BUDGET AS A TOOL FOR PLANNING AND CONTROLLING IN AN ORGANISATION. (A CASE STUDY OF HOTEL INDUSTRY IN LAGOS STATE NIGERIA)

 BUDGET AS A TOOL FOR PLANNING AND CONTROLLING IN AN ORGANISATION. (A CASE STUDY OF HOTEL INDUSTRY IN LAGOS STATE NIGERIA)   ResearchWap         TABLE OF CONTENTS CHAPTER ONE

1.0     INTRODUCTION

1.1     Background to the study

1.2     Statement of the Problem

l.3      Purpose / objective of the study

1.4     Research questions

1.5     Research hypotheses

1.6     Significance of the study

1.7     Scope and limitations of the study

1.8     Brief description of selected hotels

References

CHAPTER TWO

2.0     LITERATURE REVIEW

2.1     Introduction

2.2     The concept of budgeting

2.3     Principles of budgeting

2.4     Prerequisites for effective

2.5     Budgetary system

2.6     Budgetary control

2.7     Behavioural implications of budgeting

2.8     Types of budgets

2.9     Budgeting techniques

2.10   Dynamism

2.11   Dynamic budgeting techniques

2.12   Budget and strategy

CHAPTER 3

RESEARCH METHODOLOGY

3.0     INTRODUCTION

3.1     Restatement of research questions and hypothesis

3.2     Research design

3.3     Sampling procedure

3.4     Data collection procedure

3.5     Questionnaire design

3.6     Statistical tools

CHAPTER FOUR  

DATA PRESENTATION AND ANALYSIS

4.0     INTRODUCTION

4.1     Characteristics of the population

4.2     Presentation of data

4.3     Analysis of data

CHAPTER FIVE

SUMMARY, CONCLUSIONS AND RECOMMENDATIONS

5.1     SUMMARY

5.2     CONCLUSIONS

5.3     RECOMMENDATIONS

BIBLIOGRAPHY

CHAPTER ONE

INTRODUCTION

1.1     BACKGROUND TO THE STUDY

There is the need for optimization of the scarce resources available to organizations, that is available resources are to be put to their most optimal or profitable use. Since these resources are scarce, a plan has to be drawn to eliminate wastage and arbitrary resource allocation. This trend of thought brings us to the "concept of budgeting".

An organization plans ahead in terms of sources of revenue and avenues of expenditure within a specific time frame. Irrespective of the fact that it is privately or publicly owned, organizations find it of utmost importance to prepare budgets and put in place budgetary controls for the purpose of achieving the best possible results.

Omolehinwa (2001 :309) defines budgeting as "the plan of the dominant individuals in an organization expressed in monetary terms and subject to the constraints imposed by other participants and the environment indicating how the available resources may be utilized to achieve whatever the dominant individuals agree to be the organization’s 'priorities'.

In real world policy- and decision-making, information is intertwined with, and therefore reflects, interests and ideologies of various stakeholders (Weiss 1983). The information-content of (performance) measurement systems has an impact on how management and policy are defined, controlled, reported on and legitimized (Bouckaert 1995:384).

Thus the information-content of budgetary control systems can be part of strategies to create meaning, exercise control or establish legitimacy. (Meyers 1994; Rubin 1997).

Schick (1996) identified three ideal-type budget functions: control, management and planning and throughout the 20th century, other functions have been added to those outlined by Schick, for instance achieving savings or increasing accountability (Rubin 1996). As a result budget processes have gradually accumulated functions (Caiden 1988). Contemporary budget systems can thus be understood as multi-functional, multi-formatted and multi-procedural phenomena. Budget reform then can be described as shifts in functions, formats and procedures.

1.2     STATEMENT OF THE PROBLEM

The focus on improving financial control has resulted in introducing more sophisticated financial accounting techniques in organizations, requiring long-term financial planning, and more comprehensive financial statements and financial audits. The performance oriented reforms at this level have focused on strategic and performance planning, aligning budget formats to these performance plans, linking performance monitoring with accrual and cost accounting and conducting performance audits.

It is a common practice for corporate bodies to prepare their yearly budget proposals for approval, the budget approval in most cases is hinged on the performance and actualization of the previous years' budgets.

However the underlying problem of the budgetary system is its strict implementation within the dynamic of an ever changing business and political environment of the corporate business world.

Thus for corporate management, budgeting and budgetary controls may be reviewed periodically to attain given objectives with organizational goals.

That practice of performance measurement against plans would make management able to take remedial action against variances in order to bring the deviating operations/departments back on course.

1.3     PURPOSE / OBJECTIVE OF THE STUDY

The purpose of this study is to examine how budgeting and budgetary control has been used as a tool for effective managerial planning and control in organizations in the hotel industry.

It will highlight the budgeting and budgetary control procedures as they apply to these organizations and the recent innovation in budgeting and the constraints of administration of budgetary control for effective decision making and attainment of organisational goals/plans.

