THE INFLUENCE OF CONTRACT DRAWING ON BUILDING PROJECT


Department Of Building Technology


PAGES: 56
FORMAT: MS WORD
Chapters: 1-5
PRICE: ₦ 5,000.00

THE INFLUENCE OF CONTRACT DRAWING ON BUILDING PROJECT

 CHAPTER ONE

1.0              INTRODUCTION

Working /contract drawing according to Thomas and Marvin (1978), working drawings are defined to be a communication medium whose purpose is to graphically convey the design requirement for a construction project.

They control the design by indicating the construction in considerable detail; if they are sufficiently detailed, a competent builder can construct the project in accordance with the design and without confusion. Nowadays, many building clients are curious of knowing their probable cost of having a particular building before the commencement of the work.

 However, the task of making the cost known to the building client entailed arrays of exercise to be done by the professionals involved, stating from the design stage up to the practical completion of the project, the design stage encompasses various activities, such as, the client brief, site investigation, skeletal design, construction design and finally the contract/working drawings which can be passed to the quantity surveyor and finally issued to the contractor.

These are expected to be the minimum numbers of drawings which give production information showing all relevant information’s from consultant transferred to agreed scale, exchanges details and exploiting the values of three dimensional sketches.

The information is read to gather by the client, the estimator and the site agents. Seely (2008), believed that drawing should show the nature and scope of work to be carried out under the contract. They are to be detailed and comprehensive of bill of quantities. It is also to assist the contractor to accurately price and carry out the work satisfactorily.

Drawings are expected to have description and explanatory notes clearly defined, legible and free from abbreviations amplified figured dimension should be inserted in the drawing to ensure maximum accuracy in taking off quantities and in setting out construction work on site.

Turner (2003), referred to the design and quality of the finished work as a major feature of the contract document. Contract drawings should show the positioning of the building members or a supplementary non-contract document. These contract drawings will include: architectural, structural and services

1.1              STATEMENT OF RESEARCH PROBLEM

It has become a regular occurrence nowadays in which we find the project final cost that will overrun the contract sum originally set in contract document due to negligence in the part of the architect and the building professionals to provide enough drawings and information at both the pre-contract and post contract stage. This has posed so many problems on the neck of many clients, by offsetting their initial monetary budget.

More so, many design practitioners has paid little attention to supply of contract drawings. Rather they belief  in given instruction and description to the contractor on whatever they felt to be changed, added, omitted etc. in the progress of work, putting the essence of contract drawings behind.

Besides, it is obvious that many contract periods has been affected due to late or incomplete contract drawing or probably incomplete information on the contract drawing given to the contractor. This extends the client rental payment on borrowed properties due to late possession of their own building property. The above problems have contributed greatly to the differences between the initial cost (contract sum) and the project final cost caused by the building drawings; To contractor it lead to increment in the project and general overhead and reduces his profit, which to the consultants the running cost increment, stress and reduce the consultant prestige.

1.2              RESEARCH QUESTIONS

From the above statement of problems confronting this research on the impact of contract drawings on project final cost, the following research questions were deduced

What were the effects of the numbers of contract drawings on the final cost of building project? What are the effects of number of contract drawings used on the time overrun of a building project? Does the use of contract drawings have an important impact on the cost of building project?

1.3              AIM AND OBJECTIVES

        1.3.1    AIM

The aim of this research is to study the influence of contract drawing on building project final cost and to recommend solution that will curb the practice by building professionals.

1.3.2   OBJECTIVES

To identify the number of contract drawings used for the procurement of building project? To access the effect of inadequate contract drawings on the final cost of building project. To examine the importance of detailed contract drawings on a building project?

1.4   HYPOTHESIS

 Based on the objective number one (1) and two (2) hypothesis were formulated as follow:

Objective 1

Ho: The number of contract drawings used has no effect on the final cost of a building project.

Hi: The number of contract drawings used has effect on the building project final cost.

Objective 2

Ho: The number of contract drawings used has no effect on the time overrun of building project

Hi: The number of contract drawings used has significant effect on the time overrun of a building project.

1.5  JUSTIFICATION OF STUDY

Oyemade (2002) carried out research on the impact of contract drawings on project final cost, but he failed to emphasis on how the number of contract drawings used affect contract period and the significant of contract drawings in the building industry. The importance of contract drawing is quite obvious in the present building industry. It serves as a convenient medium of communication between the consultant and the contractors, likewise the clients. Drawings are drawn as architectural, structural and services to give whosoever appreciated it the imagination sense of how the building is going to look like, also it would be brought to the mind (practitioners) the likely period of time meant for the execution of such a project. With this, this research work will throw light on the importance of contract drawings, the effect of number of contract drawings used on contract period (time) and also to resist the acceptable hypothesis by Oyemade (2002) with another test to see if it is reliable or not.

