1.1 INTRODUCTION

1.2 BACKGROUND AND ITS OPERATION 

1.3 SIGNIFICANCE

1.4 SCOPE OF STUDY

1.5 AIMS AND OBJECTIVE 

1.6 PROBLEMS AND LIMITATION OF STUDY 

1.7 DEFINITION OF TERMS 

1.8 ABBREVIATION USED

CHAPTER TWO 

2.0 LITERATURE REVIEW

2.1 METHOD OF DATA ANALYSIS 

2.2 TIME SERIES ANALYSIS 

2.3 IMPORTANCE OF TIME SERIES 

2.4 NATURE OF TIME SERIES 

2.5 CHARACTERISTICS OF TIME SERIES 

2.6 TIME SERIES MODELS 

2.7 OTHER COMPONENT OF THE TIME SERIES MODEL 

2.8 AUTO REGRESSIVE MODEL

2.8.1 FIRST ORDER AND SECOND ORDER OF REGRESSIVE MODEL

2.8.2 COMPUTATION OF ESTIMATE 

2.8.3 YULE PROCESS AR(2) PARAMETER PROCESS 

2.8.4 AUTO CORRELATION FUNCTION FOR AR(2)

2.8.5 FOURIER ANALYSIS 

2.8.6 SPECTRUM OF A TIME SERIES 

2.8.7. PERIODIOGRAM

2.8.8 CORRELATIONS

2.8.9 IMPORTANCE OF CORRELATION 

CHAPTER THREE 

METHODOLOGY 

3.0 THEMED OF ESTIMATING TREND 

3.1 LEAST SQUARE METHOD 

3.2 MOVING AVERAGE METHOD 

3.3 SEMI-MOVING AVERAGE METHOD 

3.4 FREE HAND METHOD

3.5 ESTIMATION OF SEASONAL VARIATION

3.6 SIMPLE AVERAGE METHOD

3.7 PERCENTAGE TREND METHOD

3.8 RATIO TO MOVING AVERAGE 

3.9 FORECASTING 

3.9.0 SHORT TERM FORECASTING 

3.9.1 INTERMEDIATE FORECASTING     

3.9.2. LONG TERM FORECASTING 

3.9.4 GENERALIZED TEST OF HYPOTHESIS 

CHAPTER FOUR 

4.1 ANALYSIS OF DATA 

CHAPTER FIVE 

5.1 SUMMARY OF FINDING 

5.2 CONCLUSION 

5.3 RECOMMENDATION 

5.4 BIBLIOGRAPHY

CHAPTER ONE

1.0 INTRODUCTION 

The primary aim of National Electrical Power Authority (NEPA) is in cardinal point which is to generate, transmission, distribution and sales electricity within and outside country. 

National Electric Power Authority NEPA can be regarded as heart beat of the nation economy as the operation of machines use in industries and most household equipment depend on electricity. 

Today National Electric Power Authority (NEPA) meets total maximum energy demand from the total installed capacity of the Authority power station which is 600mw, the terminal power station are strategically located at Egbin, Ijora, Delta Ugheli, Sapele and Afan, while the hydro power station generate are located at Kanji, Jebba and Shoro, the terminal power station generate electricity for exportation into grid system. 

As part of the positive effort of NEPA to ensure the electricity generated reach the appropriate quarters in the next millennium, it has put in place 11,000km of transmission line running across the nation. 

Many researchers had previous carried out research work on NEPA, on some aspect of electricity consumption with related objective. Individual article and study of NEPA, they have put forward many analysis and suggestion basically on consumption, supply and distribution of electricity. 

According to Chief A.O. Osho of AbuleEgba Community in Lagos State, put up a protest on behalf of the community in the daily times of “21st of March 1991” WHY DO WE HAVE INCENSANT POWER FAILURE, Mr. MuyiwaOtunowo (P.R.O) Nepa Lagos South directorable through a booklet title “planning ahead of NEPA” answered the question he said NEPA plans ahead a very much so to meet adequate constant and supply of electricity, the future demand must be known since we can not produce and store electricity. The national electricity as can be done to most of consumer goods or water. 