1.4     RESEARCH QUESTIONS

This study attempts to proffer answers to some relevant research questions, and is meant to give a thorough insight into the analysis of the concepts and objectives of the study that would enable the researcher to extract useful deductions from the research work.

Are there qualified and experienced manpower adequate for the formulation of the budgetary control techniques and budget preparation? What types of budgetary and budgetary control systems are available? What causes inefficiency in the budgetary process? What is the root cause of poor budget implementation and budgetary control in organizations? What are the available budgetary control techniques used by the organization? What other control techniques are available other than budgetary control methods which the organization uses? To what extent does the organization’s budget control its activities?

1.5     RESEARCH HYPOTHESES Hypothesis 1

Ho:    There are not enough qualified and experienced manpower for the formulation and implementation of the budgetary control techniques.

H1:    There are enough qualified and experienced manpower for the formulation and implementation of the budgetary control techniques.

Hypothesis 2

Ho:    The organization’s budget to a large extent does not control its operations and activities.

H1:     The organization’s budget to a large extent controls its operations and activities.

1.6     SIGNIFICANCE OF THE STUDY

The significance of this research project is that budget functions always involve an element of control (top-down) as well as an element of accountability (bottom-up). Control and accountability may thus be regarded as 'permanent' budget functions. The way in which these permanent functions are defined however, has varied according to time and place.

The place under scrutiny in this study is the hospitality industry where the purpose has been to use the budget as a management policy tool and the concept of accountability has been defined in terms of quality of service clients. Where the purpose has been to use the budget as an instrument for financial control, accountability has been defined in terms of detailed line-items. Where the purpose has been to improve management, accountability has been defined in terms of performance or results. These 'purposes' can be regarded as 'variable' functions, whose dominance has been contingent with changes in the administrative, political and societal context and in the perceptions and behaviour of the all levels of management in the hospitality and tourism sector of the economy.

1.7     SCOPE AND LIMITATIONS OF THE STUDY

The study concentrated on the problems associated with budgeting and budgetary control which have brought about changes in policy from the use of a planning programme budgeting system.

This study covered practice and problems of the budget process in relation to organizations in the hotel industry. Specifically the five selected hotels are Sheraton Hotel and Towers, Federal Palace Hotel and Suites, Lagos Airport Hotel, Ikeja Palace Hotel and Eko Hotel and Suites; all located in Lagos.

However the limitations of this study included the difficulty in getting extremely busy financial executives and officials to fill the questionnaire and fear of information divulgence. Non-disclosure letter, particularly to competitors was submitted to allay fear by the researcher.

In addition some respondents did not answer correctly some of the questions in the questionnaire while a few others returned partially filled questionnaires.

1.8     BRIEF DESCRIPTION OF SELECTED HOTELS

Lagos Airport Hotel, was established in 1942 as 'Grand Hotel', present owners bought it through the Western Region Government in 1959 and it became a subsidiary of Odua Investment Company. Incorporated in 1961 as a Private Limited Liability Company. Located on Obafemi Awolowo Way, Ikeja. Presently it has 277 rooms and suites, halls, restaurant, bars and swimming pool. Other hotels in Odua group are Lafia Hotel and Premier Hotel, both located at Ibadan.

Eko Hotel and Suites was established in 1974 but started operation in 1977, jointly owned by Lagos State Government (25%) and OHA Ltd - a French company (75%). Located on Adetokunbo Ademola Street, Victoria Island overseeing the Atlantic Ocean and Kuramo Lagoon. Eko Hotel and Suites is made up ofEko Hotel, Eko Suites, Kuramo Lodge and Ocean View Restaurant. Presently it has 604 rooms and suites, ballrooms, restaurant, exhibition centre, bars, sports / health club and swimming pool.

Lagos Sheraton Hotel and Towers, a public quoted company, IS owned majorly by Ikeja Hotels PIc. Sheraton was opened in 1985. It is managed and operated formally by Sheraton Overseas Management Corporation and presently by Starwood Hotels and Resorts Inc and located on Mobolaji Bank Anthony Way, Ikeja. Presently it has 332 rooms and suites, ballrooms, night club, discotheque, restaurant, exhibition centre, bars, sports / fitness centre and swimming pool.

Federal Palace Hotel and Suites, still undergoing renovation on one of two wings was built in 1960 at the dawn of Nigeria's independence, incorporated in 1964 and owned by the Federal Government of Nigeria until 1992 when it was acquired by The Tourist Company of Nigeria. One of the wings was built to coincide with Festival of Art and Culture (FESTAC) '77. Located on Ahmadu Bello Way, Victoria Island overlooking Lagos Harbour. Presently it has about 632 rooms and suites, ballrooms, restaurant, mini-bars, sports and health club and swimming pool.

Ikej a Palace Hotel, is privately owned by His Royal Highness, Oba G.

