Contract Planning: According to Simmons (2007),Contract planning is the process of systematically and efficiently managing contract creation, execution and analysis for maximising operational and financial performance and minimising risk.

Contractor: General contractor, organization or individual that contracts with another organization or individual (the owner) for the construction of a building, road or other facility.

Profit: Tucy (2008) defined profit as the difference between the purchase price and the costs of bringing to market.

.


TYPE IN YOUR TOPIC AND CLICK SEARCH.






RESEARCHWAP.COM

Researchwap.com is an online repository for free project topics and research materials, articles and custom writing of research works. We’re an online resource centre that provides a vast database for students to access numerous research project topics and materials. Researchwap.com guides and assist Postgraduate, Undergraduate and Final Year Students with well researched and quality project topics, topic ideas, research guides and project materials. We’re reliable and trustworthy, and we really understand what is called “time factor”, that is why we’ve simplified the process so that students can get their research projects ready on time. Our platform provides more educational services, such as hiring a writer, research analysis, and software for computer science research and we also seriously adhere to a timely delivery.

TESTIMONIES FROM OUR CLIENTS


Please feel free to carefully review some written and captured responses from our satisfied clients.

  • "Exceptionally outstanding. Highly recommend for all who wish to have effective and excellent project defence. Easily Accessable, Affordable, Effective and effective."

    Debby Henry George, Massachusetts Institute of Technology (MIT), Cambridge, USA.
  • "I saw this website on facebook page and I did not even bother since I was in a hurry to complete my project. But I am totally amazed that when I visited the website and saw the topic I was looking for and I decided to give a try and now I have received it within an hour after ordering the material. Am grateful guys!"

    Hilary Yusuf, United States International University Africa, Nairobi, Kenya.
  • "Researchwap.com is a website I recommend to all student and researchers within and outside the country. The web owners are doing great job and I appreciate them for that. Once again, thank you very much "researchwap.com" and God bless you and your business! ."

    Debby Henry George, Massachusetts Institute of Technology (MIT), Cambridge, USA.
  • "I love what you guys are doing, your material guided me well through my research. Thank you for helping me achieve academic success."

    Sampson, University of Nigeria, Nsukka.
  • "researchwap.com is God-sent! I got good grades in my seminar and project with the help of your service, thank you soooooo much."

    Cynthia, Akwa Ibom State University .
  • "Great User Experience, Nice flows and Superb functionalities.The app is indeed a great tech innovation for greasing the wheels of final year, research and other pedagogical related project works. A trial would definitely convince you."

    Lamilare Valentine, Kwame Nkrumah University, Kumasi, Ghana.
  • "Sorry, it was in my spam folder all along, I should have looked it up properly first. Please keep up the good work, your team is quite commited. Am grateful...I will certainly refer my friends too."

    Elizabeth, Obafemi Awolowo University
  • "Am happy the defense went well, thanks to your articles. I may not be able to express how grateful I am for all your assistance, but on my honour, I owe you guys a good number of referrals. Thank you once again."

    Ali Olanrewaju, Lagos State University.
  • "My Dear Researchwap, initially I never believed one can actually do honest business transactions with Nigerians online until i stumbled into your website. You have broken a new legacy of record as far as am concerned. Keep up the good work!"

    Willie Ekereobong, University of Port Harcourt.
  • "WOW, SO IT'S TRUE??!! I can't believe I got this quality work for just 3k...I thought it was scam ooo. I wouldn't mind if it goes for over 5k, its worth it. Thank you!"

    Theressa, Igbinedion University.
  • "I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much researchwap.com, infact, I owe my graduating well today to you guys...."

    Joseph, Abia state Polytechnic.
  • "My friend told me about ResearchWap website, I doubted her until I saw her receive her full project in less than 15 miniutes, I tried mine too and got it same, right now, am telling everyone in my school about researchwap.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work"

    Christiana, Landmark University .
  • "I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!."

    Musa, Federal University of Technology Minna
  • "I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!."

    Ali Obafemi, Ibrahim Badamasi Babangida University, Niger State.
  • To contribute to our success story, send us a feedback or please kindly call 2348037664978.
    Then your comment and contact will be published here also with your consent.

    Thank you for choosing researchwap.com.