1.6   LIMITATION AND SCOPE OF THE STUDY

            This research has been scheduled to cover residential building project in ilorin, Kwara state, by different consultants and contractors. This is to examine how the numbers of contract drawing issued from the pre-contract to post contract drawings in building project execution and how contract drawings affect contract period.

            But this research has been limited to only residential building project executed in ilorin by the government. The reason is that it is very clear to get records of residential buildings by individual clients in ilorin, this is usually possible on the government building project through the help of ministry of housing and urban development, and other government agencies in ilorin.

            However, having determined the project cost, then it will be obvious to the client that he has the financial capability of the project. But if not, he may urge the professionals to redesign the drawing to suit his financial capability instead of abandoning or diverting the money into another different line. This helps the building client, professional and the contractors against abandonment of the project.

            More so, it reveals the importance of contract drawings in the building industry and also to know that contract drawings can elongate the stipulated contract period set in the bill of quantities, which will eventually bounce back on the contract sum by increasing it to another figure.

1.7     DEFINITION OF TERMS

1.7.1 COST: Is the actual expenditure incurred in securing a particular service (tangible or intangible) or a defined property, place or at a particular time.

1.7.2 DRAWING: This is known to be a communication medium whose purpose is to graphically convey the design requirement for a construction project.

1.7.3 BILL OF QUANTITY: This is the document that includes the analysis of building elements showing the quantities of each element with their unit rate.

1.7.4 PROJECT: Is the quantity of building work that is organized carefully and designed to achieve a particular aim,

1.7.5 VARIATION: Is an addition or omission of work as originally included in the bill of quantity which is prepared under certain condition of contract.

1.7.6 FINAL PROJECT COST: This can be said to be the initial cost i.e it is the cost incurred on a building project starting from the inception up to the practical completion of a project.

1.7.7 SCALE: This is a term in building which is numeric figure showing the relationship between the actual sizes of something and a diagram which represent it.

1.7.8 CLAIM: Is a request by the contractor for recompense for some loss or expenses that he has suffered or an attempt to avoid the requirement to pay liquidated and ascertain damages.

1.7.9 FLUNCTUATION: It is the dramatic increase or decrease in the price of labour plants, and goods after the data of tender.

1.8.0 TIME OVERRUN: This is the increase in the length of time originally stipulated for a particular project.

1.8.1 REGRESSION ANALYSIS: This is a statistical  method which test the hypothesis about the linear relationship between to variables and likewise for predictions.  

 

.



TYPE IN YOUR TOPIC OR KEYWORD AND CLICK SEARCH:

HOW TO GET YOUR COMPLETE PROJECT MATERIAL INSTANTLY

  • * Select 3 free project topics of your choice from your Department

    * Submit the 3 project topics to your Supervisor for his or her Approval

    * Call our 24/7 customer service desk or WhatsApp Chat# (+234) 0803-766-4978 and get your project topics and complete material instantly.

    * You can also send an Email to [email protected]

    * All project materials on this website are well researched by professionals with high level of professionalism.


TESTIMONIES FROM OUR CLIENTS

Please feel free to carefully review some written and captured responses from our satisfied clients.


  • Debby Henry George, Massachusetts Institute of Technology (MIT), Cambridge, USA.

    "Exceptionally outstanding. Highly recommend for all who wish to have effective and excellent project defence. Easily Accessable, Affordable, Effective and effective."

  • Hilary Yusuf, United States International University Africa, Nairobi, Kenya.

    "I saw this website on facebook page and I did not even bother since I was in a hurry to complete my project. But I am totally amazed that when I visited the website and saw the topic I was looking for and I decided to give a try and now I have received it within an hour after ordering the material. Am grateful guys!"

  • Debby Henry George, Massachusetts Institute of Technology (MIT), Cambridge, USA.

    "Researchwap.net is a website I recommend to all student and researchers within and outside the country. The web owners are doing great job and I appreciate them for that. Once again, thank you very much "researchwap.net" and God bless you and your business! ."

  • Lamilare Valentine, Kwame Nkrumah University, Kumasi, Ghana.

    "Great User Experience, Nice flows and Superb functionalities.The app is indeed a great tech innovation for greasing the wheels of final year, research and other pedagogical related project works. A trial would definitely convince you."

  • Sampson, University of Nigeria, Nsukka.

    "I love what you guys are doing, your material guided me well through my research. Thank you for helping me achieve academic success."

  • Cynthia, Akwa Ibom State University .