A journal, “an energy improving generation and distribution” with the dismal state of power supply in the country, it is very necessary that we must continue to explore means to boosting power generation, transmission and distribution, a journal on energy March 25th 1996. Another study is that of Mr. Shuaib I.A. 1985 written on Statistical Analysis on the Consumption of Electricity in Kwara State from 1976 – 1985, he aim in creating a format for planning and forecast future electricity consumption. 

The regression equation showing units of electricity consumption which was consumedImageuse to predict 1986, 1987, though there is an increase in consumption of electricity still the prediction is inconsistent due to lack of variation. 

1.2 NEPA AND ITS OPERATION (BACKGROUND) 

The management of the Nigeria power system is a monopoly vested in the National Electricity Power Authority [NEPA] , its main objective is to generate, transmit and distribute electric power throughout the nation. 

The National Electric Power Authority [NEPA] was established by Decree 24 of April 1972 in an amalgamation of two bodies, the Electricity Co-operation of Nigeria [ECN] and the Niger Dam Authority [NDA] that were healthier to responsible for generating and distributing electricity power, the Nigeria power system consist of total eight (8) power station, five (5) terminal, three (3) hydro with a total installed capacity of 600mw, interconnected over a network of 330kv transmission line. Transmission of bulk power to the major load center are supply with power at 132kv (of which there is a total of 83132kv substation) from where the voltage is still transformed to further low level [33kv, 11kv, 66kv, 3.3kv] for distribution. 

The ECN and NDA later give birth to NEPA, by the virtual of that decree, NEPA was mandated to maintain the efficient co-ordination and economic system of electricity supply for the whole nation. 

The National Electric Power Authority came to Ilorin office was responsible for supply of electricity to the whole of Kwara State. The District office comprises of account department, computer department, marketing department, engineering department, e.t.c. with their respective heads. 

The district office is headed by District Manager and the consumer are classify into three groups, the residential consumer, the commercial consumer, and the industrial consumer. 

1.3 SIGNIFICANCE OF STUDY 

This project is to highlight the uses of statistics and its techniques in analyzing data in respect of electricity, and forecast the future consume two pattern. 

1.4 SCOPE OF THE STUDY 

The study deal with consumption of electricity in Kwara State Ilorin undertaking. The data available is that of units consumed in [KWHX 10] between 1989 – 2003. The data was extracted from account and sales department of NEPA Ilorin Districts office. 

1.5 AIMS AND OBJECTIVE 

i. To identify and fit model for the study and forecast monthly value for it. 

ii. To test the variation with the year 

iii. To test for the average consumption of electricity on monthly basis. 

iv. To analyze time series of monthly power consumption in Kwara State [Ilorin undertaking]. 

1.6 PROBLEM AND LIMITATION OF THE STUDY 

There are many limitation that hinder the extent at which research can carried out one of which is inadequacies of textbook especially relating to the topic. Another problem encountered is the negative attitude of the management of the chosen case study, feeling reluctant to supply accurate record of the authority. 

1.7 DEFINITION OF TERMS 

⦁ Consumer: Any person or corporate body supply with electricity by the NEPA. 

⦁ Residential Domesic Consumer: A consumer who use the premises exclusive as a residence house. 

⦁ Commercial consumer: A consumer who use his premises for any purpose other than exclusively as a residence or as a factory for manufacturing goods. 

⦁ Industrial consumer: A consumer who use it for manufacturing goods e.g. global soap and detergent company. 

1.8 ABBREVIATION USED 

N.E.P.A – National Electricity Power Authority 

E.C.N – Electricity Corporation of Nigeria 

N.D.A – Niger Dam Authority 

M.W. – Mega Watt 

K.V. – Kilo-Volt 

.