A. Banjo, the Ajalaye of Ilugun South, Alaro Ogun State, was established in 1979 located on Toyin Street right at Toyin, Allen and Opebi Roundabout. Presently it has 20 rooms and casino, restaurant, bars, sports/ health club and houses many shops including Courier Company, bureau de change and boutique.

.

Click Here To Get The Complete Project »

How To Write Chapter Three Of Your Research Project (Research Methodology)

  • Methodology In Research Paper


    Chapter three of the research project or the research methodology is another significant part of the research project writing. In developing the chapter three of the research project, you state the purpose of research, research method you wish to adopt, the instruments to be used, where you will collect your data, types of data collection, and how you collected it.

    This chapter explains the different methods to be used in the research project. Here you mention the procedures and strategies you will employ in the study such as research design, study design in research, research area (area of the study), the population of the study, etc. You also tell the reader your research design methods, why you chose a particular method, method of analysis, how you planned to analyze your data.

    Your methodology should be written in a simple language such that other researchers can follow the method and arrive at the same conclusion or findings.

    You can choose a survey design when you want to survey a particular location or behavior by administering instruments such as structured questionnaires, interviews, or experimental; if you intend manipulating some variables.

    The purpose of chapter three (research methodology) is to give an experienced investigator enough information to replicate the study. Some supervisors do not understand this and require students to write what is in effect, a textbook.

    A research design is used to structure the research and to show how all of the major parts of the research project, including the sample, measures, and methods of assignment, work together to address the central research questions in the study. The chapter three should begin with a paragraph reiterating the purpose of research. It is very important that before choosing design methods try and ask yourself the following questions: Will I generate enough information that will help me to solve the research problem by adopting this method?

    Method vs Methodology

    I think the most appropriate in methods versus methodology is to think in terms of their inter-connectedness and relationship between both. You should not beging thinking so much about research methods without thinking of developing a research methodology.

    Metodologia or methodology is the consideration of your research objectives and the most effective method and approach to meet those objectives. That is to say that methodology in research paper is the first step in planning a research project work.

    Design Methodology: Methodological Approach

    Example of methodology in research paper, you are attempting to identify the influence of personality on a road accident, you may wish to look at different personality types, you may also look at accident records from the FRSC, you may also wish to look at the personality of drivers that are accident victims, once you adopt this method, you are already doing a survey, and that becomes your metodologia or methodology.

    Your methodology should aim to provide you with the information to allow you to come to some conclusions about the personalities that are susceptible to a road accident or those personality types that are likely to have a road accident.

    The following subjects may or may not be in the order required by a particular institution of higher education, but all of the subjects constitute a defensible in metodologia or methodology chapter.

    Click here to complete this article - How To Write Chapter Three Of Your Research Project (Research Methodology)

TESTIMONIES FROM OUR CLIENTS


Please feel free to carefully review some written and captured responses from our satisfied clients.

  • "I love what you guys are doing, your material guided me well through my research. Thank you for helping me achieve academic success."

    Sampson, University of Nigeria, Nsukka.
  • "researchwap.com is God-sent! I got good grades in my seminar and project with the help of your service, thank you soooooo much."

    Cynthia, Akwa Ibom State University .
  • "Sorry, it was in my spam folder all along, I should have looked it up properly first. Please keep up the good work, your team is quite commited. Am grateful...I will certainly refer my friends too."

    Elizabeth, Obafemi Awolowo University
  • "Am happy the defense went well, thanks to your articles. I may not be able to express how grateful I am for all your assistance, but on my honour, I owe you guys a good number of referrals. Thank you once again."

    Ali Olanrewaju, Lagos State University.
  • "My Dear Researchwap, initially I never believed one can actually do honest business transactions with Nigerians online until i stumbled into your website. You have broken a new legacy of record as far as am concerned. Keep up the good work!"

    Willie Ekereobong, University of Port Harcourt.
  • "WOW, SO IT'S TRUE??!! I can't believe I got this quality work for just 3k...I thought it was scam ooo. I wouldn't mind if it goes for over 5k, its worth it. Thank you!"

    Theressa, Igbinedion University.
  • "I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much researchwap.com, infact, I owe my graduating well today to you guys...."

    Joseph, Abia state Polytechnic.
  • "My friend told me about ResearchWap website, I doubted her until I saw her receive her full project in less than 15 miniutes, I tried mine too and got it same, right now, am telling everyone in my school about researchwap.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work"

    Christiana, Landmark University .
  • "I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!."

    Musa, Federal University of Technology Minna
  • "I was scared at first when I saw your website but I decided to risk my last 3k and surprisingly I got my complete project in my email box instantly. This is so nice!!!."

    Ali Obafemi, Ibrahim Badamasi Babangida University, Niger State.
  • To contribute to our success story, send us a feedback or please kindly call 2348037664978.
    Then your comment and contact will be published here also with your consent.

    Thank you for choosing researchwap.com.