    "researchwap.com is God-sent! I got good grades in my seminar and project with the help of your service, thank you soooooo much."

  • Elizabeth, Obafemi Awolowo University

    "Sorry, it was in my spam folder all along, I should have looked it up properly first. Please keep up the good work, your team is quite commited. Am grateful...I will certainly refer my friends too."

  • Ali Olanrewaju, Lagos State University.

    "Am happy the defense went well, thanks to your articles. I may not be able to express how grateful I am for all your assistance, but on my honour, I owe you guys a good number of referrals. Thank you once again."

  • Willie Ekereobong, University of Port Harcourt.

    "My Dear Researchwap, initially I never believed one can actually do honest business transactions with Nigerians online until i stumbled into your website. You have broken a new legacy of record as far as am concerned. Keep up the good work!"

  • Theressa, Igbinedion University.

    "WOW, SO IT'S TRUE??!! I can't believe I got this quality work for just 5k...I thought it was scam ooo. I wouldn't mind if it goes for over 5k, its worth it. Thank you!"

  • Joseph, Abia state Polytechnic.

    "I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much researchwap.com, infact, I owe my graduating well today to you guys...."

  • Christiana, Landmark University .
    Christiana, Landmark University .

    "My friend told me about ResearchWap website, I doubted her until I saw her receive her full project in less than 15 miniutes, I tried mine too and got it same, right now, am telling everyone in my school about researchwap.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work"

  • Musa, Federal University of Technology Minna

    "I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!."

  • Ali Obafemi, Ibrahim Badamasi Babangida University, Niger State.

    "I was scared at first when I saw your website but I decided to risk my last 5k and surprisingly I got my complete project in my email box instantly. This is so nice!!!."


  • To contribute to our success story, send us a feedback or please kindly call 2348037664978.
    Then your comment and contact will be published here also with your consent.
    Thank you for choosing researchwap.com.

FREQUENTLY ASKED QUESTIONS

  • 1. How can I get the complete project if I order?

    AFTER FOLLOWING THE PAYMENT PROCEDURES HERE, AND WE RECEIVE YOUR DETAILS AS SMS ON 08037664978 or as mail to [email protected], THE MATERIAL WILL BE ATTACHED AND MAILED TO YOUR EMAIL ADDRESS WITHIN 30 MINUTES, AND A NOTIFICATION OF THE DELIVERY WILL BE SENT TO YOUR PHONE NUMBER.

    2. How will my payment be confirmed?

    FOLLOW THE PAYMENT INSTRUCTIONS FOUND ON THE PAYMENTS PAGE. NOTE: Payment information is required for Payment Confirmation.

    3. One of your topics suites my project, but the case study is different. What step should I take?

    Students are always advised to use our materials as guide. However, if you have a different case study, you may need to consult researchwap.com Depending on similarity of the organization/industry (case study) you may modify to, if you wish.

    4. How long does it take to get the complete project?

    Depending on how fast your payment and details is acknowledged by us, you will get the complete project within 30 minutes. However, on a very good day you can still get it within 15 minutes!

    5. Why should I trust this website?

    We are well aware of fraudulent activities (scam) that have been happening on the internet. It is unfortunate, but hopefully declining. However, we wish to re-assure our esteemed clients that we are genuine and our services is authentic, if not, we would not post our account details, email address, phone number or any personal details that could be traceable. Free chapter 1 is always given on the site to prove to you that we got the material. If you are unable to view the free chapter 1 send an email or SMS containing your name, topic, with the subject head "FREE CHAPTER 1" to [email protected] or 08037664978 plus the topic. You will get the free chapter 1 within an hour.

    6. Do you accept ATM payments and Online Transfers?

    Yes. We accept ATM transfers and online payments. FOLLOW THE PAYMENT INSTRUCTIONS FOUND ON THE PAYMENTS PAGE.

    7. Is it a complete research project or just materials?

    Yes it is a complete research project. We send complete project materials (i.e. chapters 1-5, full references, and questionnaires/secondary data to your email address after payment confirmation.

    8. How can I pay Online with my ATM card?

    1. Visit an ATM

    2. Insert your card

    3. Select Quickteller

    4. Select "Pay bills"

    5. Choose your account type

    6. Select "Others"

    7. Enter 322222 as the payment code

    8. Enter your phone number as "Customer Reference"

    9. Accept the N1.00 amount displayed

    10. Follow prompts to complete the transaction

    9. How will I receive a software?

    A link to download the software will always be on the first page of the material.

    10. I have a fresh topic that is not on your site. How do I go about it?

    We have professional writers in management sciences, computer science and social sciences. If you have a fresh topic, just click this hire a writer link, fill the form, submit the details and one of our writers will contact you shortly.