TYPE IN YOUR TOPIC AND CLICK SEARCH.






RESEARCHWAP.COM

Researchwap.com is an online repository for free project topics and research materials, articles and custom writing of research works. We’re an online resource centre that provides a vast database for students to access numerous research project topics and materials. Researchwap.com guides and assist Postgraduate, Undergraduate and Final Year Students with well researched and quality project topics, topic ideas, research guides and project materials. We’re reliable and trustworthy, and we really understand what is called “time factor”, that is why we’ve simplified the process so that students can get their research projects ready on time. Our platform provides more educational services, such as hiring a writer, research analysis, and software for computer science research and we also seriously adhere to a timely delivery.

TESTIMONIES FROM OUR CLIENTS


Please feel free to carefully review some written and captured responses from our satisfied clients.

  • "Exceptionally outstanding. Highly recommend for all who wish to have effective and excellent project defence. Easily Accessable, Affordable, Effective and effective."

    Debby Henry George, Massachusetts Institute of Technology (MIT), Cambridge, USA.
  • "I saw this website on facebook page and I did not even bother since I was in a hurry to complete my project. But I am totally amazed that when I visited the website and saw the topic I was looking for and I decided to give a try and now I have received it within an hour after ordering the material. Am grateful guys!"

    Hilary Yusuf, United States International University Africa, Nairobi, Kenya.
  • "Researchwap.com is a website I recommend to all student and researchers within and outside the country. The web owners are doing great job and I appreciate them for that. Once again, thank you very much "researchwap.com" and God bless you and your business! ."

    Debby Henry George, Massachusetts Institute of Technology (MIT), Cambridge, USA.
  • "I love what you guys are doing, your material guided me well through my research. Thank you for helping me achieve academic success."

    Sampson, University of Nigeria, Nsukka.
  • "researchwap.com is God-sent! I got good grades in my seminar and project with the help of your service, thank you soooooo much."

    Cynthia, Akwa Ibom State University .
  • "Great User Experience, Nice flows and Superb functionalities.The app is indeed a great tech innovation for greasing the wheels of final year, research and other pedagogical related project works. A trial would definitely convince you."

    Lamilare Valentine, Kwame Nkrumah University, Kumasi, Ghana.
  • "Sorry, it was in my spam folder all along, I should have looked it up properly first. Please keep up the good work, your team is quite commited. Am grateful...I will certainly refer my friends too."

    Elizabeth, Obafemi Awolowo University
  • "Am happy the defense went well, thanks to your articles. I may not be able to express how grateful I am for all your assistance, but on my honour, I owe you guys a good number of referrals. Thank you once again."

    Ali Olanrewaju, Lagos State University.
  • "My Dear Researchwap, initially I never believed one can actually do honest business transactions with Nigerians online until i stumbled into your website. You have broken a new legacy of record as far as am concerned. Keep up the good work!"

    Willie Ekereobong, University of Port Harcourt.
  • "WOW, SO IT'S TRUE??!! I can't believe I got this quality work for just 3k...I thought it was scam ooo. I wouldn't mind if it goes for over 5k, its worth it. Thank you!"

    Theressa, Igbinedion University.
  • "I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much researchwap.com, infact, I owe my graduating well today to you guys...."

    Joseph, Abia state Polytechnic.
  • "My friend told me about ResearchWap website, I doubted her until I saw her receive her full project in less than 15 miniutes, I tried mine too and got it same, right now, am telling everyone in my school about researchwap.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work"

    Christiana, Landmark University .
  • "I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!."

    Musa, Federal University of Technology Minna
  • "I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!."

    Ali Obafemi, Ibrahim Badamasi Babangida University, Niger State.
  • To contribute to our success story, send us a feedback or please kindly call 2348037664978.
    Then your comment and contact will be published here also with your consent.

    Thank you for choosing researchwap.com.